About this file
This is a plans and specifications bid set document issued by the City of Laredo Engineering Department for the Concord Hills Boulevard Extension project (FY25-ENG-52). The project extends Concord Hills Boulevard from Los Presidentes Boulevard to Lomas Del Sur Boulevard and consists of a reinforced concrete pavement road of varying width with multiple storm drain crossings and preparation for future lane additions. The base bid includes 32 line items encompassing clearing and grubbing, subgrade preparation, 8.5-inch reinforced concrete pavement with mono curb, 30-inch and 36-inch storm sewer lines, concrete sidewalks, ADA flared ramps, concrete headwalls, junction boxes, curb inlets, 5-foot by 4-foot box culverts, and pavement markings and signage. Optional alternates include vehicle lanes, shared use path, and a full concrete intersection at the intersection with Lomas Del Sur Boulevard. Sealed bids must be submitted to the City Secretary's Office at 1110 Houston Street, Laredo, Texas, by the specified bid opening date. The construction contract time is stated in working days. The City reserves the right to award the contract based on the most advantageous alternative to the City and to reject any or all bids. A Notice of Award will be provided within 90 days of bid opening.
Bidders must submit either a cashier's check, certified check, or bid bond with a minimum Best's Rating of A in the amount of five percent of the total bid as a guarantee. For bids exceeding $50,000, the successful bidder must furnish a Performance Bond and Payment Bond equal to 100 percent of the total contract price issued by an insurance company licensed in Texas with a minimum Best's Key Rating of A. For bids of $50,000 or less, bonds are not required, but a Certificate of Insurance is mandatory, and the total contract price will be paid in one payment upon project completion and acceptance. The document includes provisions for the Davis-Bacon Act, Federal Labor Standards, the Build America, Buy America Act for structural and reinforcement steel, and compliance with state sales tax exemption rules. All lump sum and unit prices must be stated in both script and figures. Bidders electing to submit bids electronically via Cit-E-Bid must comply with electronic submission requirements, while mailed, telegraphic, or facsimile submissions are not permitted.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City Engineer
Joseph Neeb
City Manager
CITY OF LAREDO
ENGINEERING DEPARTMENT
PLANS AND SPECIFICATIONS FOR
FY25-ENG-52
Honorable Dr. Victor D. Treviño, Mayor
Ricardo "Rick" Garza
District IV
Eliud De Los Santos, P.E.
Ricardo Richie Rangel, Jr.
District II
Melissa R. Cigarroa
District III District VII
Alyssa Cigarroa
District VIII
Concord Hills Boulevard Extension
COUNCIL MEMBERS
Ruben Gutierrez, Jr.
District V
Dr. David Tyler King
District VI
Vanessa Perez
Gilbert Gonzalez
District I - Mayor Pro Tempore
1110 Houston St.
Laredo, Texas, 78040
08/21/2026
08/24/2026
Division A
Division B
Ethics Commission Rules
Section B-4
Section B-5
Section B-6
Section A-9
Contract Time & Liquidated Damages
Equal Opportunity Clause
Wage Determination
Inspection by City
Project Sign
Illegal Dumping
Checklist for Bidders
Performance Bond/Payment Bond
Contractors/Subcontractors Certificate of Insurance
Notice of Award
Notice to Proceed
Certificate of Owner’s Attorney
Section B-1
Section B-2
Section B-3
Prosecution and Progress
Measurement and Payment
Warranty Statement Form
Section C-11
Section C-8
Section C-9
Section C-10
Definition of Terms
Definition of Abbreviations
Instruction to Bidders
Award and Execution of Contract
Scope of Work
Control of Work and Materials
Legal Relations and Responsibilities to the Public
Section C-5
Section C-6
Section C-7
Section C-1
Section C-3
Section C-4
Information to Bidders
Advise to Bidders
Information to Contractors
Division C
Section C-2
Section A-6
Section A-10
Section A-11
Section A-12
Construction Contract
Notice to Bidders
Section A-7
Section A-8
Section A-1
Section A-2
Section A-3
Section A-4
Section A-5 Proposal, Affidavit, Bid Schedule, Information from Bidders, and Bid Bond
FY25-ENG-52
Concord Hills Boulevard Extension
TABLE OF CONTENTS
1110 Houston St.
Laredo, Texas, 78040
102 - EXCAVATION AND BACKFILL FOR UTILITIES
302 - STRUCTURAL EXCAVATION AND BACKFILL
304 - REINFORCED CONCRETE STORM DRAIN PIPE
310 - CONCRETE BOX CULVERTS
312 - MANHOLES AND INLETS
316 - CONCRETE ECASEMENT, CRADLES, SADDLES, AND COLLARS
402 - CLEARING AND GRUBBING
404 - GENERAL CONSTRUCTION AND PREPERATION OF SITE
406 - CONCRETE STRUCTURES
408 - RIPRAP
410 - REINFORCING STEEL
412 - WELDED WIRE FABRIC
416 - EXPANSION JOINT MATERIALS
418 - MEMBRANE CURING
422 - CONDUITS
430 - CONCRETE SIDEWALKS
502 - EXCAVATION AND EMBANKMENT OF STREETS
504 - CONCRETE
506 - CONCRETE CURB AND GUTTER
508 - MACHINE LAID CONCRETE CURB AND GUTTER
538 - PEDESTRIAN RAILING
602 - SILT FENCE
604 - EROSION CONTROL BALANKETS
606 - NPDES REQUIREMENTS
608 - HYDRO-MULCH SEEDING
610 - SEEDING
702 - PERMANENT TRAFFIC BARRICADES
704 - STREET SIGNS
706 - REFLECTORIZED PAVEMENT MARKINGS
712 - TRAFFIC CONTROL AND REGULATION
714 - LIGHTING AND TRAFFIC SIGNALS
804 - WORK PERFORMED ON NON-WORKING DAYS
Section D-1
Division D - Technical Provisions
Section D-2
Section D-3
Section D-4
Section D-5
Section D-6
Section D-7
Section D-8
Section D-9
Section D-10
Section D-11
Section D-12
Section D-13
Section D-14
Section D-15
Section D-16
Section D-17
Section D-18
Section D-19
Section D-20
Section D-21
Section D-22
Section D-23
Section D-24
Section D-25
Section D-26
Section D-27
Section D-28
Section D-29
Section D-30
Section D-31
Section D-32
1110 Houston St.
Laredo, Texas, 78040
Further, on federally funded projects, contractor must comply with the Federal Labor Standards
Provision, Davis Bacon Act, Equal Opportunity Clause, Wage Determination and HUD and Urban
Development Federal Requirements especially as it regards payrolls and basic records. All structural and reinforcement steel shall follow the Build America, Buy America Act (BABAA).
Each proposal and a proposal guaranty must be originals and must be sealed in an envelope plainly marked with the name of the project as shown above, and the name and address of the Bidder. For Bidders electing to submit
Bids and Bid Guaranties electronically via Cit-E-Bid, Bid Guaranties will be verified by the Owner prior to bid certification and electronic copies of Bid Guaranties will not be returned to Bidders. Mailed bids (i.e. USPS, FedEx, UPS), telegraphic, or facsimile submittals will not be allowed/considered. Only the bids and bid guaranties actually in the hands of the designated official at the time set in this Notice to Bidders shall be considered.
The City reserves the right to award the contract on the basis of the alternative which appears most advantageous to the City, to reject any or all bids, to waive objections based on failure to comply with formalities, and to allow the correction of obvious or patent errors. Bidders are expressly advised to review Section C-3 of the
General Conditions of the proposed contract as to the causes which may lead to the disqualification of a bidder and/or the rejection of a bid proposal. Unless all bids are rejected, Owner agrees to give Notice of Award of contract to the successful bidder within ninety (90) days from the date of the bid opening.
Page 1 of 3Information to Bidders
Bids shall be based on a per unit of work basis and shall include dollar amounts for each specific unit in improvements listed including those items listed as alternatives as per the proposal sheet included in the specifications of this project.
Construction contract time for the project is
SECTION A-2
INFORMATION TO BIDDERS
Sealed bids will be received at City Secretary’s Office, 1110 Houston Street, 3 rd floor, City Hall Building, Laredo, Texas, for the furnishing of all necessary materials, machinery, equipment, labor, superintendence, and all other services and appurtenances required for certain improvements in the City of Laredo and shall include acknowledgment of addenda submitted, and all other documents included in said bid call. Said bids shall be marked, FY25-ENG-52
Concord Hills Boulevard Extension
Working days
The purpose of the project is to extend Concord Hills Blvd. from Los Presidentes Blvd. to Lomas Del Sur Blvd.
The roadway project consists of a reinforced concrete pavement road of varying width with multiple storm drain crossings and preparation for future lane additions. Alternates include the potential addition of vehicle lanes, shared used path and a full concrete intersection at the intersection of proposed Concord Hills Blvd. with existing
Lomas Del Sur Blvd.
Bid proposals over $50,000.00 shall comply with all conditions of the bid documents.
Any other division or section of this project’s specifications having reference to Bid Guarantee, Cashier’s or
Certified Check, Bid Bond, Payment Bond, or Performance Bond, or having mention at all, to the requirements of bonds, is hereby amended to concur with the above conditions ONLY when the base bid is LESS THAN
$50,000.00.
Bidders for the construction work must submit a satisfactory cashier’s or certified check, or bidder’s bond having a minimum Best’s Rating A according to Best’s Key Rating Guide Latest Edition from a surety duly authorized and licensed in the State of Texas, payable without recourse to the order of the City of Laredo, Texas, in an amount not less than five percent (5%) of the total bid based on the bid which check or bond shall be submitted as a guarantee that the bidder will enter into a contract, and execute performance and payment bonds within ten (10) days after Notice of Award of contract is given to him for contracts in excess of $50,000.00. Bids without the required check or bond will NOT be considered.
The successful bidder for the construction of the improvements must furnish a Certificate of Insurance, and a satisfactory Performance Bond in the amount of 100% of the total contract price, and a satisfactory Payment
Bond in such amount, duly executed by such bidder as principal and by a corporate surety duly authorized so to act under the laws of the State of Texas. The successful bidder will be required to provide Performance and
Payment Bonds issued by an insurance company which meets the minimum State requirements and is licensed in the State of Texas, and has a Best’s Key according to Best’s Key Rating Guide Latest Edition as follows:
A
A
Minimum Best’s RatingConstruction Contract
50,001 - 250,000
250,000 - 1,000,000
Copies of the plans and specifications may be reviewed free of charge at the City Engineer's office, 1110 Houston
Street, Laredo, Texas, or on the Cit-E-Bid web page under the Attachments Section.
https://cityoflaredo.ionwave.net/
A
All lump sum and unit prices must be stated in both script and figures.
Information to Bidders Page 2 of 3
In the event the base bid amount is $50,000.00 or LESS than $50,000.00, a Payment Bond and
Performance Bond will NOT BE REQUIRED. A Bid Guarantee in the form of a Cashier’s or Certified Check or Bid Bond and the Certificate of Insurance however, WILL BE REQUIRED. Under the above conditions, the successful bidder for the project is hereby advised that the total contract price will be paid in ONE
PAYMENT upon completion and acceptance of the project by the City of Laredo. Cashier’s checks are not to be released until a contract for the project has been approved by City Council and signed by the
City Manager.
Over 1,000,000
Bidders are expected to inspect the site of the work and to inform themselves regarding all local conditions.
The Instructions to Bidders, Forms of Bid, Form of Contract, Plans, Specifications, Form of Bid Bond, Performance and Payment Bonds and other contractual documents may be examined free of charge at the City of Laredo Engineering Department, 1110 Houston Street, Laredo, Texas 78040.
Bidders are advised to contact the City Engineering Department at 1110 Houston Street, Laredo, Texas, 78040, telephone number (956) 791-7346, for visits to project site, and for any additional information required on the project.
Information to Bidders Page 3 of 3
Contractor’s attention is directed to Special Provision 000-6233, “Important Notice to Contractors” and “Statement of Materials and Other Charges” which will be included in all projects, beginning with the September 1991 letting.
These establish the procedures whereby the Contractor will be permitted to obtain an exemption from the sales tax on certain materials. See Comptroller’s Rule 2.291 and Texas Tax Code Chapter 151, as mended by House
Bill Number 11, Acts 1991, 72nd Legislature, First called Session. The Contractor will be required to separate the charges for materials from all other charges and will be furnished an Exemption Certificate of reach contract the
Department. Also, the Contractor must issue resale certificates to suppliers. Sales tax permit applications and information regarding resale certificates may also be obtained by calling the State Comptroller’s toll free number 1-
800-252-5555.
SECTION A-3
ADVISE TO BIDDERS
Project:
FY25-ENG-52
Concord Hills Boulevard Extension
Page 1 of 1Advise to Bidders
The Contractor’s attention is directed to the State of Texas Comptroller of Public Accounts Limited Sales Excise and Use Tax Rules and Regulations, Paragraph 3 of Ruling No. 9. Repairmen and Contractors (amended April
3, 1972). Reference Article 20.01 (T). Upon compliance with certain conditions, this ruling provides for exemption from this tax of materials incorporated into work done for an exempt agency under a Contract. The
City is an exempt agency.
Any Bidder may elect to exclude this sales tax from his bid. If the Bidder submitting the lowest acceptable bid for performing the work on this project elects to comply with the above ruling on any bid item included in this Contact by obtaining any necessary permit or permits from the State Comptroller allowing the purchase of material for incorporation into this project without having to pay the Limited Sales, Excise and Use Tax at the time of purchase, he shall upon Award of Contract submit a statement in satisfactory form in which his bid prices to the
City for materials are listed separately from all other charges, either by bid item or by total as required by the comptroller. This statement shall be included in and made part of the Contract.
The City will make no further allowance for and will make no price adjustment above or below the originally bid unit price on account of this tax. It shall be the Contractor’s sole responsibility, if he elects to exclude the sales tax from his bid, to comply with the aforementioned Ruling No. 9 and with any other applicable rules, regulation, or laws pertaining to the Texas Limited Sales, Excise and Use Tax which may now or at any time during the performance of this Contract be in effect, and the City shall have no responsibility for any sales or use tax which the Contractor may be required to pass as a result of his failure or the City’s failure to comply with said rules, regulations or laws, or as the result of the performance of the Contract or any part thereof by the Contractor.
Bidders are cautioned that materials which are not permanently incorporated into the work are not eligible for exemption and are not to be included in the statements as “Materials” (example: fuel, lubricants, tools, forming materials, etc.).
The Contractor’s attention is directed to Special Provision 000-6233, “Important Notice to Contractors”, and
“Statement of Materials and Other Charges” which will be included in all projects, beginning with the September, 1991 letting. These establish the procedures whereby the Contractor will be permitted to obtain an exemption from the sales tax on certain materials. See Comptroller’s Rule 3.291 and Texas Tax Code, Chapter 151, as amended by House Bill Number 11, acts 1991, 72nd Legislature, First Called Session. The Contractor will be required to separate the charges for materials from all other charges and will be furnished an Exemption
Certificate for each contract by the Department. Also, the Contractor must issue resale certificates to suppliers.
Sales tax permit applications and information regarding resale certificates may be obtained by calling the State
Comptrollers’ toll fee number 1-800-252-5555.
SECTION A-4
INFORMATION TO CONTRACTORS
PROJECT:
FY25-ENG-52
Concord Hills Boulevard Extension
Issued 10/29/91
Information to Contractors
SPECIAL PROVISION
No. 000-6233
IMPORTANT NOTICE TO CONTRACTORS
In order to comply with the requirements of Rule 3.291, as mentioned above, it will be necessary for the
Contractor to obtain a sales tax permit.
The Contractor’s attention is directed to Rule 3.291, paragraphs (a) (1), defining separated contracts, subsection
(b) (3) discussing separated contracts, and subsection (c) discussing exempt contracts. Reference: Texas Tax
Code, Chapter 151.
Contractors should note those organizations in subsection (c) that the rule shows as being exempt no longer qualify for the exemption. The rule states that contractors improving realty for organizations listed in Texas Tax
Code 151.309 and 151.310 are exempt from tax. THIS IS NO LONGER TRUE EFFECTIVE WITH
CONTRACTS SIGNED ON OR AFTER AUGUST 15, 1991.
Only those contracts with school districts and nonprofit hospitals qualify for the exemption discussed in subsection (c) of Rule
3.291.
If the low bidder elects to operate under a separated contract as defined by Rule 3.291, by obtaining the necessary permits from the State Comptroller’s office allowing the purchase of materials for incorporation in this project without having to pay the Limited Sales and Use Tax at the time of purchase, the low bidder shall identify separately from all other charges the total agreed contract price for materials incorporated into the project. This form shall be filled out by the low bidder in each of the two bound copies of the contract. Total materials shall only include materials physically incorporated into the realty.
If the Contractor operates under a “separated contract”, the Department will furnish the Contractor with an exemption certificate for the applicable materials.
The Comptroller is amending the rule to reflect this change.
Sales tax application for a sales tax permit and information regarding resale certificates may be obtained by writing to:
Comptroller of Public Accounts
Capital Station
Page 2 of 3Information to Contractors
It will also be necessary that the contractor issue resale certificates to his suppliers.
Austin, Texas 78774
The Contractor may also receive information or request sales tax permit applications by calling the State
Comptrollers’ toll-free number 1-800-252-5555.
Subcontractors are eligible for sales tax exemption if the subcontract is made in such manner that the charges for materials is separated from all other charges. The procedure described above will affect a satisfactory separation. When subcontractors are handled in this manner, the Contractor must issue a resale certificate to the subcontractor and the subcontractor, in turn, must issue a resale certificate to his supplier.
Information to Contractors Page 3 of 3
ALL OTHER CHARGES: $___________
*TOTAL: $___________
*This total must agree with the total figure shown in the Item and Quantity Sheets in the bound contract.
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor.
NOTE: ONLY THE COPY OF THIS FORM IN THE BOUND CONTRACTS IS TO BE FILLED OUT.
MATERIALS INCORPORATED INTO THE PROJECT: $___________
FY25-ENG-52
Concord Hills Boulevard Extension
PROJECT:
STATEMENT OF MATERIALS AND OTHER CHARGES
Required Submission of one original of the bid package
CITY OF LAREDO
FY25-ENG-52
sheets from Section A-5
Initial & date acknowledgement of:
Addenda if any, Wage
Determination, Labor Provisions, and
Affirmative Actions Programs
Concord Hills Boulevard Extension
A-5
Proposal Page 1 of 17
To: The City of Laredo, Texas
Address: ________________________
Phone: ________________________
Addendum No. 2: _____________________________________________________________________
Labor Provisions:_________________________________________________________________
Affirmative Action Program:________________________________________________________
_____________________________________________________________________Addendum No. 7:
FY25-ENG-52
PROPOSAL
COVER PAGE FOR BID
Wage Determination:______________________________________________________________
Addendum No. 4: _____________________________________________________________________
Addendum No. 5:
Addendum No. 6:
SECTION A-5
BID PROPOSAL
Honorable Dr. Victor D. Treviño, Mayor
From: _________________________________
Contractor
Addendum No. 8: _____________________________________________________________________
Acknowledgment of Addenda: (Please initial and date):
Concord Hills Boulevard Extension
Pursuant to Notice to Bidders, the undersigned bidder hereby proposes to furnish the labor, materials, and equipment in accordance with the plans and specifications, general conditions of the agreement, special provisions of the Agreement, and Addenda, if any. The bidder binds himself upon acceptance of his proposal to execute a contract and bonds accompanying form of performing and completing the said work within the time stated as required by the detailed specifications at the following unit prices. The quantities shown below are based on the Engineer’s estimate of quantities and it is agreed that the quantities may be increased or diminished, and may be considered necessary in the opinion of the City of Laredo, Texas to complete the work fully as planned and contemplated, and that all quantities of work, either increased or decreased, are to be performed at the unit prices set forth below (except as provided in the General Conditions of the Agreement or the specifications, the contract documents).
Acknowledgment of Addenda: (Please initial and date):
Addendum No. 1: _____________________________________________________________________
Project:
Addendum No. 3: _____________________________________________________________________
Proposal Page 2 of 17 the party making the foregoing proposal or bid, that such proposal or bid is genuine and not collusive or sham;
that said Bidder has not colluded, conspired, connived or agreed, directly or indirectly, with any Bidder or
Person, to put in a sham bid or to refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference, with any person, to fix the bid price or affiant or of any other Bidder or to fix any overhead, profit or cost element of said bid price, or of that of any other Bidder, or to secure any advantage against the City of Laredo or any person interested in the proposed Contract; and that all statements in said proposal or bid are true.
Signature of (Print and Sign)
STATE OF TEXAS {}
COUNTY OF WEBB {}
Project:
FY25-ENG-52
Concord Hills Boulevard Extension being first duly sworn, deposes and says
That he is
Form of Non-Collusive Affidavit:
A F F I D A V I T
(a Partner of Officer of the firm of, etc.)
Bidder, if the Bidder is an individual
Partner, if the Bidder is a Partnership
Officer, if the Bidder is a Corporation
My Commission expires
Notary Public
Subscribed and sworn before me this _____ day of _________, 20___.
Proposal Page 3 of 17
The Contractor’s attention is directed to Special Provision 000-6233, “Important Notice to Contractors”, and
“Statement of Materials and Other Charges” which will be included in all projects, beginning with the
September, 1991 letting. These establish the procedures whereby the Contractor will be permitted to obtain an exemption from the sales tax on certain materials. See Comptroller’s Rule 3.291 and Texas Tax Code, Chapter 151, as amended by House Bill Number 11, acts 1991, 72nd Legislature, First Called Session. The
Contractor will be required to separate the charges for materials from all other charges. Also, the Contractor must issue resale certificates to suppliers. Sales tax permit applications and information regarding resale certificates may be obtained by calling the State Comptrollers’ toll fee number 1-800-252-5555.
Concord Hills Boulevard Extension
FY25-ENG-52
PROJECT:
INFORMATON TO CONTRACTORS
Proposal Page 4 of 17
If the low bidder elects to operate under a separated contract as defined by Rule 3.291, by obtaining the necessary permits from the State Comptroller’s office allowing the purchase of materials for incorporation in this project without having to pay the Limited Sales and Use Tax at the time of purchase, the low bidder shall identify separately from all other charges the total agreed contract price for materials incorporated into the project. This form shall be filled out by the low bidder in each of the two bound copies of the contract. Total materials shall only include materials physically incorporated into the realty.
In order to comply with the requirements of Rule 3.291, as mentioned above, it will be necessary for the
Contractor to obtain a sales tax permit.
Sales tax application for a sales tax permit and information regarding resale certificates may be obtained by writing to:
The Comptroller is amending the rule to reflect this change.
The Contractor may also receive information or request sales tax permit applications by calling the State
Comptrollers’ toll-free number 1-800-252-5555.
Subcontractors are eligible for sales tax exemption if the subcontract is made in such manner that the charges for materials is separated from all other charges. The procedure described above will affect a satisfactory separation. When subcontractors are handled in this manner, the Contractor must issue a resale certificate to the subcontractor and the subcontractor, in turn, must issue a resale certificate to his supplier.
The Contractor’s attention is directed to Rule 3.291, paragraphs (a) (1), defining separated contracts, subsection (b) (3) discussing separated contracts, and subsection (c) discussing exempt contracts.
Reference: Texas Tax Code, Chapter 151.
Only those contracts with school districts and nonprofit hospitals qualify for the exemption discussed in subsection (c) of Rule 3.291.
IMPORTANT NOTICE TO CONTRACTORS
Comptroller of Public Accounts
Capital Station
Austin, Texas 78774
It will also be necessary that the contractor issue resale certificates to his suppliers.
Contractors should note those organizations in subsection (c) that the rule shows as being exempt no longer qualify for the exemption. The rule states that contractors improving realty for organizations listed in Texas
Tax Code 151.309 and 151.310 are exempt from tax. THIS IS NO LONGER TRUE EFFECTIVE WITH
CONTRACTS SIGNED ON OR AFTER AUGUST 15, 1991.
No. 000-6233
SPECIAL PROVISION
Proposal Page 5 of 17
NOTE:
*TOTAL:
ONLY THE COPY OF THIS FORM IN THE BOUND CONTRACTS IS TO BE FILLED OUT.
the subcontractor and the subcontractor, in turn, must issue a resale certificate to his supplier.
PROJECT:
FY25-ENG-52
Concord Hills Boulevard Extension
*This total must agree with the total figure shown in the Item and Quantity Sheets in the bound contract
For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor.
ALL OTHER CHARGES:
STATEMENT OF MATERIALS AND OTHER CHARGES
MATERIALS INCORPORATED INTO THE PROJECT:
Proposal Page 6 of 17
1.00
2.00
3.00
INFORMATION FROM BIDDERS
Project:
Date Completed:
Name of Project:
Value of Contract:
Date Completed:
Name of Project:
A confidential financial statement will be submitted by the apparent successful low Bidder only if the Owner deems it necessary
(Include name and experience record of the Superintendent)
Value of Contract:
Date Completed:
Experience Data:
IS NOT AN ACCEPTABLE ANSWER.
FY25-ENG-52
Statement of Qualifications: (Similar Projects Completed by Bidder)
Financial Status:
NOTE: TO BE SUBMITTED UPON REQUEST
MUST BE COMPLETED AND SUBMITTED WITH BID PROPOSAL
Concord Hills Boulevard Extension
Value of Contract:
Name of Project:
Proposal Page 7 of 17
NOTE:
IS NOT AN ACCEPTABLE ANSWER.
FY25-ENG-52
Concord Hills Boulevard Extension
Proposed Progress Schedules:
Project:
Data on Equipment to be used on the Work: (Include the number of machines, the type, capacity, age and conditions and location)
Subcontractors: (Submit a list of proposed Subcontractors. List sources, types and manufacturers of proposed materials)
TO BE SUBMITTED UPON REQUEST
Proposal Page 8 of 17
Quantity Unit
1.1
1 LS
1.2
14.5 AC
1.3
28200 SY
1.4
26500 SY
1.5
3800 SF
1.6
5 EA
1.7
720 LF
1.8
720 LF
1.9
460 LF
1.10
420 LF
CITY OF LAREDO
Total Price 1.0 BASE BID
ENGINEERING DEPARTMENT
BID SCHEDULE
FY25-ENG-52
Concord Hills Boulevard Extension
Furnish all labor, equipment, and material for application of Mobilization and Bonding as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of 8.5" REINFORCED CONCRETE
PAVEMENT (4000 PSI) W/ MONO. CURB as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of 8" SUBGRADE PREPARATION as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of CLEARING & GRUBBING as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of 30" STORM SEWER LINE (RCP) as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of 20" STEEL CASING W/ CAPS AND
SPACERS as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of CONCRETE SIDEWALK as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of CONCRETE ADA FLARED RAMP as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of 20" STEEL CASING W/ CAPS as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of 24" STORM SEWER LINE (RCP) as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Proposal Page 9 of 17
1.11
280 LF
1.12
60 LF
1.13
320 LF
1.14
12 EA
1.15
2 EA
1.16
2 EA
1.17
3 EA
1.18
2 EA
1.19
3 EA
1.20
6000 SF
1.21
34000 CY
Furnish all labor, equipment, and material for application of CONCRETE RIPRAP (3000 PSI, 6X6
W2.9XW2.9 WWM) as per city specifications, to include all labor, materials, tools, equipment, etc.
Complete in place
Furnish all labor, equipment, and material for application of EXCAVATION AND EMBANKMENT as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of 30" STORM SEWER LINE (RCP, CLASS IV) as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of 36" STORM SEWER LINE (RCP) as per city specifications, to include all labor, materials, tools, pavement, flex base, etc. Complete in place
Furnish all labor, equipment, and material for application of CONCRETE HEADWALL (TXDOT TY.
CH-PW-0) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of CONCRETE HEADWALL (TXDOT TY.
PW-1) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of 4' X 4' JUNCTION BOX (CONCRETE, PRE-CAST) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of SAFETY END TREATMENT FOR 5' X
4' BOX (TXDOT TY. SETB-CD) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of 20' CURB INLET as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of 20' CURB INLET (CAST-IN-PLACE) as per city specifications, to include all labor, materials, foundation, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of 5' X 4' BOX CULVERT (TRAFFAIC
RATED) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Proposal Page 10 of 17
1.22
4500 CY
1.23
1 LS
1.24
24 EA
1.25
3 EA
1.26
2 EA
1.27
42 EA
1.28
1 EA
1.29
1 EA
1.30
50 LF
1.31
6920 LF
1.32
150 LF
1.33
1980 LF
Furnish all labor, equipment, and material for application of PAV MARK - 24" WHITE STOP BAR
STRIPE as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - DOUBLE 6" YELLOW
SOLID STRIPE as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - 4" WHITE SOLID STRIPE as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - 4" WHITE BROKEN
STRIPE as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of SIGN - STOP W/ STREET NAME
SIGNS as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of SIGN - SPEED LIMIT (30 MPH) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of SIGN - CHEVRON (DOUBLE-SIDED) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of SIGN - RIGHT LANE ENDS as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of SIGN - LANE ENDS MERGE LEFT as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of NET CUT (<0.5 MILES) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of TRAFFIC CONTROL ) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of LIGHTPOLE - SINGLE MAST as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Proposal Page 11 of 17
1.34
4 EA
1.35
2 EA
1.36
400 EA
1.37
11800 LF
1.38
6 EA
1.39
5300 LF
1.40
13000 SF
1.41
16 EA
1.42
2 EA
1.43
1 EA
1.44
1 EA
Furnish all labor, equipment, and material for application of EROSION CONTROL BLANKETS as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of INLET PROTECTION as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of STABILIZED CONSTRUCTION
ENTRANCE as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of CONCRETE WASHOUT PIT as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of TRASH AND DEBRIS DISPOSAL as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - WHITE "ONLY" WORD as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - YELLOW
REFLECTORIZED RAISED as per city specifications, to include all labor, materials, tools, equipment, etc.
Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - EDGE LINE WORK
ZONE (TYPE II-A-A BUTTONS @ 20' O.C. AND
TYPE Y BUTTONS @5' O.C.) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of BARRICADE (TXDOT TY. III) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of SILT FENCE as per city specifications, to include all labor, materials, tools, equipment, etc.
Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - WHITE LEFT TURN
ARROW as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Proposal Page 12 of 17
1.45
14 EA
1.46
1 LS
1.47
2830 LF
1.48
14 EA
1.49
1 LS
Quantity Unit
2.1
6400 SY
2.2
4500 CY
2.3
-4500 CY
2.4
6300 LF
Furnish all labor, equipment, and material for application of PAV MARK - 4" WHITE BROKEN
STRIPE as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of EXCAVATION AND EMBANKMENT as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place
TOTAL
Furnish all labor, equipment, and material for application of ROCK BERM as per city specifications, to include all labor, materials, tools, equipment, etc.
Complete in place
Furnish all labor, equipment, and material for application of TRENCH SAFETY SYSTEM as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of CONDUIT CROSSINGS (3 - 4" ELEC., 2 - 4" COMM.) as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Furnish all labor, equipment, and material for application of POWERPOLE RELOCATIONS as per city specifications, to include all labor, materials, tools, equipment, etc. Complete in place
Partially remove NET CUT (<0.5 MILES) from base bid.
Contingency Allowance
$300,000.00
Furnish all labor, equipment, and material for application of REINFORCED CONCRETE
PAVEMENT (4000 PSI) W/ MONO. CURB as per city specifications, to include all labor materials, tools, equipment, etc. Complete in place
2.0 ALTERNATE #1 - NORTHBOUND LANE ADDITION Total Price
Proposal Page 13 of 17
2.5
-5900 LF
2.6
-3 EA
Quantity Unit
3.1
6150 SY
3.2
-1500 CY
3.3
1500 CY
3.4
100 LF
3.5
6150 LF
3.6
6300 LF
Furnish all labor, equipment, and material for application of NET CUT (<0.5 MILES) as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - 4" YELLOW SOLID
STRIPE as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - 4" YELLOW BROKEN
STRIPE (BIKE LANE, 2' LONG @ 8' O.C.) as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - 4" WHITE BROKEN
STRIPE as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Partially remove PAV MARK - EDGE LINE WORK
ZONE (TYPE II-A-A BUTTONS @ 20' O.C. AND
TYPE Y BUTTONS @5' O.C.) from base bid.
Partially remove BARRICADE (TXDOT TY. III) from base bid.
TOTAL
Partially remove EXCAVATION AND EMBANKMENT from base bid.
3.0 ALTERNATE #2 SHARED-USE PATH ADDITION
Furnish all labor, equipment, and material for application of CONCRETE SHARED USE PATH as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Total Price
Proposal Page 14 of 17
3.7
4 EA
3.8
-5900 LF
3.9
-3 EA
3.10
255 LF
Quantity Unit
4.1
380 SY
4.2
380 SY
4.3
380 SY
Furnish all labor, equipment, and material for application of 8.5" REINFORCED CONCRETE
PAVEMENT (4000 PSI) as per city specifications, to include all labor, materials, foundation, tools, equipment, etc. Complete in place
Partially remove PAV MARK - EDGE LINE WORK
ZONE (TYPE II-A-A BUTTONS @ 20' O.C. AND
TYPE Y BUTTONS @5' O.C.) from base bid. (-)
Furnish all labor, equipment, and material for application of BARRICADE (TXDOT TY. III) as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of PEDESTRIAN RAIL as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
Furnish all labor, equipment, and material for application of SAW-CUT AND REMOVE ASPHALT
PAVEMENT as per city specifications, to include all labor, materials, foundation, tools, equipment, etc.
Complete in place
Furnish all labor, equipment, and material for application of PAV MARK - WHITE "BIKE PATH"
SYMBOL as per city specifications, to include all labor, materials, tools, pavement, etc. Complete in place
TOTAL
4.0 ALTERNATE #3 - FULL CONCRETE INTERSECTION ADDITION
TOTAL
Total Price
Furnish all labor, equipment, and material for application of REMOVE BASE MATERIAL as per city specifications, to include all labor, materials, foundation, tools, equipment, etc. Complete in place
Proposal Page 15 of 17
Contractor
Signature Title
Total Alternate #1 Written In Words
Total Alternate #3 Written In Words
City/State
Total Base Bid Written in Words
Address ZIP
Date:
Telephone Number:
Total Alternate #2 Written In Words
Proposal Page 16 of 17
General notes:
3. The successful bidder/contractor shall coordinate at all times during construction with the City of
Laredo Engineering Department and Parks & Recreation Department.
2. The City of Laredo reserves the right to award the base bid or any of the alternate bids listed above or reject all bids if funding is not available.
1. All bid items will be paid for when complete, in place, tested and accepted by the City of
Laredo.
NOTE 2: THE CITY OF LAREDO RESERVES THE RIGHT TO AWARD THE BASE BID OR ANY OF THE
ALTNERATE BIDS LISTED ABOVE TO REJECT ALL BIDS IF FUNDINGS IS NOT AVAILABLE.
NOTE 1: ALL BID ITEMS WILL BE PAID FOR WHEN COMPLETE IN PLACE, TESTED, AND ACCEPTED BY
THE OWNER
Proposal Page 17 of 17
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned as Principal, and as Surety, are hereby held and firmly bound unto as Owner in the penal sum of day of , 20
The condition of the above obligation is such that whereas the Principal has submitted to a certain Bid, attached hereto and hereby made a part hereof to enter into a Contract in writing for the
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate, (b)
(L.S.)
Principal (Print and Sign)
Surety
By:
Surety Seal
BID BOND
for payment of which, well and truly to be made, we hereby jointly a severally bid ourselves, our heirs, executors, administrations, successors and assigns.
Signed, this
The Surety, for value received, hereby stipulates and agrees that he obligations of said Surety, and its bonds shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set fourth herein.
FY25-ENG-52
Concord Hills Boulevard Extension then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the Form of
Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a bond for his faithful performance of said Contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, Proposal Page 29 of 106
[ ] Have you acknowledged receipt of all addenda to the plans and specifications?
[ ] Is your bid properly signed? (Refer to Bid Documents)
[ ] Is your bid guarantee in the proper amount? (Usually 5% of total bid price)
[ ] If required have you entered a unit price for each bid item?
[ ] Are decimals in unit prices in the proper places? Are your figures legible?
[ ] Are the extensions of your unit prices, and your total bid price correct?
[ ] Is proposal being submitted complete together with Information from Bidders?
Page 1 of 2Checklist to Bidders
If required have you entered the unit price or lump sum price in both words and figures? (Unit Price or Lump Sum price in words govern)
Project:
FY25-ENG-52
Concord Hills Boulevard Extension
SECTION A-6
CHECKLIST FOR BIDDERS
All information required by the terms of the Bid Documents must be furnished. MISTAKES OR OMISSIONS
CAN BE COSTLY AND CAN RESULT IN THE REJECTION OF YOUR BID. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper bid. Check as you read. DO NOT INCLUDE THIS CHECKLIST WITH YOUR BID.
