CombinedSpecsALL (1).pdf
PDF 2 MB Posted
- Attached to
- Mechanical Upgrade Equipment
- Solicitation number
- 248-TL
- Issued by
- Travis County, Austin City, Texas
About this file
Summary: Travis County Correctional Complex Mechanical Upgrade Services Specification
This is a comprehensive project specification document for mechanical retro-commissioning and upgrade services at the Travis County Correctional Complex located at 3614 Bill Price Rd, Del Valle, Texas. The project, identified as Agreement #4400006840, encompasses the implementation phase of mechanical upgrades for Buildings 50, 104, 130, 320, and 330, with work directed by Brad Kalmans at 10930 W. Sam Houston Parkway North, Suite 900, Houston, Texas 77064. The specification encompasses Divisions 23 (Mechanical) and 26 (Electrical) work, including HVAC operating and maintenance manuals, contract quality control, mechanical alterations, shop drawings coordination, electrical provisions, access doors, vibration isolation, and comprehensive testing, balancing, and adjusting (TAB) of environmental systems. The contractor must demonstrate qualifications by providing evidence of having installed at least three comparable systems that have operated satisfactorily for a minimum of three years. The specification requires extensive documentation including as-built drawings, operating and maintenance manuals in both hard copy and electronic formats, and detailed coordination drawings showing mechanical equipment room layouts with service clearances.
The project requires a minimum of 40 hours of dedicated instructor time for owner personnel training during regular working hours, with training content based on comprehensive operating and maintenance manuals that must include product data, control diagrams, warranty information, spare parts lists, and start-up reports. All work must comply with applicable codes from Underwriters Laboratories, the National Fire Protection Association, State Health Department, Local Municipal Building Inspection, and the Texas Department of Licensing & Regulations. The TAB firm must be certified by the Associated Air Balance Council with a minimum of one test and balance engineer holding professional engineering licensure in Texas and at least five years of experience. The specification mandates a two-year extended warranty period during which the TAB firm must make available technicians and instruments for any requested retesting or resetting of outlets. Equipment protection requirements are stringent, prohibiting delivery until construction has progressed sufficiently or the building is weather-tight, with equipment standing in weather subject to rejection and replacement at contractor expense.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Travis County Correctional Complex
3614 Bill Price Rd
Del Valle, TX 78617
PROJECT SPECIFICATION
TCCC RETRO-COMMISSIONING SERVICES AGREEMENT # 4400006840
IMPLEMENTATION PHASE – MECHANICAL UPGRADE
FOR BUILDINGS 50, 104, 130, 320 AND 330.
Brad Kalmans 10930 W. Sam Houston Parkway North, Suite 900
Houston, Tx 77064 May 13, 2025
05/13/2025
TABLE OF CONTENTS
DIVISION 23 - MECHANICAL
SECTION
23 01 00 HVAC OPERATING AND MAINTENANCE MANUALS
23 05 00 MECHANICAL GENERAL PROVISIONS
23 05 10 HVAC CONTRACT QUALITY CONTROL
23 05 11 MECHANICAL ALTERATIONS PROJECT PROCEDURES
23 05 12 SHOP DRAWINGS, COORDINATION DRAWINGS AND PRODUCT DATA
23 05 13 ELECTRICAL PROVISIONS OF HVAC WORK
23 05 17 HVAC ACCESS DOORS
23 05 48 VIBRATION ISOLATION
23 05 93 TESTING, BALANCING AND ADJUSTING (TAB) OF ENVIRONMENTAL SYSTEMS
23 05 94 COORDINATION OF TESTING AND BALANCING
23 07 13 EXTERNAL DUCT INSULATION
23 31 13 DUCTWORK
23 34 16 FANS
23 37 13 AIR DEVICES
DIVISION 26 - ELECTRICAL
SECTION
26 01 05 ELECTRICAL OPERATING AND MAINTENANCE MANUALS
26 05 00 ELECTRICAL GENERAL PROVISIONS
26 05 05 ELECTRICAL ALTERATIONS PROJECT PROCEDURES
26 05 10 CONTRACT QUALITY CONTROL
26 05 12 ELECTRICAL SHOP DWGS, COORDINATION DWGS, & PRODUCT DATA
26 05 16 EXCAVATING, BACKFILLING AND COMPACTING FOR ELECTRICAL
26 05 19 CONDUCTORS AND CONNECTORS - 600 VOLT
26 05 27 EXPANSION OF EXISTING ELECTRICAL GROUNDING SYSTEM
26 05 33 CONDUIT SYSTEMS
26 05 35 ELECTRICAL CONNECTIONS FOR EQUIPMENT
26 05 37 ELECTRICAL BOXES AND FITTINGS
26 05 40 ELECTRICAL GUTTERS AND WIREWAYS
26 05 50 FIRESTOPS
26 09 25 ELECTRICAL CONTACTORS
26 27 73 LINE VOLTAGE WIRING DEVICES
HVAC OPERATING AND MAINTENANCE MANUALS 23 01 00-1
SOBE #2450-70502 Salas O'Brien Registration #F-4111
SECTION 23 01 00
HVAC OPERATING AND MAINTENANCE MANUALS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Compilation product data and related information appropriate for Owner's operation and maintenance of products furnished under Contract. Prepare operating and maintenance data as specified.
B. Instruct Owner's personnel in operation and maintenance of equipment and systems.
C. Submit three copies of complete manual in final form.
1.2 SUBMITTALS
A. Thirty (30) days after the Contractor has received the final scheduled identified submittals bearing the Architect/Engineer's stamp of acceptance (including resubmittals), submit for review one copy of the first draft of the Operating and Maintenance Manual. This copy shall contain as a minimum:
1. Table of Contents for each element.
2. Contractor information.
3. All submittals, coordination drawings and product data, reviewed by the
Architect/Engineer; bearing the Architect/Engineer's stamp of acceptance. (When submittals are returned from Engineer "Correct as Noted", corrected inserts shall be included.)
4. All parts and maintenance manuals for items of equipment.
5. Warranties (without starting dates)
6. Certifications that have been completed. Submit forms and outlines of certifications that have not been completed.
7. Operating and maintenance procedures.
8. Form of Owner's Training Program Syllabus (including times and dates).
9. Control operations/equipment wiring diagrams.
10. Schedule of filters for each item of equipment.
11. Schedule of belts for each item of equipment.
12. Other required operating and maintenance information that are complete.
B. Copy will be returned to the Contractor within 15 days with comments for corrections.
C. Submit completed manuals in final electronic form to the Architect/Engineer one day after substantial completion, and prior to Owner's instructions. Include all specified data, test and balance reports, drawings, dated warranties, certificates, reports, along with other materials and information.
D. The Architect/Engineer will review the manuals for completeness within fifteen (15) days.
E. The Contractor shall be notified of any missing or omitted materials. The Manuals shall be reworked by the Contractor, as required, in the office of the Architect / Engineer. The manuals will not be retransmitted.
F. Electronic copies of complete Manuals will be delivered to the Owner.
PART 2 - PRODUCTS
2.1 BINDERS
HVAC OPERATING AND MAINTENANCE MANUALS 23 01 00-2
A. Commercial quality black three-ring binders with clear overlay plastic covers.
B. Minimum ring size: 1".
Maximum ring size: 3".
C. When multiple binders are used, correlate the data into related groupings.
D. Label contents on spine and face of binder with full size insert. Label under plastic cover.
PART 3 - EXECUTION
3.1 OPERATION AND MAINTENANCE MANUAL
A. Form for Manuals:
1. Prepare data in form of an instructional manual for use by Owner's personnel.
2. Format:
a. Size: 8-1/2" x 11".
b. Text: Manufacturer's printed data or neatly typewritten.
3. Drawings:
a. Provide reinforced punched binder tab and bind in text.
b. Fold larger drawings to size of text pages.
4. Provide flyleaf indexed tabs for each separate product or each piece of operating equipment.
5. Cover: Identify each volume with typed or printed title "Operating and Maintenance Instructions". List:
a. Title of Project
b. Identity of separate structures as applicable.
c. Identity of general subject matter covered in the manual.
6. Binder as specified.
B. Content of Manual:
1. Neatly typewritten Table of Contents for each volume arranged in systematic order as outlined in the specifications.
a. Contractor, name of responsible principal, address and telephone number.
b. A list of each product required to be included, indexed to content of the volume.
c. List with each product, name, address and telephone number of:
1) Subcontractor or installer.
2) Maintenance contractor as appropriate.
3) Identify area of responsibility of each.
4) Local source of supply for parts and replacement.
d. Identify each product by product name and other identifying symbols as set forth in Contract Documents.
2. Product Data:
a. Include those sheets pertinent to the specific product.
b. Annotate each sheet to:
1) Identify specific product or part installed.
2) Identify data applicable to installation.
3) Delete references to inapplicable information. (All options not supplied with equipment shall be marked out indicated in some manner.
3. Drawings:
a. Supplement product data with drawings as necessary to illustrate:
1) Relations of component parts of equipment and systems.
2) Control and flow diagrams.
b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation.
HVAC OPERATING AND MAINTENANCE MANUALS 23 01 00-3
c. Do not use Project Record Documents as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for different procedures.
b. Provide logical sequence of instructions for each procedure.
5. Copy of each warranty, bond and service contract issued.
a. Provide information sheet for Owner's personnel, giving:
1) Proper procedures in event of failure.
2) Instances that might affect validity of warranties or bonds.
6. Shop drawings, coordination drawings and product data as specified.
C. Sections for Equipment and Systems.
1. Content for each unit of equipment and system as appropriate:
a. Description of unit and component parts.
1) Function, normal operating characteristics, and limiting conditions.
2) Performance curves, engineering data and tests.
3) Complete nomenclature and commercial number of replaceable parts.
b. Operating procedures:
1) Start up, break-in, routine and normal operating instructions.
2) Regulation, control, stopping, shut down and emergency instructions.
3) Summer and winter operating instructions.
4) Special operating instructions.
c. Maintenance procedures:
1) Routine operations
2) Guide to trouble-shooting.
3) Disassembly, repair and reassembly.
4) Alignment, adjusting and checking.
5) Routine service based on operating hours.
d. Servicing and lubrication schedule. List of lubricants required.
e. Manufacturer's printed operating and maintenance instructions.
f. Description of sequence of operation by control manufacturer.
g. Original manufacturer's parts list, illustrations, assembly drawings and diagrams required for maintenance.
1) Predicted life of part subject to wear.
2) Items recommended to be stocked as spare parts.
h. As installed control diagrams by controls manufacturer.
i. Complete equipment internal wiring diagrams.
j. Schedule of filters for each air handling system.
k. Schedule of belts for each item of equipment.
l. Each Contractor's coordination drawings.
m. As installed color coded piping diagrams.
n. Charts of valve tag number, with location and function of each valve.
o. List of original manufacturer's spare parts and recommended quantities to be maintained in storage.
p. Other data as required under pertinent sections of the specifications.
2. Prepare and include additional data when the need for such data becomes apparent during instruction of Owner's personnel.
3. Additional requirements for operating and maintenance data as outlined in respective sections of specifications.
4. Provide complete information for products specified in Division 23.
5. Provide certificates of compliance as specified in each related section.
6. Provide start up reports as specified in each related section.
7. Provide signed receipts for spare parts and material.
8. Provide training report and certificates.
9. Provide extended compressor warranty certificates.
HVAC OPERATING AND MAINTENANCE MANUALS 23 01 00-4
END OF SECTION
MECHANICAL GENERAL PROVISIONS 23 05 00-1
SECTION 23 05 00
MECHANICAL GENERAL PROVISIONS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Except as modified in this Section, General Conditions, Supplementary Conditions, applicable provisions of the General Requirements, and other provisions and requirements of the contract documents apply to work of Division 23 Mechanical.
B. Applicable provisions of this section apply to all sections of Division 23, Mechanical.
1.2 CODE REQUIREMENTS AND FEES
A. Perform work in accordance with applicable statutes, ordinances, codes and regulations of governmental authorities having jurisdiction.
B. Mechanical work shall comply with applicable inspection services:
1. Underwriters Laboratories
2. National Fire Protection Association
3. State Health Department
4. Local Municipal Building Inspection Department
5. Texas Department of Licensing & Regulations (ADA)
C. Resolve any code violations discovered in contract documents with the Engineer prior to award of the contract. After Contract award, any correction or additions necessary for compliance with applicable codes shall be made at no additional cost to the Owner.
D. This Contractor shall be responsible for being aware of and complying with asbestos NESHAP regulations, as well as all other applicable codes, laws and regulations.
E. Obtain all permits required.
1.3 CONTRACTOR'S QUALIFICATIONS
A. An approved contractor for the work under this division shall be:
1. A specialist in this field and have the personnel, experience, training, skill, and organization to provide a practical working system
2. Able to furnish evidence of having contracted for and installed not less than 3 systems of comparable size and type that has served their Owners satisfactorily for not less than 3 years
1.4 REFERENCE SPECIFICATIONS AND STANDARDS
A. Materials which are specified by reference to Federal Specifications; ASTM, ASME, ANSI, or AWWA Specifications; Federal Standards; or other standard specifications must comply with latest editions, revisions, amendments or supplements in effect on date bids are received. Requirements in reference specifications and standards are minimum for all equipment, material, and work. In instances where specified capacities, size, or other features of equipment, devices, or materials exceed these minimums, meet specified capacities.
1.5 CONTRACT DRAWINGS
MECHANICAL GENERAL PROVISIONS 23 05 00-2
A. Contract drawings are diagrammatic only and do not give fully dimensioned locations of various elements of work. Determine exact locations from field measurements.
1.6 PROJECT RECORD DOCUMENTS
A. Maintain at the job site a separate set of white prints (black line) of the contract drawings for the sole purpose of recording the "as-built" changes and diagrams of those portions of work in which actual construction is at variance with the contract drawings. Mark the drawings with a colored pencil. Prepare, as the work progresses and upon completion of work, reproducible drawings clearly indicating locations of various lines, valves, ductwork, traps, equipment, and other pertinent items, as installed. Include flow-line elevation of sewer lines. Record existing and new underground and under slab piping with dimensioned locations and elevations of such piping.
B. At the conclusion of project, obtain without cost to the Owner, erasable mylars of the original drawings and transfer as-built changes to these. Prior to transmittal of corrected drawings, obtain 3 sets of blue-line prints of each drawing, regardless of whether corrections were necessary and include in the transmittal (2 sets are for the Owner's use and one set is for the Architect/Engineer's records). Delivery of these as-built prints and reproducibles is a condition of final acceptance. Provide record drawings on one set each (reproducible Dayrex mylar film positives) and AutoCad 2014 / Revit CAD files on disk (CD Rom).
C. As-Built drawings should indicate the following information as a minimum:
1. Indicate all addendum changes to documents.
2. Remove Engineer’s seal, name, address and logo from drawings.
3. Mark documents RECORD DRAWINGS.
4. Clearly indicate: DOCUMENT PRODUCED BY
5. Indicate all changes to construction during construction. Indicate actual routing of all piping, ductwork, etc. that were deviated from construction drawings.
6. Indicate exact location of all underground mechanical piping and elevation.
7. Indicate exact location of all underground electrical raceways and elevations.
8. Correct schedules to reflect (actual) equipment furnished and manufacturer.
9. Location and size of all ductwork and mechanical piping above ceiling including exact location of isolation of domestic and mechanical valves.
10. Exact location of all electrical equipment in and outside of the building.
11. Exact location of all roof mounted equipment, wall, roof and floor penetrations.
12. Cloud all changes.
1.7 SPACE REQUIREMENTS
A. Consider space limitations imposed by contiguous work in selection and location of equipment and material. Do not provide equipment or material that is not suitable in this respect.
1.8 RELATION WITH OTHER TRADES
A. Carefully study all matters and conditions concerning the project. Submit notification of conflict in ample time to prevent unwarranted changes in any work. Review other Divisions of these specifications to determine their requirements.
B. Because of the complicated relationship of this work to the total project, conscientiously study the relation and cooperate as necessary to accomplish the full intent of the documents.
C. Provide sleeves and inserts in forms as required for the work. Stub up and protect open
MECHANICAL GENERAL PROVISIONS 23 05 00-3
ends of pipe before any concrete is placed. Furnish sizes of required equipment pads.
Furnish and locate bolts and fittings required to be cast in them.
D. Locate and size openings required for installation of work specified in this Division in sufficient time to prevent delay in the work.
E. Refer to other Divisions of the specifications for the scope of required connections to equipment furnished under that Division. Determine from the Contractor for the various trades, the Owner, and by direction from the Architect/Engineer, the exact location of all items.
1.9 CONCEALED AND EXPOSED WORK
A. When the word "concealed" is used in connection with insulating, painting, piping, ducts and the like, the work is understood to mean hidden from sight as in chases, furred spaces or above ceilings. "Exposed" is understood to mean open to view.
1.10 GUARANTEE
A. Guarantee work for 1 year from the date of substantial completion of the project. During that period make good any faults or imperfections that may arise due to defects or omissions in material, equipment or workmanship. At the Owner's option, replacement of failed parts or equipment shall be provided.
1.11 MATERIAL AND EQUIPMENT
A. Furnish new and unused materials and equipment meeting the requirements of the paragraph specifying acceptable manufacturers. Where two or more units of the same type or class of equipment are required, provide units of a single manufacturer.
1.12 NOISE AND VIBRATION
A. Select equipment to operate with minimum noise and vibration. If objectionable noise or vibration is produced or transmitted to or through the building structure by equipment, piping, ducts or other parts of work, rectify such conditions at no additional cost. If the item of equipment is judged to produce objectionable noise or vibration, demonstrate at no additional cost that equipment performs within designated limits on a vibration chart.
1.13 ACCEPTABLE MANUFACTURERS
A. Manufacturers names and catalog number specified under sections of Division 23 are used to establish standards of design, performance, quality and serviceability and not to limit competition. Equipment of similar design, equal to that specified, manufactured by a named manufacturer will be acceptable on approval. A request for prior approval of equipment not listed must be submitted ten (10) days before bid due date. Submit complete design and performance data to the Engineer.
1.14 OPERATING TESTS
A. After all mechanical systems have been completed and put into operation, subject each system to an operating test under design conditions to ensure proper sequencing and operation throughout the range of operation. Tests shall be made in the presence of the Architect/Engineer. Make adjustments as required to ensure proper functioning of all systems. Special tests on individual systems are specified under individual sections.
Submit 3 copies of all certifications and test reports adequately in advance of completion of the work to allow for remedial action as required to correct deficiencies discovered in
MECHANICAL GENERAL PROVISIONS 23 05 00-4
equipment and systems.
1.15 WARRANTIES
A. Submit 3 copies of all warranties and guarantees for systems, equipment, devices and materials. These shall be included in the Operating and Maintenance Manuals.
1.16 BUILDING CONSTRUCTION
A. It shall be the responsibility of each sub-contractor to consult the Architectural and Engineering drawings, details, and specifications and thoroughly familiarize himself with the project and all job related requirements. Each sub-contractor shall cooperate with the General Contractor to verify that all piping and other items are placed in the walls, furred spaces, chases, etc., so there will be no delays in the job.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION
3.1 OPENINGS
A. Framed, cast or masonry openings for ductwork, equipment or piping are specified under other divisions. Drawings and layout work for exact size and location of all openings are included under this division.
3.2 AIR FILTERS AND PIPE STRAINERS
A. Immediately prior to substantial completion of the project, inspect, clean and service air filters and strainers. Replace air filters.
3.3 LUBRICATION, REFRIGERANT AND OIL
A. Provide a complete charge of correct lubricant for each item of equipment requiring lubrication.
B. Provide a complete and working charge of proper refrigerant, free of contaminants, into each refrigerant system. After each system has been in operation long enough to ensure completely balanced conditions, check the charge and modify for proper operation as required.
C. Provide a complete charge of special oil for refrigeration use, suitable for operation with refrigerant, in each system.
3.4 HOUSEKEEPING PADS
A. Provide equipment housekeeping pads under all floor mounted and ground mounted HVAC equipment, and as shown on the drawings.
B. Concrete work as specified in Division 3.
C. Concrete pads:
1. 4" high, rounded edges, minimum 2500 psi unless otherwise indicated on the drawings
2. Chamfer strips at edges and corner of forms.
3. Smooth steel trowel finish.
MECHANICAL GENERAL PROVISIONS 23 05 00-5
4. Doweled to existing slab
D. Install concrete curbs around duct penetrations or multiple pipe penetrations.
3.5 INSTRUCTION OF OWNER'S PERSONNEL
A. Prior to final inspection, conduct an on-site training program to instruct the Owner's operating personnel in the operation and maintenance of the mechanical systems.
1. Provide the training during the Owner's regular working day.
2. The Instructors shall each be experienced in their phase of operation and maintenance of building mechanical systems and with the project.
B. Time to be allocated for instructions.
1. Minimum of 40 hours dedicated instructor time.
2. 8 hours on each of 5 days.
C. Before proceeding with the on-site training program, submit the program syllabus;
proposed time and dates; and other pertinent information for review and approval.
1. One copy to the Owner.
2. One copy to the Architect/Engineer.
D. The Owner will provide a list of personnel to receive instructions, and will coordinate their attendance at the agreed upon times.
E. Use the operation and maintenance manuals as the basis of instruction. Review contents of manual with personnel in detail to explain all aspects of operation and maintenance.
F. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shut down of each item of equipment.
G. Demonstrate equipment functions (both individually and as part of the total integrated system).
H. Prepare and insert additional data in the operating and maintenance manuals when the need for additional data becomes apparent during instructions.
I. Submit a report within one week after completion of the training program that instructions have been satisfactorily completed. Give time and date of each demonstration and hours devoted to the demonstration, with a list of people present.
J. At the conclusion of the on-site training program, have the person designated by the Owner sign a certificate to certify that he/she has a proper understanding of the system, that the demonstrations and instructions have been satisfactorily completed, and the scope and content of the operating and maintenance manuals used for the training program are satisfactory.
K. Provide a copy of the report and the certificate in an appropriately tabbed section of each Operating and Maintenance Manual.
3.6 EQUIPMENT IDENTIFICATION
A. Provide a laminated engraved plastic nameplate on each piece of equipment and starter.
1. Designation approved by Architect/Engineer.
2. Equipment includes, but is not limited to, air handling units, fan coil units, variable volume boxes, fans, pumps, boilers and chillers.
MECHANICAL GENERAL PROVISIONS 23 05 00-6
3. Submit schedule of equipment to be included and designations.
B. Provide nameplates with 1/2" high letters and fastened with epoxy or screws.
3.7 OBSTRUCTIONS
A. The drawings indicate certain information pertaining to surface and subsurface obstructions which has been taken from available drawings. Such information is not guaranteed, however, as to accuracy of location or complete information.
1. Before any cutting or trenching operations are begun, verify with Owner's representative, utility companies, municipalities, and other interested parties that all available information has been provided.
2. Should obstruction be encountered, whether shown or not, alter routing of new work, reroute existing lines, remove obstruction where permitted, or otherwise perform whatever work is necessary to satisfy the purpose of the new work and leave existing services and structures in a satisfactory and serviceable condition.
B. Assume total responsibility for and repair any damage to existing utilities or construction, whether or not such existing facilities are shown.
3.8 PROTECTION
A. Protect work, equipment, fixtures, and materials. At work completion, work must be clean and in original manufacturer's condition.
3.9 INDOOR AIR QUALITY
A. All equipment and ductwork shall be installed to allow sufficient space for testing, maintenance, and commissioning functions. Access doors or panels shall be installed in ventilation equipment, ductwork, and plenum enclosures for inspection and cleaning of outdoor air intakes, mixing plenums, up and downstream of coils, filters, drain pans and fans.
B. Practice source control and eliminate potential contaminants in material selection, installation, and maintenance.
C. Provide installation and disposal instructions for all materials and chemicals that are potential contaminants.
D. Obtain and conform to the requirements of the Material Safety Data Sheets (MSDSs) in the use of materials.
E. Utilize manufacturer’s recommendations and provide installation instructions for all chemicals, compounds, and potential contaminants including pre-installation degassing if required.
F. Ventilate completed building prior to final completion using no less than design outside air for at least 48 hours before occupancy.
G. Make provisions for controls to prevent the entry of air contaminants into the HVAC air distribution system.
H. Steps shall be taken to ensure that the HVAC system continues to function effectively and are not damaged or contaminated during construction activities.
HVAC CONTRACT QUALITY CONTROL 23 05 10-1
SECTION 23 05 10
HVAC CONTRACT QUALITY CONTROL
PART 1 - GENERAL
1.1 WORK INCLUDED
A. Contract quality control including workmanship, manufacturer's instructions, mock-ups and demonstrations.
1.2 QUALITY CONTROL PROGRAM
A. Maintain quality control over supervision, subcontractors, suppliers, manufacturers, products, services, site conditions and workmanship to produce work in accordance with contract documents.
1.3 WORKMANSHIP
A. Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.
B. Perform work by persons qualified to produce workmanship of specified quality.
C. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking. Under no conditions shall material or equipment be suspended from structural bridging.
D. Provide finishes to match approved samples. All exposed finishes shall be approved by the Architect. Submit color samples as required.
1.4 MANUFACTURER'S INSTRUCTIONS
A. Comply with instructions in full detail, including each step in sequence.
B. Should instruction conflict with Contract Documents, request clarification from Architect / Engineer before proceeding.
1.5 MANUFACTURER'S CERTIFICATES
A. When required in individual Specification Sections, submit manufacturer's certificate in duplicate, certifying that products meet or exceed specified requirements.
1.6 MANUFACTURER'S FIELD SERVICES
A. When required in individual Specification Sections, manufacturer shall provide qualified personnel to observe:
1. Field conditions.
2. Condition of installation.
3. Quality of workmanship.
4. Start-up of equipment.
5. Testing, adjusting, and balancing of equipment.
B. Representative shall make written report of observations and recommendations to Architect / Engineer.
1.7 MOCK-UPS
HVAC CONTRACT QUALITY CONTROL 23 05 10-2
A. Assemble and erect the specified equipment and products complete, with specified anchorage and support devices, seals and finishes.
B. Do not proceed with any work involving a mock-up, until the related mock-up has been approved in writing.
C. Acceptable mock-ups in place shall be retained in the completed work.
D. Perform tests and submit results as specified.
1.8 SCHEDULING OF MOCK-UPS
A. Schedule demonstration and observation of mock-ups, in phases, with Architect / Engineer.
1. Rough-in.
2. Finish with all appurtenances in place.
3. Insulation installed.
4. Demonstrations.
PART 2 - PRODUCTS
2.1 REFERENCE APPLICABLE SPECIFICATION SECTIONS.
PART 3 - EXECUTION
3.1 FAN/COIL UNITS (WATER SOURCE HEAT PUMPS)
A. Mock-up a fan/coil unit (water source heat pump) completely installed, including:
1. Primary, secondary and auxiliary drain pans.
2. Piping connections; including all piping appurtenances.
3. Pipe insulation.
4. Condensate drain piping.
5. Electrical connections.
6. Duct connection beyond first transition.
7. Block valves, balancing valves, and control valves.
8. Cabinet/internal vibration isolation.
9. Suspension system.
B. Tests: Air flow at scheduled static pressure.
C. Demonstrate:
1. Filter accessibility.
2. Accessibility to drain and components for service.
3. Controls sequence.
3.2 AIR HANDLING UNIT
A. Mock-up an air handling unit, completely installed, including:
1. Piping connections; including thermowells, test stations, test wells and other piping appurtenances.
2. Pipe insulation.
3. Condensate drain piping.
4. Electrical connections.
5. Ductwork beyond the first transition.
6. Control valves and bypass.
7. Cabinet/internal vibration isolation.
HVAC CONTRACT QUALITY CONTROL 23 05 10-3
8. Block valves and balancing valves.
9. Duct insulation.
10. Instrumentation.
B. Tests: Air flow at scheduled static pressure.
C. Demonstrate:
1. Filter accessibility.
2. Accessibility to drain and components for service.
3. Controls sequence.
3.3 CONSTANT VOLUME TERMINAL BOX
A. Mock-up a Constant Volume Terminal Box completely installed, including:
1. Piping connections, including all piping appurtenances.
2. Pipe insulation.
3. Electrical connections.
4. Duct connection beyond first transition.
5. Block valves, balancing valves, and control valves.
6. Cabinet/internal vibration isolation.
7. Suspension system.
B. Tests: Air flow at scheduled static pressure.
C. Demonstrate:
1. Control Sequence.
2. Accessibility to components for service.
3.4 HOT AND CHILLED WATER CIRCULATING PUMPS
A. Mock-up one each system pump, completely installed including:
1. Pump mounted on housekeeping pad.
2. Auxiliary drain pan. (Chilled water only)
3. Piping to a point beyond the complete valve and instrumentation assemblies.
4. Strainers with blowdown.
5. Flexible piping connection.
6. Pipe supports.
7. Pipe insulation.
8. Pump painting.
9. Electrical connections.
3.5 PROTECTION OF EQUIPMENT
A. Do not deliver equipment to the project site until progress of construction has reached the stage where equipment is actually needed or until building is closed in enough to protect the equipment from weather. Equipment allowed to stand in the weather will be rejected, and the Contractor is obligated to furnish new equipment of a like kind at no additional cost to the Owner.
B. Adequately protect equipment from damage after delivery to the project. Cover with heavy tarpaulins, drop cloths or other protective coverings as required to protect from plaster, paint, mortar and/or dirt. Do not cover with plastic materials and trap condensate and cause corrosion.
MECHANICAL ALTERATIONS PROJECT PROCEDURES 23 05 11-1
SECTION 23 05 11
MECHANICAL ALTERATIONS PROJECT PROCEDURES
PART 1 - GENERAL
1.1 WORK INCLUDED
A. Inspect and service existing equipment and materials that are to remain or to be reused.
B. Disposal of equipment, materials, or housekeeping pads to be abandoned. Prior to disposal, the Contractor shall verify with the Owner what is to be salvaged by the Owner and what is to become the property of the Contractor.
C. Handling of equipment and materials to be removed.
1.2 QUALITY ASSURANCE
A. Coordination with the Owner prior to the disconnection or shutdown of existing equipment, or to the modification of existing operational systems.
1.3 CONTRACT DRAWINGS
A. There is the possibility that existing conditions and devices are affected by the work indicated on the drawings and called for in the specifications (project manual) which do not appear on the drawings. It is the Contractor’s responsibility to visit the site and determine all of the existing conditions and to consider these existing conditions when making and presenting a proposal, to have a complete proposal.
PART 2 - PRODUCTS
2.1 MATERIALS AND EQUIPMENT
A. Material used to upgrade and repair existing equipment shall conform to that specified.
B. Material used to upgrade and repair existing equipment shall not void existing warranties or listings of the equipment to be upgraded or repaired.
C. Material used to upgrade and repair existing equipment shall be new and shall be of the same manufacturer of the existing equipment, shall be acquired through the existing original equipment manufacturer’s approved distribution channels, shall have manufacturer’s warranties for the new material being used, and shall be listed for the use intended.
PART 3 - EXECUTION
3.1 INSPECTION
A. Existing materials and equipment indicated on the drawings or in the specifications to be reused shall be inspected for damaged or missing parts. Contractor shall notify the Architect/Engineer, in writing, accordingly.
B. If using materials specified or shown on the drawing voids or diminishes the warranty or operation of remaining equipment or systems, the Contractor shall notify the Architect/Engineer, in writing.
C. Verify field measurements, above and underground piping connections and flows.
MECHANICAL ALTERATIONS PROJECT PROCEDURES 23 05 11-2
D. Demolition Drawings are based on casual field observation, and when available, existing record documents. Report discrepancies to Architect before disturbing existing installation, and immediately after such discrepancies are discovered.
E. Field verify existing conditions and actual utility uses prior to final connections. Existing drawings may not have been available for all required information. Use pipe inspection camera system to field verify existing sanitary / grease waste connections. Verify actual HVAC supply and return piping connections. Verify flow direction and depth prior to connection to existing plumbing systems.
3.2 APPLICATION
A. Existing materials and equipment indicated on the drawings or in the specifications to be reused shall be cleaned and reconditioned, including cleaning of piping systems and HVAC coils prior to installation and reuse.
B. Material and equipment removed that is not to be salvaged for Owner's use or for reuse on the project shall become the property of the Contractor and be removed from the site.
C. Material or equipment salvaged for Owner's use shall be carefully handled and stored where directed by the Owner or the Architect / Engineer. Relocate material and / or equipment as directed by Owner.
D. Materials and equipment not indicated to be removed or abandoned shall be reconnected to the new system.
E. Materials, equipment and housekeeping pads not to be reused or reconnected shall be removed for Owner’s review and salvaged by Contractor.
F. Prior to start of construction, Contractor shall walk areas to be renovated with Owner to identify and document items to be salvaged for Owner’s use.
G. Clean and repair existing materials and equipment that remain or are to be reused.
H. Contractor shall utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
3.3 SEQUENCE AND SCHEDULE
A. Coordinate utility service outages with Utility Company, Architect and Owner.
B. Provide additional or temporary valves, piping, ductwork and connections to maintain existing systems in service during construction.
C. Existing HVAC and Plumbing Service: Refer to drawings for work in remodeled areas.
Where facilities in these areas are to remain in service, any related work to keep the facilities in operation is specified in this Division. Maintain existing system in service until new system is complete and ready for service. Disable system only to make switchovers and connections. Obtain permission from Owner at least 48 hours before partially or completely disabling system. Minimize outage duration. Make temporary connections to maintain service in areas adjacent to work area. Maintain acceptable temperature and humidity control within existing building during renovation activities.
D. Remove and replace existing Mechanical systems and appurtenances as occasioned by new or remodeled construction. Re-establish service that may be interrupted by remodeled construction.
MECHANICAL ALTERATIONS PROJECT PROCEDURES 23 05 11-3
E. Refer to other drawings series for work in remodeled areas. Where facilities in these areas are required to remain in service, any related work required to keep these facilities in operation is specified in this Division.
F. Remove and replace existing piping, grilles, boxes and ductwork coincident with the construction.
G. Remove or relocate existing piping, grilles, ductwork or housekeeping pads as occasioned by new or remodeled construction. Cap unused HVAC or domestic piping and duct beyond the new finish line.
H. Relocate all HVAC and or domestic piping, grilles, boxes and ductwork as required to accommodate new work requiring precedence.
I. Remove concrete housekeeping pad where materials or equipment have been removed.
J. Remove all known utilities, which do not provide service to the buildings that remain.
K. Remove existing plumbing or mechanical vent penetrations through roof not to be reused.
3.4 DEMOLITION AND EXTENSION OF EXISTING MECHANICAL WORK
A. The Contractor shall modify, remove, and/or relocate all materials and items so indicated on the drawings or required by the installation of new facilities. All removals and/or dismantling shall be conducted in a manner as to produce maximum salvage. Salvage materials shall remain the property of the Owner, and shall be delivered to such destination as directed by the Owner’s representative unless they are not wanted, then it will be the responsibility of this Contractor to remove such items and properly dispose of them. Materials and/or items scheduled for relocation and which are damaged during dismantling or reassembly operations shall be repaired and restored to good operative condition. The Contractor may, at his discretion, and upon approval of the Owner’s representative substitute new materials and/or items of like design and quality in lieu of materials and/or items to be relocated.
B. All items to be relocated shall be carefully removed in reverse to original assembly or placement and protected until relocated. The Contractor shall clean, repair, and provide all new materials, fittings, and appurtenances required to complete the relocations and to restore them to good operative order. All relocations shall be performed by workmen skilled in the work and in accordance with standard practice of the trades involved.
C. When items scheduled for relocation and/or reuse are found to be in damaged condition before work has been started on dismantling, the Contractor shall call the attention of the Owner’s representative to such items and receive further instructions before removal.
Items damaged in repositioning operations are the contractor’s responsibility and shall be repaired or replaced by the contractor as approved by the owner’s representative, at no additional cost to the Owner.
D. HVAC, Plumbing, piping, ductwork and appurtenances to be removed, salvaged, or relocated shall be removed to points indicated on the drawings, specified, or acceptable to the Owner’s representative. Piping and ductwork not scheduled for reuse shall be removed to the points at which reuse is to be continued or service is to remain. Such services shall be sealed, capped, or otherwise tied-off or disconnected in a safe manner acceptable to the Construction Inspector. All disconnections or connections into the existing facilities shall be done in such a manner as to result in minimum interruption of services to adjacent occupied areas. Services to existing areas or facilities that must remain in operation during the construction period shall not be interrupted without prior specific approval of the Owner’s representative hereinbefore specified.
MECHANICAL ALTERATIONS PROJECT PROCEDURES 23 05 11-4
E. Repair adjacent construction and finishes damaged during demolition and extension work.
F. Maintain access to mechanical installations that remain active. Modify installation or provide access panel as appropriate.
G. Extend existing installations using materials and methods compatible with existing mechanical installations, or as specified.
H. Existing mechanical piping and devices found to need additional hangers installed should be added at no additional cost to the Owner.
3.5 PROTECTION OF THE WORK
A. Provide adequate temporary support and auxiliary structure as necessary to ensure structural value or integrity of affected portion of work.
B. Provide devices and methods to protect other portions of work from damage.
C. Execute fitting and adjustment of products to provide a finished installation to comply with specified products, functions, tolerances and finishes.
3.6 IDENTIFICATION OF EQUIPMENT IN RENOVATED AREAS
A. Identification of Equipment: Provide new identification of all existing equipment to be reused and located within the renovated areas. Do not include the description “existing”.
Provide new nameplates for all existing mechanical equipment in renovated areas as specified in Section 23 05 00 Mechanical General Provisions.
3.7 REFRIGERANT DISPOSAL
A. Contractor shall dispose of refrigerant from all DX equipment including refrigerant piping per OSHA, EPA, Federal, State and Local Codes.
HVAC SHOP DRAWINGS, COORDINATION DRAWINGS & PRODUCT DATA 23 05 12-1
SECTION 23 05 12
HVAC SHOP DRAWINGS, COORDINATION DRAWINGS & PRODUCT DATA
PART 1 - GENERAL
1.1 WORK INCLUDED
A. Prepare submittals as required by these specifications as outlined below.
B. The term submittal, as used herein, refers to all:
1. Shop Drawings
2. Coordination Drawings
3. Product data
C. Submittals shall be prepared and produced for:
1. Distribution as specified
2. Inclusion in the Operating and Maintenance Manual, as specified, in the related section
1.2 SHOP DRAWINGS
A. Present drawings in a clear and thorough manner. Identify details by reference to sheet and detail, schedule, or room numbers shown on Contract Drawings.
B. Show all dimensions of each item of equipment on a single composite Shop Drawing. Do not submit a series of drawings of components.
C. Identify field dimensions; show relationship to adjacent features, critical features, work, or products.
D. Submit shop drawings in plan, elevation and sections, showing equipment in mechanical equipment areas.
1.3 COORDINATION DRAWINGS
A. Present in a clear and thorough manner. Title each drawing with project name. Identify each element of drawings by reference to sheet number and detail, or room number of contract documents. Minimum drawing scale: ¼” = 1’-0”.
B. Prepare coordination drawings to coordinate installations for efficient use of available space, for proper sequence of installation, and to resolve conflicts. Coordinate with work specified in other sections and other divisions of the specifications.
C. For each mechanical room and for each outside equipment pad where equipment is located, submit plan and elevation drawings. Show:
1. Actual mechanical equipment and components to be furnished
2. Service clearance
3. Relationship to other equipment and components
4. Roof drains and leader piping
5. Fire protection piping and equipment
D. Identify field dimensions. Show relation to adjacent or critical features of work or products.
E. Related requirements:
HVAC SHOP DRAWINGS, COORDINATION DRAWINGS & PRODUCT DATA 23 05 12-2
1. Ductwork shop drawings
2. Coordination drawing specified in Division 26
F. Submit shop drawings in plan, elevation and sections, showing equipment in mechanical equipment areas.
G. Gas piping sketch indicating proposed location of piping prior to proceeding with the installation.
1.4 PRODUCT DATA AND INSTALLATION INSTRUCTION
A. Submit only pages which are pertinent to the project. All options which are indicated on the product data shall become part of the contract and shall be required whether specified are not.
B. Mark each copy of standard printed data to identify pertinent products, referenced to specification section and article number.
C. Show reference standards, performance characteristics and capacities; wiring and piping diagrams and controls; component parts; finishes; dimensions and required clearances.
D. Modify manufacturer's standard schematic drawings and diagrams to supplement standard information and to provide information specifically applicable to the work. Delete information not applicable.
E. Mark up a copy of the specifications for the product. Indicate in the margin of each paragraph the following: COMPLY, DO NOT COMPLY, or NOT APPLICABLE. Explain all DO NOT COMPLY statements.
F. Provide a separate transmittal for each submittal item. Transmittals shall indicate product by specification section name and number. Separate all submittals into appropriate specification section number. Do not combine specification sections.
1.5 MANUFACTURERS INSTRUCTIONS
A. Submit Manufacturer's instructions for storage, preparation, assembly, installation, start-up, adjusting, calibrating, balancing and finishing.
1.6 CONTRACTOR RESPONSIBILITIES
A. Review submittals prior to transmittal.
B. Determine and verify:
1. Field measurements
2. Field construction criteria
3. Manufacturer's catalog numbers
4. Conformance with requirements of Contract Documents
C. Coordinate submittals with requirements of the work and of the Contract Documents.
D. Notify the Architect/Engineer in writing at time of submission of any deviations in the submittals from requirements of the Contract Documents.
E. Do not fabricate products, or begin work for which submittals are specified, until such submittals have been produced and bear contractor's stamp. Do not fabricate products or
HVAC SHOP DRAWINGS, COORDINATION DRAWINGS & PRODUCT DATA 23 05 12-3
begin work scheduled to have submittals reviewed until return of reviewed submittals with Architect / Engineer's acceptance.
F. Contractor's responsibility for errors and omissions in submittals is not relieved whether Architect / Engineer reviews submittals or not.
G. Contractor's responsibility for deviations in submittals from requirements of Contract Documents is not relieved whether Architect/Engineer reviews submittals or not, unless Architect / Engineer gives written acceptance of the specific deviations on reviewed documents.
H. Submittals shall show sufficient data to indicate complete compliance with Contract Documents:
1. Proper sizes and capacities
2. That the item will fit in the available space in a manner that will allow proper service
3. Construction methods, materials and finishes
I. Schedule submissions at least 15 days before date reviewed submittals will be needed.
1.7 SUBMISSION REQUIREMENTS
A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Project or in the work of any other Contractor.
B. Number of submittals required:
1. Shop Drawings and Coordination Drawings: Submit one reproducible transparency and three opaque reproductions.
2. Product Data: Submit the number of copies which the contractor requires, plus those which will be retained by the Architect/Engineer.
C. Accompany submittals with transmittal letter, in duplicate, containing:
1. Date
2. Project title and number
3. Contractor's name, address and contact number.
4. The number of each Shop Drawing, Project Datum and Sample submitted
5. Other pertinent data
D. Submittals shall include:
1. The date of submission
2. The project title and number
3. Contract Identification
4. The names of:
a. Contractor
b. Subcontractor
c. Supplier
d. Manufacturer
5. Identification of the product
6. Field dimensions, clearly identified as such
7. Relation to adjacent or critical features of the work or materials
8. Applicable standards, such as ASTM or federal specifications numbers
9. Identification of deviations from contract documents
10. Suitable blank space for General Contractor and Architect/Engineer stamps
11. Contractor's signed and dated Stamp of Approval
E. Coordinate submittals into logical groupings to facilitate interrelation of the several items:
HVAC SHOP DRAWINGS, COORDINATION DRAWINGS & PRODUCT DATA 23 05 12-4
1. Finishes which involve Architect/Engineer selection of colors, textures or patterns
2. Associated items which require correlation for efficient function or for installation
1.8 SUBMITTAL SPECIFICATION INFORMATION
A. Every submittal document shall bear the following information as used in the project manual:
1. The related specification section number
2. The exact specification section title
B. Submittals delivered to the Architect/Engineer without the specified information will not be processed. The Contractor shall bear the risk of all delays, as if no submittal had been delivered.
1.9 RESUBMISSION REQUIREMENTS
A. Make re-submittals under procedures specified for initial submittals.
1. Indicate that the document or sample is a re-submittal
2. Identify changes made since previous submittals
B. Indicate any changes which have been made, other than those requested by the Architect / Engineer.
1.10 CONTRACTOR'S STAMP OF APPROVAL
A. Contractor shall stamp and sign each document certifying to the review of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the work and of Contract Documents.
B. Contractor's stamp of approval on any submittal shall constitute a representation to Owner and Architect/Engineer that Contractor has either determined and verified all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data or assumes full responsibility for doing so, and that Contractor has reviewed or coordinated each submittal with the requirements of the work and the Contract Documents.
C. Do not deliver any submittals to the Architect/Engineer that do not bear the Contractor's stamp of approval and signature.
D. Submittals delivered to the Architect/Engineer without Contractor's stamp of approval and signature will not be processed.