This document is a solicitation from the Arizona Department of Environmental Quality for a Statewide Asbestos, Lead, and Mold Consultant and Abatement Services contract. The solicitation is issued by the Department of Environmental Quality, located in Phoenix, Arizona, with the primary offeror being EMC2 (Squared), LLC, a limited liability company also based in Phoenix. The document includes multiple attachments covering various aspects of the solicitation, including offer and acceptance, confidentiality, key personnel, and methodology.

The contract seeks environmental consulting services including asbestos, lead, and mold inspections, project design, abatement oversight, and related technical services for state agencies and facilities. EMC2 proposes rates that are 5-10% lower than the average consultant rates in Arizona, with a potential 2% prompt payment discount if invoices are paid within seven to ten calendar days. The services will involve EPA-certified personnel conducting comprehensive environmental assessments, including room-by-room inspections, sample collection, laboratory analysis, and detailed reporting. The contract appears to be an indefinite delivery vehicle allowing state agencies to utilize these environmental consulting and abatement services as needed, with a focus on protecting public health and ensuring regulatory compliance.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Environmental Quality Solicitation # BPM004287: Statewide Asbestos, Lead, & Mold Consultant

Attachment 9 Supplement: Experience and Capacity Questionnaire

I. Question 1: Company Profile

1.1 EMC2 was established in 2010 to complete and continue the environmental consulting services that the 1990 established company, Environmental Management Consultants (EMC) gave origin to. The companies have been on the state environmental contract since it started in 1992.

For most of our clientele, the services rendered are identical - client consultation, inspections (lead, PCB, asbestos, indoor air quality, mold), remediation design & specification, remediation project oversight & air monitoring, etc.

The following lists number of projects EMC2 has completed since 2010 on a continuing service contract:

2010 - 2012: State Agencies: 189; School Districts: 122 311 projects 2012 - 2014: State Agencies: 143; School Districts: 138 281 projects 2014 - 2016: State Agencies: 328; School Districts: 126 454 projects 2016 - 2018: State Agencies: 197; School Districts: 131 328 projects 2018 - 2020: State Agencies: 163; School Districts: 71 234 projects 2020 - 2022: State Agencies: 167; School Districts: 73 240 projects

1,848 projects completed since 2010; Over 4,000 Bulk Samples In 2022 To Date

1.2 Date Established: February, 2010

1.3 EMC2, LLC was established as a Limited Liability Company. It was started and is managed by one owner - Howard Lange.

1.4 EMC2 is incorporated in Arizona.

1.5 EMC2's corporate office, only office, is located at 9830 South 51st Street, Suite B- 109, Phoenix, Arizona 85044. The facility has approximately 3,500 sf of working area. The management and personnel that will complete this contract will be deployed from this location.

1.6 Principal Party: Howard Lange, Owner & Managing Member

Telephone: 480.580.9610; Email: Howard@emc-az.com

Point of Contact - Contractual: Howard Lange, Owner & Managing Member Telephone: 480.580.9610; Email: Howard@emc-az.com

1.7 Full Disclosure: To my knowledge, there is not any conflict of interest between the Offerer and any state employee who functions or has responsibilities in the review or approval of the undertaking or carrying out of the contract.

Attachment 9 Supplement: Experience and Capacity Questionnaire

I. Question 1: Company Profile (Continued)

1.8 EMC2 has never filed bankruptcy.

1.9 There are no pending Security Exchange Commission investigations against

EMC2.

1.10 There are no open or pending litigation proceedings between EMC2 and any federal, state, or county agency / entity.

1.11 There are no open or pending litigation proceedings between EMC2 and any public sector client.

1.12 The company has never had an environmental project / any project pre-maturely terminated by any client - federal, state, county, public, or private.

1.13 The company has never received an EPA or OSHA notice of violation. The key employees that will complete projects under this RFP have never been issued an EPA or OSHA violation.

1.14 Company License: Arizona Department of Revenue, Transaction Privilege Tax License. See Attachment 9 Supplement 9.1.14 Company License.

II. Question 2: Company Experience

2.A. 95% of the company clients are state agencies and school districts located in Arizona.

2.B. Client Summary. The following lists clientele along with years associated as clients for the company and / or personnel (##).

1. School Districts: Washington Elementary School District (31), Avondale School District (8), Arizona State Schools for the Deaf and the Blind (26), Durango Unified School District (12), Kayenta Schools (7), Laveen Schools (17), Payson Schools (8).