If a bid guarantee is required, is it included in your bid? (A late bid guarantee is treated the same as a late bid)
Your bid guarantee must be in the form of a Bidder’s Bond, a Certified Check or Cashier’s Check.
If your bid guarantee is in the form of a Bidder’s Bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?
Is the surety company qualified and licensed by the State of Texas as required by the provisions of the bid documents?
Is the name in which you submitted the bid the same on your bid proposal as on the Bidder’s Bond?
Checklist to Bidders Page 2 of 2
On Federally Funded Projects, all structural and reinforcement steel shall follow the Build
America, Buy America Act (BABAA).
On Federally Funded Projects, contractor must submit certified weekly payrolls with a copy to
City Engineering Files.
Are all erasures or corrections initialized by the person signing the bid or by an authorized representative of the person signing the bid.
Do not restrict your bid by altering any provisions of the Bid Document or by attaching any documents to the Proposal that takes exception to the Bid Documents.
Have you included all pages of the Proposal with your bid? Are all blanks in the Proposal properly completed (equipment brands, alternate materials, etc.)?
Is the envelope containing your bid properly identified that it is a sealed bid and does it contain the correct project name and bid opening date?
Will your bid arrive on time? Late bids will not be considered. Generally, bids must be received by the City Secretary, City Hall on the date and time specified in the Notice to Bidders. (Other times or dates will be clearly specified in the Notice).
STATE OF TEXAS
COUNTY OF WEBB
CITY OF LAREDO
Owner and, Project:
130 Working days
The Contractor further agrees to pay the sum of for each consecutive day there-in-after as herein provided in Division B, Section 1.
Construction Contract Page 1 of 2
Concord Hills Boulevard Extension
WHEREAS, the Contractor has been engaged in and now does such work and represents that he is fully equipped, competent and capable to perform the above desired and outlined work, and is ready and willing to perform the work in accordance with the provisions of the Invitation for Bids, the Specifications and Plans, titled:
FY25-ENG-52 Concord Hills Boulevard Extension
And the Owner in consideration of the full and true performance of the said work by said Contractor hereby agrees to and binds itself to pay the said Contractor the unit price set forth in the attached Bid, and in the manner provided in the Specifications.
thereof totaling the sum of, based on the Engineer's estimate of quantities, payable in the manner set out in Division
CONSTRUCTION CONTRACT
THIS AGREEMENT, made this ____ day of ________________ 20___, by and between the City of Laredo, Texas, acting by and through its duly authorized City Manager hereinafter termed the
SECTION A-7
WHEREAS, the Owner desired to enter into Contract for the FY25-ENG-52 in accordance with the provisions of the Invitation for Bids, the Specifications and Plans titled as above, and published by City of Laredo, Texas, 1110 Houston Street, (mailing address: P.O. Box 579), Laredo, Texas
78040 all of which are a part thereof; and, Said Contractor further agrees to begin the work on or before the tenth day following the date set by the
Owner in the written notice to proceed and to complete the work within
C, Section 9, General Provisions of the contractual Documents to commence and complete the
FY25-ENG-52
his/their executors, their successors, or assigns, hereinafter termed the Contractor.
Concord Hills Boulevard Extension in the City of Laredo, TX, in accordance with Instructions to Bidders, Special Provisions, General Provisions, Technical Provisions, and all other requirements of the contractual Documents, and in accordance with the
Specifications and Plans (including all maps, plats, blueprints, and other drawings and printed or written explanatory matter thereof) prepared by the Owner's Engineer, a part thereof and collectively, together with this
Agreement constitute the entire Contract; and the Contractor agrees to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, bonds, insurance and other accessories and services, and whatever else may be necessary to complete the said construction in accordance with said specifications, plans, and other contractual documents including such proposal.
FY25-ENG-52 Concord Hills Boulevard Extension
WITNESS:
THAT for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, the Contractor hereby agrees at the unit price set forth in his Bid, made a part
WITNESS Contractor/Firm (Signature)
Signature Signature
Print Name Print Name
Title
Address
Address
City/State/Zip Code
Telephone Number
E-mail address
ATTEST: CITY OF LAREDO, TEXAS
Mario I. Maldonado, Jr., Joseph Neeb
City Secretary City Manager
APPROVED AS TO FORM:
Project Number:
Account:
City Attorney
Construction Contract Page 2 of 2
IN WITNESS WHEREOF, the OWNER AND THE CONTRACTOR have hereunto set their hand this day of_______ day of __________________, 20___.
Doanh “Zone” T. Nguyen 0
THE STATE OF {}
COUNTY OF {}
a (2) of hereafter called Principal and (3) of
, hereinafter called the Surety, are held and firmly bound unto (4) of hereinafter called Owner, in the penal sum of
Dollars in lawful money of the United Stated, to be paid in (5)
WEBB COUNTY, TEXAS
for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain
Contract with (6) the Owner, dated the day of a copy of which is hereto attached and made a part hereof for the Construction of:
(hereinafter called the “Work”)
These notes refer to the numbers in body of Contract above:
Date of Bond must not be prior to Date of Contract.
(1) Correct name of Contractor.
(2) A Corporation, or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .