About this file
This document is a Task Assignment Notification Form and Scope of Services for a post-design construction phase services contract between the Florida Wildlife Commission (FWC) as the client and Cardno, Inc. as the consultant. The project involves providing construction phase services for a replacement structure for Water Control Structure No. S-12 at Dinner Island, located in Florida.
The scope of services includes four primary tasks: attending a pre-construction meeting, responding to one request for information (RFI), reviewing up to eight shop drawings and material submittals, and conducting four site visits during project construction. The total cost for these post-design phase services is $19,423.34, with individual task costs ranging from $2,779.30 for the pre-construction meeting to $1,785.17 per site visit. The project is scheduled to run from May 1st to August 1st, 2021, with specific deliverable due dates for each task. Services not included are bid phase services, utility coordination, payment application approvals, construction administration, and testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-770000-21334-A1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C atalina
W eaver
D igitally signed by
C atalina W eaver D ate: 2021.03.16 18:12:21 -04'00'
Katherine Burke
D igitally signed by
Katherine Burke D ate: 2021.03.18 08:46:38 -04'00'
:\U sers\catalina.w eaver\A ppD ata\L ocal\M icrosoft\W indow s\IN etC ache\C ontent.O utlook\H
11E 4048\D inner Island Structure S-12 Post-D esign
ScopeV 5.docx
S
O
P E
O F
S E
R V
IC
E
S D in n er Islan d
W ater C on trol S tructu re S
-12 P ost-D esign ervices 3/3/2021
1.0
P R
O
JE
C T
O B
JE
C
T
IV
E
F W
C (C
L
IE
N T
) w ould like C ardno, Inc. (C O
N
SU
L T
A N
T ) to perform construction phase services for the replacem ent structure for W ater C ontrol Structure N
o. S
-12 at D inner Island.
2.0 P
R O
JE
C
T S
C O
P E
O F
W O
R K
T his Scope of Services includes:
T ask 1:
P re-C on struction M eeting
T he C
O N
SU
L
T A
N T
’s P ost-D esign Project M anager w ill attend the Pre-C onstruction M eeting in-person.
T ask 2:
R F
I R espon se
T he C
O N
S U
L T
A N
T w ill provide responses for up to one (1) construction phase R F
I. T he C
L
IE
N T w ill com pile all R
F I’s from the C ontractor in to one R
F I for the C
O N
SU
L
T A
N T
’s review
T ask 3:
S h op D raw in g R eview he C
O N
S U
L T
A N
T w ill perform up to eight (8) shop draw ings and m aterial subm ittal review
s. T he subm ittals w ill be review ed for general conform ance w ith the construction plans and specifications.
T ask 4:
S ite V isits
T he C
O N
SU
L
T A
N T w ill m ake up to four (4) site visits during project construction. B rief sum m ary reports w ill be provided subsequent to each site visit. A dditional site visits can be provided to the C L
IE
N
T upon request at a cost of $1,785.17 per visit.
3.0 S
E R
V
IC
E S N
O T
IN
C
L U
D
D
B id Phase Services
U tility C oordination aym ent A pplication A pprovals onstruction A dm inistration esting
4.0 A
D D
IT
IO
N A
L
SE
R V
IC
he C
O N
SU
L
T A
N T w ill provide additional services w henever requested in w riting by the C
L
IE
N T based on a negotiated lum p sum or not-to-exceed allow ance.
5.0 C
L
IE
N T
R E
SP
O
N S
IB
IL
IT
IE
S
T he C
L
IE
N T w ill provide the follow ing for the C O
N
SU
L T
A N to use and rely on:
Invitation to P re-C onstruction M eeting ite A ccess ubm ittal of the follow ing docum entation to the C
O N
SU
L
T A
N T o
R F
I’s (com piled in single docum ent)
:\U sers\catalina.w eaver\A ppD ata\L ocal\M icrosoft\W indow s\IN etC ache\C ontent.O utlook\H
11E 4048\D inner Island Structure S-12 Post-D esign
ScopeV 5.docx hop D raw ings
6.0 P
R O
JE
C
T S
C H
E D
U L
E A
N D
C O
M P
E N
SA
T
IO
N he scope of services identified above w ill be com pleted w ithin the follow ing deliverable schedule and com pensation. T he project tasks w ill be billed based upon a lum p sum (L
S) am ount.
st-D esig n P h ase
T ask
D eliverab le D u e D ate In vo ice
A m o u n t
1. P re-C onstruction M eeting P re-C onstruction M eeting S um m ary (W ord)
A pril 20 th, 2021 $ 2,779.30
2. R F
I R esponse
O ne R
F I R esponses (W ord)
W ithin 7 days of R
F I receipt
$ 3,283.32
3. S hop D raw ing R eview tam ped/S igned S hop D raw ings (W ord, C A
D
W ithin 14 days of S hop D raw ing receipt
$ 6,220.04
4. F irst S ite V isit
S um m ary R eport (W ord)
June 20 th, 2021
$ 1,785.17
4a. S econd S ite V isit
S um m ary R eport (W ord)
July 10 th, 2021
$1,785.17
4b. T hird S ite V isit
S um m ary R eport (W ord)
July 20 th, 2021
$1,785.17
4c. F ourth S ite V isit
S um m ary R eport (W ord)
A ugust 20 th, 2021 $1,785.17
P o st-D esig n P h ase T o tal
$19,423.34 T he deliverable due dates show n in the table above are based upon the planned construction schedule beginning on
M ay 1 st 2021 and ending on A ugust 1 st, 2021. T he deliverable dates are subject to change based upon the actual construction schedule.