Constitution Park Improvements.pdf

PDF 88 KB Posted

Attached to
Subcontractor Opportunities* Constitution Park Improvements
Solicitation number
47222
Issued by
Los Angeles County, California

About this file

This is a Notice Inviting Sealed Bids issued by the City of Bellflower, California for Constitution Park Improvements (Project No. 47222). The project consists of park improvements and related work, requiring all necessary equipment, materials, transportation, and labor as detailed in plans on file with the City's Public Works Department. Sealed bids must be submitted to the City Clerk's office at 16600 Civic Center Drive, Bellflower, CA 90706 by 11:00 a.m. on Tuesday, September 22, 2026. A mandatory jobsite walk is scheduled for Wednesday, September 9, 2026 at 10:00 a.m. at 8831 Rose St., Bellflower, CA 90706. Attendance at the jobsite walk is mandatory for prime contractor bidders; failure to attend will result in bids being deemed non-responsive. Following the Notice to Proceed, the contractor shall have sixty (60) calendar days to complete the work. Bids will be publicly opened on September 22, 2026 at 11:00 a.m. Work must be performed in accordance with Specification No. 52604 filed with the City's Public Works Department.

The Engineer's Estimate of cost is $664,100.00. Bidders must hold a valid Class B Contractor's License issued in accordance with California Business and Professions Code Chapter 9, Division III at the time of bid submission. Each bid must include a certified or cashier's check, bidder's bond, or cash deposit equal to at least ten percent (10%) of the bid price; the successful bidder's deposit will be forfeited if the contractor fails to enter into the contract within ten (10) days of award notice. The project is subject to federal and state prevailing wage requirements for Los Angeles County, with the contractor required to post prevailing wage schedules at each jobsite. Five percent (5%) will be retained from each progress payment, with the remainder less all previous payments paid to the contractor. Contractors may substitute securities for retention monies or request escrow placement pursuant to Public Contracts Code Section 22300, at the contractor's own expense including any costs incurred by the City. The project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations and must comply with all applicable Labor Code requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE INVITING SEALED BIDS

FOR CONSTITUTION PARK IMPROVEMENTS

IN THE CITY OF BELLFLOWER

CITY PROJECT NO. 47222

The City of Bellflower is accepting sealed bids in the City Clerk’s office, 16600 Civic Center Drive, Bellflower, CA 90706, until 11:00 a.m. on:

TUESDAY, SEPTEMBER 22, 2026

at which time they will be publicly opened. Bids will not be accepted after that time. Each bid must be accompanied by a certified or cashier’s check or bidder’s bond payable to the order of the City of Bellflower or cash for an amount not less than ten percent (10%) of the bid price submitted, and the check, bond, or cash deposit of the successful bidder shall be forfeited to the City if such bidder fails to enter into the contract to perform the work within ten (10) days after written notice of award.

As described in the Bidding Documents, the bids are for a public works project (“Project”) which consists of an Click here to enter the project description and related work, including providing all necessary equipment, materials, transportation and labor for the project as shown on the plans on file with the City’s Public Works Department. The Engineer’s Estimate of cost is $ 664,100.00. Bids will be publicly opened on Tuesday, September 22, 2026 at 11:00 AM.

The contractor shall possess a Class B Contractor’s License. No bid will be accepted from a contractor who has not been licensed in accordance with the Provisions of Chapter 9, Division III, of the Business and Professions Code of the State of California at the time the bid is submitted.

Following the issuance of the Notice to Proceed, the contractor shall have sixty (60) calendar days to complete the work.

Work on the Project must be performed in strict conformity with Specification No. 52604, which is filed with the City’s Public Works Department. Copies of these specifications may be obtained by prospective bidders from the Public Works Department at no cost by contacting Kimberly Gonzalez at (562) 804-1424, ext. 2285 or via email at kgonzalez@bellflower.ca.gov.

A mandatory jobsite walk will be held on Wednesday, September 9, 2026, at 10:00 AM, at 8831 Rose St., Bellflower, CA 90706. Prospective bidders will have opportunity to examine the project site and are encouraged to raise any questions associated with the project and site. Attendance of the jobsite walk is mandatory for parties wishing to submit a bid as the Prime Contractor. Bidders who fail to attend the mandatory pre-bid meeting will be deemed non-responsive and their bids will not be considered. The purpose of this meeting is to review project requirements, including but not limited to HUD obligations, labor standards, and federal compliance requirements associated with this project.

The terms and conditions for bidding on the Project are described in the attached Bidding Instructions.

This project requires payment of Federal and State prevailing rates of wages for Los Angeles County. The contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at www.dir.ca.gov.

Note that the Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code §§ 1725.5 and 1771.4, to be nonresponsive.

Five percent (5%) will be deducted from each progress payment and retained by the City.

The remainder less the amount of all previous payments will be paid to the Contractor.

Pursuant to Public Contracts Code (“PCC”) § 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC § 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor’s request.

DATED this 28th day of August 2026.

CITY OF BELLFLOWER, CALIFORNIA

http://www.dir.ca.gov/

File details come from the government source that posted it. Updated .