2. Government Agencies: AZ Departments of (25): Transportation, Administration, Emergency & Military Affairs, Corrections, Juvenile Corrections, Health, Economic Security.

3. Tribal Nations: Colorado River Indian Tribes (19), Ak Chin (11), Hopi (9), Fort Apache (16), Gila River (7), Navajo Nation (12).

Attachment 9 Supplement: Experience and Capacity Questionnaire

II. Question 2: Company Experience (Continued)

2.C. Range in size of current clients are from a single family resident to entire state agencies and school districts. The following will list 3 examples:

1. Arizona Department of Administration - 52 State Buildings Inspections - Asbestos, Lead based paint, Mold (partial) Remediation - As needed: Specs, Oversight, EPA Testing

2. Washington Elementary School District - 30+ Campuses, 300+ Buildings Inspections - Asbestos, Lead based paint, Mold Remediation Specs, Oversight, EPA Testing - Ambient, Clearance

3. Arizona State Schools for the Deaf and Blind, Phoenix & Tucson, Arizona Project: 2 Campuses, 50+ Buildings Inspections - Asbestos, Lead based paint, Mold Remediation Specs, Oversight, EPA Testing - Ambient, Clearance

2.D. Project Examples

1. Arizona Department of Administration, Phoenix, Arizona Project: ADOA Buildings, 1510 & 1520 W. Adams, 1275 W. Washington Services included Inspections - Asbestos, Lead Based Paint, Remediation Specs including bid documents and technical requirements Remediation Oversight, EPA Testing - Ambient, Clearance

Dates: 2018-2019; All services that are EPA required prior to demolition

2. Arizona Department of Administration, Phoenix, Arizona Project: ADOC Buildings, 1601 & 1645 W. Jefferson Services include Inspections - Asbestos, Lead Based Paint, Remediation Specs including bid documents and technical requirements Project is in progress at this time. Remediation Oversight, and EPA Testing will occur later this year Dates: 2022 - 2023 Ongoing

2.E. The company has maintained it’s main clients, state agencies and school districts, since 2010. EMC2's employees have maintained these same clients for over 30 years. All on continuing-services contracts.

Attachment 9 Supplement: Experience and Capacity Questionnaire

II. Question 2: Company Experience (Continued)

2.F. Professional Associations

1. EPA certified as a ALead-Based Paint Activities Firm@ as per the Toxic Substances Control Act (TSCA) Section 402.

Advantage: A certified individual must work under a certified firm to meet the EPA requirements for lead professionals.

2. Participates in the Industrial Hygiene Proficiency Analytical Testing Program (IHPAT rounds) for Asbestos / Fibers (ASB) administered by the American Industrial Hygiene Association (AIHA).

Advantage: Ths allows us to analyze PCM air samples, after normal hours, and on weekends when most laboratories are closed. This is crucial when a business, area, etc. must be re-occupied Monday morning.

3. See Attachment 9 Supplement 9.3 - IHPAT Round Data

III. Question 3: Financial / Accounting Information

3.A. See Attachment 9 Supplement 9.3 - Financial Information Table

IV. Question 4: Proposed Project Members and Organization

4.A. See Attachment 5 Supplement - Key Personnel

V. Question 5: Subcontractors

5.A. See Attachment 8 - Proposed Subcontractors

VI. Question 6: Certificates and Licenses

6.A. See Attachment 9 Supplement 9.6 - Certificates and Licenses

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

I. Question 1: Services To Be Provided

A. EMC2 understands that the purpose of this RFQ is to obtain an industrial hygiene and environmental consulting firm to provide environmental reporting services at Using Agency sites.

Consulting services may include, but not be limited to, the following:

* Project Administration / Management and scheduling from conception to completion involving inspections, design, and oversight;

* Asbestos, Lead-Containing Materials (LCM), Lead-Based Paint (LBP) inspections including sampling, laboratory analysis, and report;

* Abatement / remediation specifications that may include bid documents;

* Remediation oversight and project documentation;

* Environmental testing during asbestos or lead-based paint abatement that may include baseline, ambient, and clearance testing as required;

* Operations and Maintenance Programs - Asbestos, Lead-based paint;

* AHERA Management Plans for school facilities or requested state agencies;

* Indoor Air Quality (IAQ) investigations, assessments, & required testing;

* Mold remediation design, oversight and testing as needed;

* Employee training programs;

B. Technicians will be EPA certified as required by current applicable regulations.

All services shall be completed in accordance with the Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), Department of Transportation (DOT), and the U.S. Department of Housing and Urban Development (HUD).

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology

A. The company will designate one individual with a technical background and experience in similar asbestos/lead/mold environmental projects to act as the Project Manager.

B. Personnel who conduct abatement project design will be accredited as follows:

1. Asbestos Abatement Project Design: EPA AHERA Project Designer

2. Lead Abatement Project Design: EPA Lead Project Designer

3. Mold - Council-Certified Indoor Environmental Consultant (CIEC) or a

Council-Certified Microbial Consultant (CMC). Both accredited by the American Council for Accredited Certification (ACAC)

C. The project design shall be site specific and includes the following minimum requirements:

1. Identify the materials to be abated and provide NESHAP category, OSHA class of work, and approximate quantities for each.

2. Provide abatement cost and duration estimates based on current conditions as determined during site Inspections as required by the Using Agency. The project duration shall be kept as short as possible and timing of each abatement activity shall be coordinated with the Using Agency to minimize negative impacts on the facility use.

3. Prepare drawings that show abatement plan.

4. Specify work areas. Contractor to determine where temporary barriers are to be installed. Identify what surfaces or items shall be protected during abatement and covered with other temporary barriers, such as polyethylene sheeting. Specify the minimum requirements for materials and their installation.

5. Reference applicable regulations for minimum acceptable work methods, and provide specific work methods where necessary.

6. List the sequence in which abatement should proceed, from containment prep, gross removal, cleaning, visual inspections, etc., and identify points where the Consultant will inspect work before the next phase of work can proceed.

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology (Continued)

C. 7. Specify contact information, information protocol, and interaction medium between Owner, Consultant, and Contractor.

8. List Pre-, During-, and Post- Submittal documents required by regulation and Owner.

D. The following parties would participate in this project / phase:

1. Project Manager

2. Field Operations Manager

3. Project Supervisors

4. Industrial Hygiene Technician(s)

E. Outline of Steps

1. After review and approval of the inspection report by the Using Agency, abatement specifications will be developed by an AHERA certified Project Designer or EPA LBP Project Designer or CIEC / CMC. A detailed site specification will be developed to meet the objectives of the client at this facility. Facility, tenant, and worker safety will be a priority.

2. Design factors that greatly affect the cost of an abatement include:

Project time frame, containment preparation (full containment, splash guards, etc.), available time periods (days, hours), full or partial abatement (spot removal), and number of regulated areas. In the development of the project manual and once the asbestos containing materials are known, the Using Agency Project Manager and the EMC representative will discuss these factors to determine which methods are most cost effective for this project while maintaining security and safety for all parties involved.

3. Whether it is determined to be more economically feasible to complete renovation or demolition of the buildings, the ACM / LBP that will be affected will have to be removed prior to any disturbance. The scope of work could range from zero abatement to total abatement depending on what is determined to be ACM / LBP.

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology (Continued)

E. 4. If the building is going to be demolished, NESHAP officials may approve Category I and possibly Category II materials to remain in place during demolition if the material is undamaged, non-friable, and will not become friable during the demolition. It is recommended that the NESHAP official be contacted on a case-by case situation to supply a determination. If this is approved, all other applicable NESHAP and OSHA regulations must be adhered to.

F. The specification will include the following sections:

* Bidding Requirements - EMC2 or Using Agency Boiler Plate

* Contract Conditions - EMC2 or Using Agency Boiler Plate

* Contract Forms - EMC2 or Using Agency Boiler Plate

* Project Information - Includes project address, duration, work hours, maps

* Project Submittals - Includes notifications to work sites, emergency services, Regulatory compliance agencies, project schedules, contingency plans, certifications, etc.

* General Conditions - site specific, coordination between client, site personnel, contractor

* Site Preparation / Temporary Facilities - fencing, sanitation, electrical, etc.

* Certificate of Worker Acknowledgment Forms - Asbestos, LBP

* Inspection Information - includes necessary information for NESHAP notification

* Scope of Work and Maps - designates areas, materials, quantities, etc.

* Work Area Preparation - Glove-bag, full containment, splash guards, etc.

* Decontamination Units and Procedures - 3 or 2 stage, personnel / bag-out

* Personal Protective Equipment (PPE) - ½ face, PAPR

* Negative Pressure Differential - inches of water, manometer

* Removal Procedures - wet methods, etc.

* Area Decontamination Procedures - step by step, inside regulated area to outside

* ACM / LBP Storage Bins - preparation and suppliers

* ACM / LBP Disposal - Approved waste sites

* QA Inspections - Pre-clean, preparation, final clean, tear-down, punchlist

* Air Monitoring - Baseline, ambient / area, clearance, personnel

* Clearance Criteria - Clearance Testing levels

* Project Close - Submittal requirements, Punch-list

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology (Continued)

G. Upon approval of the specification by the Using Agency, it may be distributed to the Abatement Contractors to obtain competitive pricing. A pre-bid conference should be held, prior to proposals being submitted, on-site so the contractors may verify existing conditions, material quantities, etc. Representatives from the Using Agency, consultant, and the site manager should be present to answer and / or clarify any questions that may arise. If necessary, we will generate an addendum to clarify or re-state portions of the specification.

H. Once the bids have been submitted, we will assist and if requested recommend a contractor to be awarded the contract. Award should be based on the company profile / history, bid price, personnel that will perform the task, and references.

Project Approach - Abatement Project Oversight Management:

A. EMC2 will follow the procedures outlined below. Depending on client preferences, steps may be added or deleted.

1. Contractor to complete the remediation specified. During all remediation activities EMC will have a representative onsite to complete air monitoring, visual inspections, specification enforcement, and to ensure a safe environment.

2. Close-out documentation and final report is completed and delivered to the client for approval.

3. Quality Assurance / Quality Control. All work performed is checked as to validity, method of performance, results, and recommendations.

4. The following parties would participate in this project / phase:

A. Project Manager B. Field Operations Manager C. Project Supervisors D. Industrial Hygiene Technician(s)

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology (Continued)

B. EMC2 shall provide the Using Agency with full time oversight and air monitoring of ACM / Microbial / LCM abatement projects in accordance with this contract and other site specific specifications where developed. EMC2 shall be the Using Agency’s Representative at the abatement project work site, and shall have the necessary authorities and responsibilities to ensure compliance with contract specifications and regulatory requirements. In the event there is a situation that would require work stoppage, EMC2 will immediately notify the Using Agency’s Representative of the situation. These situations shall include but are not limited to improper abatement methods and unsafe work practices. EMC2 shall allow authorized Using Agency representatives access to the work site, materials, records, or any other relevant data and provide proper facilities for such access and inspection.

C. Consultant personnel who provide abatement project oversight management services shall hold the following accreditations: AHERA Contractor/Supervisor and / or EPA LBP Inspector and be certified to complete Clearance Testing

D. EMC2 shall be on the site at all times to coordinate project activities. The Using Agency shall have the right to review any and all credentials of individuals proposed as authorized representatives and the right to accept or reject any individual not in compliance with Using Agency guidelines.

E. EMC2 shall monitor for other anticipated contaminants that may affect the work place safety of work site and Using Agency employees as required by the Using Agency.

F. EMC2 shall document the discussions of project meetings and provide copies of meeting minutes to all attendees.

G. EMC2 shall check the Contractor's employee records to ensure all medical records, training and certifications are current and available on-site. The Consultant shall ensure the Contractor has a copy of the written safety, respiratory protection, and hazard communications program manuals at the project site.

H. EMC2 shall ensure that all barriers, signs, and appropriate labels are posted as required pursuant to any and all regulations.

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology (Continued)

I. EMC2 shall inspect the work area preparation for completeness and to ensure that it complies with industry standards, regulatory requirements, the requirements of applicable contracts, and project specific specifications.

J. EMC2 shall monitor Contractor performance and work methods to ensure compliance with applicable regulations.

K. EMC2 shall provide recommendations and assessments of abatement work as needed to assist the Using Agency with the proper execution of the project.

L. EMC2 shall maintain a daily project log to include descriptions of the following:

1. Work being performed including area and abatement methods, & Personal protective equipment being employed

2. Containment condition / integrity / HEPA air filtration equipment operation

3. Problem incidents and their resolution

4. Inspection Results or in progress

5. EMC2 shall prepare a final report including a narrative description of:

The scope and dates of abatement, ACM and LCM; work methods, details pertinent to the reconstruction and understanding of the work performed. The Consultant may use existing report formats provided that all needed information is provided.

7. Closeout documents (including waste manifests, supervisor logs, containment logs, sign-in logs, personal air monitoring results, etc.).

8. If requested, Drawings and/or photos that depict the location of ACMs / LCMs that were abated.

9. All monitoring results including locations and a summary.

10. Daily logs & Sign-in Sheets

11. Consultant personnel certifications

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology (Continued)

N. The Consultant shall perform the following additional inspections, monitoring, and reporting activities:

1. Water filtration devices and ensure proper filters are used. Manometer (air differential) readings & Indications of airflow into containment.

2. Collect perimeter and work area air samples during abatement.

3. Conduct site inspections, estimations of quantity of work, or recognition of unusual or special situations which may affect the scheduled completion of the work.

O. Air monitoring shall be performed according to the following requirements:

1. Final clearance air monitoring shall be done in all enclosures when required by regulations. Analysis shall be by Phase Contrast Microscopy (PCM) unless otherwise specifically stated. Air sample results shall be available on the job site within 24 hours or sooner if specified by Using Agency. (Asbestos).

2. Clearance level shall be to the AHERA standard of 0.01 f/cc before the enclosure can be removed and the area re-occupied. If transmission electron microscopy (TEM) is used for final air clearance, the fiber count shall be less than 70 structures/millimeter squared for all areas that will be re-occupied. (Asbestos). Clearance sampling for lead shall be by wipe/soil methods as applicable. Clearance criteria shall be according to HUD Guidelines 1997 and analyzed by Flame Atomic Absorption Spectrometry.

3. All Asbestos Consultant personnel that analyze PCM air samples on a job site shall hold NIOSH 582 certification.

P. EMC2 shall monitor the dismantling of containment barriers and engineering controls to ensure no visible debris related to the abatement work remains, including non-ACM / LCM debris. Prior to asbestos removal the Consultant is responsible to ensure the Abatement Contractor notifies ADEQ, designated county agencies, and the Using Agency, if requested. The notification form shall comply with 40 CFR, Part 61, Subpart M. Following completion of the abatement, the consultant shall provide the PM with written confirmation (clearance letter) that the project has passed inspection and air clearance protocols and teardown is complete.

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

II. Question 2: Project Design and Oversight Management Methodology (Continued)

Q. EMC2 shall ensure that all visible debris and ACM / LCM waste has been removed. Lab reports and recommendations related to the project shall be submitted to the Using Agency prior to final payment.

R. In general, comply with applicable regulations, guided by common sense, to achieve the Using Agency’s goals. Good communication between all parties AT

ALL TIMES.

III. Question 3: Building Inspection Methodology

A. Project Approach - Asbestos Survey. EMC2 will follow the procedures outlined below. Depending on client preferences, steps may be added or deleted.

1. Pre-Project Conference. Review of Scope of Work, limitations, expectations, variables or assumptions, and client Information.

2. Site Visit. Obtain answers to questions that have not been answered.

Complete a walk-thru of the buildings to verify conditions.

3. Schedule project, available times, confirm conditions, etc.

4. The inspection phase will be completed by EPA certified personnel — AHERA-certified asbestos building inspectors following ASTM E2356-09, Standard Practice For Building Inspections. Client will be kept up-to-date on progress.

The inspection will be performed by Work practices will follow all applicable (OSHA) regulations to ensure the safety of the inspectors and the tenants.

The building(s) will be was inspected on a room-by-room basis to identify suspect materials that may contain asbestos. Suspect materials are grouped as “Homogeneous Areas (HA)”. A Homogeneous Area is defined as a material that is uniform in color and texture that is used in the same manner.

Representative samples will be taken of each suspect material or Homogeneous Area as per OSHA / EPA / AHERA protocol. These samples will be transported with proper chain-of custody and submitted to a NVLAP/AIHA-accredited laboratory for analysis to determine the presence of Asbestos Containing Materials (ACM) at this facility.

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

III. Question 3: Building Inspection Methodology (Continued)

A. 5. All suspect materials will be determined to be either friable or non-friable by touch. A material is considered friable if when dry, it may be crumbled, pulverized, or reduced to powder by hand pressure. According to EPA standards, these materials are considered Regulated Asbestos Containing Materials (RACM) and have a high probability of becoming airborne during renovation and / or demolition.

The EPA considers a material non-friable if, when dry, it can not be crumbled, pulverized, or reduced to powder by hand pressure. These materials are considered Non Regulated Asbestos Containing Materials (non-RACM) and some may be classified as Category I or II Non-friable materials. These materials historically will not become friable during renovation and / or demolition and have limited probability of releasing airborne fibers.

6. Inspection report will be produced and delivered to client. Meeting will be set-up to discuss remediation specifics.

The inspection report will include the following sections:

1. Inspection Information (Date, inspector, affected areas, etc.)

2. Legal & Building Description

3. List of Homogenous Areas (Suspect Materials)

4. Bulk Sample Locations w/ Results

5. Summary of Asbestos Containing Materials - Locations &

Quantities including drawings

6. Conclusions / Recommendations - Categorize and assess the

ACM conditions

7. Lab Analysis / Bulk Reports

8. Assurance of Accreditation (Includes inspector certifications)

9. Additional Hazards Observed

10. Photographs if requested

7. The following parties would participate in this project / phase:

1. Project Manager

2. Field Operations Manager

3. Project Supervisors

4. Industrial Hygiene Technician(s)

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

III. Question 3: Building Inspection Methodology (Continued)

B. Project Approach - Lead Survey. EMC2 will follow the procedures outlined below. Depending on client preferences, steps may be added or deleted.

1. Pre-Project Conference. Review of Scope of Work, limitations, expectations, variables or assumptions, and client Information.

2. Site Visit. Obtain answers to questions that have not been answered.

Complete a walk-thru of the buildings to verify conditions.

3. Schedule project, available times, confirm conditions, etc.

4. The inspection phase will be completed by EPA certified personnel — Lead Inspector or Risk Assessor following EPA guidelines Client will be kept up-to-date on progress.

The inspection will be performed by Work practices will follow all applicable (OSHA) regulations to ensure the safety of the inspectors and the tenants. The building(s) will be was inspected on a room-by-room basis to identify suspect “Paint Combinations” that may contain lead.

Representative samples and / or “XRF Shots”will be taken of each suspect combination as per OSHA / EPA protocol. These samples will be transported with proper chain-of custody and submitted to a ELLAP / AIHA-accredited laboratory for AAS analysis to determine the presence of Lead-based Paint or Lead Containing Coatings.

5. Inspection report will be produced and delivered to client. Meeting will be set-up to discuss remediation specifics.

The inspection report will include the following sections:

1. Inspection Information (Date, inspector, affected areas, etc.)

2. Legal & Building Description

3. List of surfaces tested.

4. Chip Sample / Test Shot Locations w/ Results

5. Summary of LCC or LBP - Locations, Quantities, Maps

6. Conclusions / Recommendations - Assess the hazards

7. Lab Analysis / XRF Report

8. Assurance of Accreditation (Includes inspector certifications)

9. Additional Hazards Observed

10. Photographs if requested

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

III. Question 3: Building Inspection Methodology (Continued)

C. Project Approach - Mold Survey. EMC2 will follow the procedures outlined below. Depending on client preferences, steps may be added or deleted.

1. Pre-Project Conference. Review of Scope of Work, limitations, expectations, variables or assumptions, and client Information.

2. Schedule project, available times, confirm conditions, etc.

3. The investigation will be completed by ACAC certified personnel following current industry standards. Client will be kept up-to-date on progress.

4. Generally the following steps will be taken on the initial inspection / testing of the affected areas where concerns or complaints have been received from the building occupants:

A. The area(s) will be was inspected on a room-by-room basis to identify visible or suspect water damaged areas / materials.

B. Identify any unusual odors that are uncommon for the using space.

C. Visually scan walls, ceilings, and floors utilizing a Flir Thermal Imaging Camera to possibly detect unseen moisture in cavities or on surfaces.

D. Sample for airborne fungal spore concentrations in the affected area(s) using spore traps followed by microbial laboratory analysis. Visible growth may be swabbed or tape lift sampled.

E. TSI Q-TRAX: Collect data utilizing direct read instrumentation including Carbon Dioxide, Temperature, and Relative Humidity.

5. Inspection report will be produced and delivered to client. The inspection report will include the following sections:

1. Inspection Information (Date, inspector, affected areas, etc.)

2. Legal & Building Description

3. Observations, occupancy, and visible water damaged materials

4. Sample Locations w/ Results, direct read levels

5. Summary of findings, Conclusions / Recommendations

6. Lab Analysis Reports with Chain of Custody (COC)

7. Assurance of Accreditation (Includes inspector certifications)

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

IV. Question 4: Alternative Methods

4.1 Alternative methods or plans suggested by the Using Agency, EMC2, or the contractor will be considered and approved if they achieve the project objective, reduce cost, reduce project duration, are safe for the occupants / employees / workers, and meet all applicable codes and regulations.

V. Question 5: Perimeter Air Sampling Methodology

5.1 During indoor or outdoor remediation, perimeter air sampling is almost always completed to attest / document that there is clean air between the remediation area and the public / outside of the regulated area(s).

5.2 Equipment Necessary

A. Air pumps - Low or high volume, battery operated or electric.

B. Sample stands, electric cords, generator or electrical outlet.

C. Air Cassettes: As per NIOSH Method 7400, PCM involves using a 0.8 to

1.2 µm mixed cellulose ester membrane, 25 mm diameter, 50 mm conductive cowl on cassette.

D. Sample labels, air data sheets, Chain of Custody records

5.3 Sampling

A. Calibrate the sampling pump with a Rotameter that has also been calibrated with a Gilabrator, or similar primary calibrator. Pumps should be calibrated before and after sampling time.

B. Sample Volume. The minimum recommended volume for TEM and PCM is 400 L at 0.1 fiber/cc. Sampling time is adjusted to obtain optimum fiber loading on the filter. A sampling rate of 1 to 4 L/min for eight hours (700to 2800 L) is appropriate in non-dusty atmospheres containing 0.1 fiber/cc. Dusty atmospheres i.e., areas with high levels of asbestos, require smaller sample volumes (<400 L) to obtain countable samples.

In relatively clean atmospheres where targeted fiber concentrations are much less than 0.1 fiber/cc, use larger sample volumes (3,000 to 10,000 L) to achieve quantifiable loadings. Take care, however, not to overload the filter with background dust.

Attachment 11 Supplement: Method of Approach / Method of Proposal

Asbestos, Lead, and Mold Consultant Services (SOW 2-A1)

V. Question 5: Perimeter Air Sampling Methodology (Continued)

5.3 C. Indoor Sampling. PCM analysis is used for indoor air samples. When analysis shows total fiber count above the OSHA action level 0.1 f/cc then TEM (U.S. EPA's Modified Yamate Method) is used to identify asbestos from non-asbestos fibers.

Sampling pumps should be placed four to five feet above ground level away from obstructions that may influence air flow. The pump can be placed on a table or counter. Indoor sampling utilizes high flow rates to increased sample volumes (2000 L for PCM and 2800 to 4200 L for TEM) in order to obtain lower detection limits below the standard, (i.e., 0.01 f/cc or lower [PCM]

D. Sample Locations. Always look for worst-case locations where highest fiber-count might occur. In contained / regulated areas, daily samples should be collected outside the decontamination chamber, HEPA exhaust (all machines), adjacent areas, clean room of decontamination chamber, and areas where the only barriers are poly sheeting, E. The number of samples taken daily vary based on area size, category of materials being removed, stage of abatement being performed (preparation, removal, decontamination, and cleaning), and number of regulated areas involved. Some locations, multiple samples a day are recommended to document the abatement activities are staying inside the containment / regulated area.

F. Consultants are hired to protect the liability of their client. Air samples are one of the methods used to complete that goal.

179954 Highlight

179954 Highlight

179954 Highlight

Attachment 1 Offer and Acceptance Form
Attachment 2 Boycott Disclosure
Attachment 3 Confidential Information
Attachment 4 Conformance Statements
Attachment 5 Supplement - Key Personnel
Attachment 5 Supplement - Resumes
Attachment 6 Letter of Insurability
Attachment 6 Supplement Insurance
Attachment 7 Organization Profile
Attachment 7 Supplement 1 - Financial Security Bank Letter
Attachment 8 Proposed Subcontractors
Attachment 8 Subcontractor Supplement 3 of 3 - EMSL Analytical
Attachment 8 Subcontractor Supplement 1 of 3 - EMC Labs
Attachment 8 Subcontractor Supplement 2 of 3 - Fiberquant
Attachment 9 Supplement 9.1 Company Profile
Attachment 9 Experience and Capacity Questionaire
Attachment 9 Supplement 9.1.14 Company License
Attachment 9 Supplement 9.3 IHPAT 230
Attachment 9. Supplement 9.6 Certificates and Licenses
Attachment 10 References
Attachment 11 Method of Approach
Attachment 11 Supplement 1
Attachment 12 Pricing Document
Attachment 13 Offer Checklist