About this file

This is a specifications document for the San Antonio Water System (SAWS) related to the construction of water main infrastructure in San Antonio, Texas. The project involves the construction of approximately 4,941 linear feet of 16-inch water main via open cut for the Zarzamora 230 AC Phase 1 Water Main project, designated as SAWS Job No. 25-7006. The project scope includes excavation, pipe installation, testing, and restoration work necessary to complete the water main installation. Sealed bids are requested for this construction project, with specifications detailing all technical requirements, materials standards, and construction methodologies that contractors must follow to submit compliant proposals.

The specifications document establishes the technical standards and quality requirements that bidders must meet, including pipe material specifications, installation procedures, testing protocols, and restoration standards. The document serves as the binding technical reference for all contractors submitting bids and establishes the baseline for contract performance and acceptance. Key technical elements covered include pipe bedding requirements, joint installation procedures, pressure testing standards, and completion criteria for the water main segment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .