CN-770000-16019.pdf

PDF 28 MB Posted

Attached to
Master Agreement FL|16019|4299a180a1ad870281fc97eebfe6dc1c
Contract number
16019
Issued by
Florida

About this file

This document is a Request for Statement of Qualifications (RFSOQ) submitted by Southeastern Surveying and Mapping Corporation (SSMC) to the Florida Fish and Wildlife Conservation Commission (FWC) for a Regional Professional Services Continuing Contract. The solicitation covers professional surveying and mapping services across multiple regions of Florida, including Northeast, Northwest, North Central, Southwest, and South regions. The document details SSMC's qualifications, project experience, key personnel, and capabilities in land surveying, geographic information systems (GIS), utility designation, and mapping services.

The contract is structured as an indefinite delivery vehicle for professional surveying services, with SSMC proposing to provide comprehensive surveying capabilities across various state agency projects. The firm has demonstrated experience with similar projects for state agencies including the Florida Department of Environmental Protection, Northwest Florida Water Management District, South Florida Water Management District, and Tampa Bay Water. SSMC has multiple regional offices throughout Florida and highlights its technical capabilities, including 47 Certified Survey Technicians, 7 Certified GIS Professionals, and an extensive equipment inventory comprising GPS units, data collectors, total stations, vehicles, and specialized surveying equipment. The proposal emphasizes the firm's ability to provide rapid response and comprehensive surveying services across different terrains and project types for state and local government clients.

View the file

Other files

File Type Posted
CN-770000-16019-TA3.pdf PDF
CN-770000-16019-TA-04.pdf PDF
CN-770000-13007-TA002.pdf PDF
CN-770000-16019-TA-01.pdf PDF
CN-770000-16019-TA-02.pdf PDF
CN-770000-16019-A1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Fish and Wildlife Conservation Commission

ORIGINAL

Proposal: RFSOQ Project Number: FWC 14/15-37 Project Name: Regional Professional Services Continuing Contract

Submit to: Florida Fish and Wildlife Conservation Commission Purchasing Office, Suite 100 2590 Executive Center Circle Tallahassee, Florida 32301

Due Date: April 17, 2015 at 5:00 PM EDT

Prepared By:

Submitted by: Corporate Office:

Southeastern Surveying and Mapping Corporation 6500 All American Boulevard, Orlando, Florida, 32810 Phone: (407) 292-8580

Professional Surveying and Mapping in All Terrains

Professional Surveying and Mapping - Roadways, Highways, Interstates

Geographic Information Systems

Sub-Surface Utility Designation/Location

Three independent Divisions working together for our Client’s needs.

Steven L. Anderson, Jr., PSM, PLS Charles M. Arnett, PSM Russell G. Daly, PSM, PLS Michael L. Dougherty, PSM Bruce C. Ducker, PSM James M. Dunn, II, PSM Mark J. Efird, PSM Thomas F. Ferguson, PSM Ronnie A. Figueroa, PSM, GISP Tate B. Flowers, PLS Robert W. Gardner, PSM Brian R. Garvey, PE Daniel J. Henry, PSM, PLS Mathew G. Jennings, RLS Gary B. Krick, PSM Brad J. Lashley, PSM, PLS Myron F. Lucas, PSM James E. Mazurak, PSM info@southeasternsurveying.com

Thomas K. Mead, PSM, PLS Timothy O. Mosby, PSM James L. Petersen, PSM William C. Rowe, PSM Tony G. Syfrett, PSM, PLS John S. Thomas, PSM Edward W. Wackerman, PLS (FL) Kirk R. Hall, EI, GISP Brad A. Stroppel, EI, GISP Catherine E. Galgano, GISP Cheryl A. Isenberg, GISP Patrick J. Phillips, GISP Thomas P. Young, Jr., SIT, GISP Donna L. Canney, CST IV Frank B. Henry, CST IV David M. Rentfrow, CST IV Steve D. Smith, CST IV Celeste B. van Gelder, CST IV

Land Surveying & Mapping Services • Sub-Surface Utility Designation & Location Services • Geographic Information Systems • GPS Asset Inventories

Florida Fish and Wildlife Conservation Commission April 17, 2015 Purchasing Office, Suite 100 2590 Executive Center Circle Tallahassee, Florida 32301

RE: RFSOQ Project Number: FWC 14/15-37 / Project Name: Regional Professional Services Continuing Contract

This letter serves as the Southeastern Surveying and Mapping Corporation’s (SSMC) Statewide Team’s and the Firm’s President Gary B. Krick’s commitment to the Florida Fish and Wildlife Conservation Commission that this Statewide Team will dedicate the necessary time to any assigned task.

SSMC’s management team has literally decades of Surveying and Mapping experience specifically working on Continuing Professional Surveying and Mapping Service Contracts with Public Sector Clients.

SSMC has remained financially sound and retained or added experienced employees and added to our resources during the latest economic slowdown. This is not an accident, this is because of good management and the Florida Fish and Wildlife Conservation Commission will benefit as a result of this attention to the details.

SSMC brings an often overlooked bonus of a non-traditional GIS Division and Utility Division.

SSMC’s clients are continually surprised at the way these non-traditional divisions enhance our services.

SSMC’s three independent divisions work together daily for our client’s needs.

SSMC’s team is ready to hit the ground running working for you with no learning curve required and is seriously committed to long term relationships.

Professional Surveying and Mapping is our business and we take it seriously!

SSMC appreciates this opportunity to be an extension of the staff of the Florida Fish and Wildlife Conservation Commission and to provide Professional Surveying and Mapping Services.

Sincerely, Gary B. Krick, PSM / President

TABLE OF CONTENTS

Letter of Commitment

Acknowledgement Forms ............................................................................ Section 4.2 Addendum 1 Addendum 2 Addendum 3 Addendum 4, to include Attachments A & B Addendum 5

Architect-Engineer Qualifications (Standard Form 330) .............................. Section 5.1

Professional Qualifications Supplement (PQS) ........................................... Section 5.2

Certifications ................................................................................................ Section 5.3 5.3.1: Firm’s Current Professional Registration Certification 5.3.2: Florida Corporate Charter

Subconsultants Statement .......................................................................... Section 5.4

SECTION 4.2

Florida Fish and Wildlife Conservation Commission

Commissioners

Richard A. Corbett

Chairman

Tampa

Brian Yablonski

Vice Chairman

Tallahassee

Ronald M. Bergeron

Fort Lauderdale

Richard Hanas

Oviedo

Aliese P. “Liesa” Priddy

Immokalee

Bo Rivard

Panama City

Charles W. Roberts III

Tallahassee

Executive Staff

Nick Wiley

Executive Director

Eric Sutton

Assistant Executive Director

Jennifer Fitzwater

Chief of Staff

DATE: March 27, 2015

ADDENDUM NO.: 1

BID NO.: FWC 14/15-37

BID TITLE: Request for Statement of Qualification for

Professional Services

UPDATE: Uploading Attachments A & B

If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.

Betty Dennis, Procurement Manager

ADDENDUM ACKNOWLEDGMENT FORM

VENDOR NAME:

VENDOR FEID#:

ADDRESS:

Finance and Budget Office

Jodi Bailey

Chief Operating Officer

(850) 488-6551

(850) 922-8060 FAX

CITY/STATE:

PHONE #:

FAX #:

Managing fish and wildlife resources for their long-term well-being and the benefit of people.

620 South Meridian Street

Tallahassee, Florida

32399-1600 Voice: (850) 488-4676

Hearing/speech-impaired:

(800) 955-8771 (T)

(800) 955-8770 (V)

MyFWC.com

E-MAIL:

AUTHORIZED SIGNATURE:

TITLE:

Southeastern Surveying and Mapping Corporation

59-1621976

6500 All American Boulevard

Orlando, Florida 32810

(407) 292-8580 Ext. 2211

(407) 522-0901 gkrick@southeasternsurveying.com

President Gary B. Krick, PSM

DATE: March 30, 2015

ADDENDUM NO.: 2

BID NO.: FWC 14/15-37

BID TITLE: Professional Services

UPDATE: REVISING ATTACHMENT B FORM

PROFESSIONAL QUALIFICATION SUPPLEMENT

(PQS)

If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued.

An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.

Betty Dennis

Procurement Manager

ADDENDUM ACKNOWLEDGMENT FORM

VENDOR NAME: _____________________________________________________

VENDOR FEID#: _____________________________________________________

ADDRESS: ___________________________________________________________

CITY/STATE: ________________________________________________________

PHONE #: ___________________________________________________________

FAX #: _______________________________________________________________

E-MAIL: _____________________________________________________________

AUTHORIZED SIGNATURE: __________________________________________

TITLE: ______________________________________________________________

Southeastern Surveying and Mapping Corporation

59-1621976

6500 All American Boulevard

Orlando, Florida 32810

(407) 522-0901

(407) 292-8580 Ext. 2211 gkrick@southeasternsurveying.com

Conservation Commission

Commissioners

Richard A. Corbett

Chairman Tampa

Brian Yablonski

Vice Chairman Tallahassee

Ronald M. Bergeron

Fort Lauderdale

Richard Hanas

Oviedo

Aliese P. “Liesa” Priddy

Immokalee

Bo Rivard

Panama City

Charles W. Roberts III

Tallahassee

Executive Staff

Nick Wiley

Executive Director

Eric Sutton

Assistant Executive Director

Jennifer Fitzwater

Chief of Staff

Managing fish and wildlife resources for their long-term well-being and the benefit of people.

620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: (850) 488-4676

Hearing/speech-impaired:

(800) 955-8771 (T)

(800) 955-8770 (V)

MyFWC.com

Finance and Budget Office

Jodi Bailey

Chief Operating Officer

(850) 488-6551

(850) 922-8060 FAX

DATE: APRIL 6, 2015

ADDENDUM NO.: 3

BID NO.: FWC 14/15-37

BID TITLE: REGIONAL PROFESSIONAL SERVICES

UPDATE: REVISED CALENDAR OF EVENTS

If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.

Betty Dennis , Procurement Manager

ADDENDUM ACKNOWLEDGMENT FORM

VENDOR NAME: _____________________________________________________

VENDOR FEID#: _____________________________________________________

ADDRESS: ___________________________________________________________

CITY/STATE: ________________________________________________________

PHONE #: ___________________________________________________________

FAX #: _______________________________________________________________

E-MAIL: _____________________________________________________________

AUTHORIZED SIGNATURE: __________________________________________

TITLE: ______________________________________________________________

Southeastern Surveying and Mapping Corporation

59-1621976

6500 All American Boulevard

Orlando, Florida 32810

(407) 292-8580 Ext. 2211

(407) 522-0901 gkrick@southeasternsurveying.com

Conservation Commission

Commissioners

Richard A. Corbett

Chairman

Tampa

Brian Yablonski

Vice Chairman

Tallahassee

Ronald M. Bergeron

Fort Lauderdale

Richard Hanas

Oviedo

Aliese P. “Liesa” Priddy

Immokalee

Bo Rivard

Panama City

Charles W. Roberts III

Tallahassee

Executive Staff

Nick Wiley

Executive Director

Eric Sutton

Assistant Executive Director well-being and the benefit of people.

620 South Meridian Street

Tallahassee, Florida

32399-1600

Voice: (850) 488-4676

Hearing/speech-impaired:

(800) 955-8771 (T)

(800) 955-8770 (V)

MyFWC.com

Finance and Budget Office

Jodi Bailey

Chief Operating Officer

(850) 488-6551

(850) 922-8060 FAX

DATE: APRIL 8, 2015

ADDENDUM NO.: 4

BID NO.: FWC 14/15-37

BID TITLE: REGIONAL PROFESSIONAL SERVICES

UPDATE: CORRECTED ATTACHMENTS

If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.

Gerri Faircloth, Procurement Manager

ADDENDUM ACKNOWLEDGMENT FORM

VENDOR NAME: _____________________________________________________

VENDOR FEID#: _____________________________________________________

ADDRESS: ___________________________________________________________

CITY/STATE: ________________________________________________________

PHONE #: ___________________________________________________________

FAX #: _______________________________________________________________

E-MAIL: _____________________________________________________________

AUTHORIZED SIGNATURE: __________________________________________

TITLE: ______________________________________________________________

Southeastern Surveying and Mapping Corporation

59-1621976

6500 All American Boulevard

Orlando, Florida 32810

(407) 292-8580 Ext. 2211

(407) 522-0901 gkrick@southeasternsurveying.com

ATTACHMENT A

SUBMIT SOQ TO:

FLORIDA FISH AND WILDLIFE CONSERVATION

COMMISSION

PURCHASING OFFICE, SUITE 100

2590 Executive Center Circle

TALLAHASSEE, FLORIDA 32301

PHONE: (850) 488-3427

REQUEST FOR

STATEMENTS OF QUALIFICATIONS (RFSOQ)

CONTRACTUAL SERVICES

ACKNOWLEDGEMENT FORM

SOQs WILL BE OPENED AT April 20, 2015 @ 2:30 PM EST

AND MAY NOT BE WITHDRAWN WITHIN 90 DAYS AFTER SUCH DATE AND TIME.

SOLICITATION NO.

FWC 14/15-37

RFSOQ TITLE: Professional Services Continuing Contract

CONSULTANT NAME: REASON FOR NOT SUBMITTING SOQ:

CONSULTANT MAILING ADDRESS:

CITY – STATE – ZIP CODE:

AREA CODE/TELEPHONE NUMBER:

AREA CODE/FAX NUMBER: FEID NUMBER:

I certify that this SOQ is submitted without prior understanding, agreement, or connection with any corporation, firm, or person submitting a response for the same professional services, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this SOQ and certify that I am authorized to sign this acknowledgement for the respondent.

AUTHORIZED SIGNATURE (MANUAL) AUTHORIZED SIGNATURE (TYPED) TITLE

A Request for Statements of Qualifications (RFSOQ) is the first step in the process for selecting a contractor(s) for a specific project or group of similar projects. Following determination and ranking of the best qualified firms, no less than the top three firms may be requested to submit proposals for the specific project(s) and/or will be requested to participate in oral discussions.

GENERAL CONDITIONS

SEALED RESPONSE: All SOQ sheets and this form must be executed and submitted in a sealed envelope. The face of the envelope shall contain, in addition to the address, the date and time of the opening and the solicitation number.

All SOQs are subject to the conditions specified herein. Those which do not comply with these conditions are subject to rejection.

1. EXECUTION OF SOQ: SOQs must contain a manual signature of the authorized representative in the space provided above. The SOQ must be typed.

2. NO RESPONSE SUBMITTED: If not submitting a response, return only this acknowledgement form, and explain the reason in the space provided above. Failure to respond three times in succession without justification shall be cause for removal of the firm's name from the mailing list without further notice.

Southeastern Surveying and Mapping Corporation

6500 All American Boulevard

Orlando, Florida 32810

(407) 292-8580 Ext. 2211

(407) 522-0901 59-1621976

Gary B. Krick, PSM President

ATTACHMENT A

3. SOQ OPENING: The opening shall be public, on the date, location and the time specified on the acknowledgement form. It's the responder's responsibility to assure that his SOQ is delivered at the proper time and place of opening. SOQs which for any reason are not so delivered, will not be considered. Offers by telegram, telephone or facsimile are not acceptable. A SOQ may not be altered after opening.

4. INTERPRETATIONS: Any questions concerning conditions and specifications shall be directed in writing to this office for receipt no later than ten (10) days prior to the opening. Inquiries must reference the date of opening and the solicitation number. No interpretation shall be considered binding unless provided in writing by the Department of Environmental Protection Contracts Office.

5. CONFLICT OF INTEREST: This process is subject to the provisions of Chapter 112, Florida Statutes.

Responders must disclose with their SOQ the name of any officer, director, or agent who is also an employee of the State of Florida, or any of its agencies. Further, all responders must disclose the name of any State employee who owns, directly or indirectly, an interest of five percent (5%) or more in the proposer's firm or any of its branches. In accordance with Chapter 287, Florida Statutes, no person or firm receiving a contract that has not been procured pursuant to Section 287.057(1), (2) or (3) to perform a feasibility study of the potential implementation of a subsequent contract, participating in the drafting of an invitation to bid or request for proposals, or developing a program for future implementation shall be eligible to contract with the agency for any other contracts dealing with the specific subject matter; nor shall any firm in which such person has any interest be eligible to receive such a contract. Responders must disclose with their response any such conflict of interest.

6. AWARDS: See special conditions contained in the RFSOQ.

7. DISPUTES: Any actual or prospective responder who disputes the reasonableness, necessity or competitiveness of the terms and conditions of this RFSOQ, selections, or award recommendation shall file such protest in accordance with Section 120.57(3), Florida Statutes, and applicable agency rules. Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, shall constitute a waiver of proceedings.

8. LEGAL REQUIREMENTS: Applicable provisions of all federal, state, county or local laws, and of all ordinances, rules and regulations shall govern development, submittal and evaluation of all SOQs received in response hereto and shall govern any and all claims and disputes which may arise between person(s) submitting an SOQ hereto and the State of Florida, by and through its officers, employees and authorized representatives, or any other person, natural or otherwise, and lack of knowledge by any proposer shall not constitute a cognizable defense against the legal effect thereof.

9. PUBLIC ENTITY CRIMES: A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, F.S., for Category Two, for a period of 36 months from the date of being placed on the convicted vendor list.

10. DISCRIMINATORY VENDOR LIST: An entity or affiliate who has been placed on the discriminatory vendor list may not submit a bid on a contract to provide goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, many not submit bids on leases of real property to a public entity, may not award or perform work as a contractor, supplier, subcontractor or consultant under contract with any public entity, and may not transact business with any public entity. The Florida Department of Management Services is responsible for maintaining the discriminatory vendor list and intends to post the list on its website. Questions regarding the discriminatory vendor list may be directed to the Florida Department of Management Services, Office of Supplier Diversity at 850/487-0915.

NOTE: ANY AND ALL SPECIAL CONDITIONS AND SPECIFICATIONS ATTACHED HERETO WHICH VARY

FROM THESE GENERAL CONDITIONS SHALL HAVE PRECEDENCE.

FWC FORM RFSOQ-A (Rev. 9/01)

Conservation Commission

Commissioners

Richard A. Corbett

Chairman

Tampa

Brian Yablonski

Vice Chairman

Tallahassee

Ronald M. Bergeron

Fort Lauderdale

Richard Hanas

Oviedo

Aliese P. “Liesa” Priddy

Immokalee

Bo Rivard

Panama City

Charles W. Roberts III

Tallahassee

Executive Staff

Nick Wiley

Executive Director

Eric Sutton

Assistant Executive Director well-being and the benefit of people.

620 South Meridian Street

Tallahassee, Florida

32399-1600

Voice: (850) 488-4676

Hearing/speech-impaired:

(800) 955-8771 (T)

(800) 955-8770 (V)

MyFWC.com

Finance and Budget Office

Jodi Bailey

Chief Operating Officer

(850) 488-6551

(850) 922-8060 FAX

DATE: APRIL 14, 2015

ADDENDUM NO.: 5

BID NO.: FWC 14/15-37

BID TITLE: REGIONAL PROFESSIONAL SERVICES

UPDATE: QUESTIONS & ANSWERS

If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.

Gerri Faircloth, Procurement Manager

ADDENDUM ACKNOWLEDGMENT FORM

VENDOR NAME: _____________________________________________________

VENDOR FEID#: _____________________________________________________

ADDRESS: ___________________________________________________________

CITY/STATE: ________________________________________________________

PHONE #: ___________________________________________________________

FAX #: _______________________________________________________________

E-MAIL: _____________________________________________________________

AUTHORIZED SIGNATURE: __________________________________________

TITLE: ______________________________________________________________President Gary B. Krick, PSM gkrick@southeasternsurveying.com

(407) 522-0901

(407) 292-8580 Ext. 2211

Orlando, Florida 32810

6500 All American Boulevard

59-1621976

Southeastern Surveying and Mapping Corporation

SECTION 5.1

ARCHITECT - ENGINEER QUALIFICATIONS

PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS

A. CONTRACT INFORMATION

1. TITLE AND LOCATION (City and State)

Florida Fish and Wildlife Conservation Commission (Tallahassee, Florida)

2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER

March 31, 2015 RFSOQ No. FWC 14/15-37

B. ARCHITECT-ENGINEER POINT OF CONTACT

4. NAME AND TITLE

Gary B. Krick, PSM / President/Project Manager

5. NAME OF FIRM

Southeastern Surveying and Mapping Corporation

6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS

(407) 292-8580 Ext. 2211 (407) 292-0140 gkrick@southeasternsurveying.com

C. PROPOSED TEAM

(Complete this section for the prime contractor and all key subcontractors.)

(Check)

PR

IM

E

J- V

PA

R

TN

ER

SU

BC

O N

TR

AC

TO

R

9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT

a.

Southeastern Surveying and Mapping Corporation

CHECK IF BRANCH OFFICE

6500 All American Boulevard Orlando, FL 32810

Prime Consultant b.

Southeastern Surveying and Mapping Corporation

CHECK IF BRANCH OFFICE

1130 Highway 90 Chipley, Florida 32428

Prime Consultant c.

Southeastern Surveying and Mapping Corporation

CHECK IF BRANCH OFFICE

Cypress Business Center 8301 Cypress Plaza Drive, Suite 104 Jacksonville, Florida 32256

Prime Consultant d.

Southeastern Surveying and Mapping Corporation

CHECK IF BRANCH OFFICE

University Corporate Park 10770 North 46th Street, Suite C300 Tampa, Florida 33617

Prime Consultant e.

CHECK IF BRANCH OFFICE

f.

CHECK IF BRANCH OFFICE

D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)

AUTHORIZED FOR LOCAL REPRODUCTION

MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) PAGE 1

D. ORGANIZATIONAL CHART OF PROPOSED TEAM

STANDARD FORM 330 (6/2004) PAGE 1D

Project Surveyor Steve L. Anderson, Jr., PSM Michael L. Dougherty, PSM

Bruce C. Ducker, PSM James M. Dunn, II, PSM

Ronnie Figueroa, PSM, GISP Timothy O. Mosby, PSM

Business Development Coordinator

Russell G. Daly, PSM

Project Assistant David M. Rentfrow, CST IV

Field Team Technicians Jaret W. Auld Aaron G. Bell

Austen T. Barfield Kevin J. Bell, CST I

Richard Blackmon, CST II Steven C. Borden Charles A. Bowker

Paul B. Bowker, CST III Jim O. Bozarth

James L. Bratcher Nathan K. Breter, CST I

Christopher Bryan, CST II Steven J. Carp

Arrington C. Carter Christopher N. Chambers

Alex Chan Stephen L. Chastain

Thomas J. Collins Lee M. Connell

Joseph E. Cutting Dylan M. Davidson

James C. Dismuke, II, CST I Ellis P. Dockery

John S. Drury, CST III Sawanuka Drury Wade N. Dickens

Dail D. Dybdal Trahern D. Eggen Joshua A. Fitcher

David N. Gale Curtis J. Garvin, CST I

Daniel J. Gonzalez Phillip R. Griffin Tony E. Hagan

Shane A. Hendershot Daniel J. Henry, PSM, PLS

Frank B. Henry, CST IV Robert L. Hicks, CST I

Samuel S. Hodges, CST I Howard S. Hollis Miken C. Hooks

Ronald J. Hutson

Field Team Managers Thomas F. Ferguson, PSM

Mark W. Klaers, CST III Josh M. Morris

Project Managers Raymondjames Hicks, GPRT

M. Scott Sowards, GPRT Christopher Taylor, GPRT

Utility Coordinator Dawn Knight, GPRT

Field Team Technicians Pervin Adkins, GPRT Jon M. Arnett, GPRT

Grazio E. Blevins, GPRT Branden A. Briley

Kevin W. Calhoun, GPRT Joseph R. Cartagena

Joshua A. Carp Ian A. Cross

Miguel A. Gonzalez James Hackworth, GPRT

Monacarlo V. Ingram, GPRT Jeffery P. Jones, GPRT Christopher S. Maggard Eric M. Mulroney, GPRT James D. Murphy, GPRT

Colby K. Pierce John K. Rigdon

John D. Simpson, GPRT Cody W. Syfrett

Ronald A Thigpen Ted L. Truchan, GPRT

Division Manager Darryll E. DeMarsh, GPRT

Project Managers/Project Surveyors Gary B. Krick, PSM

James L. Petersen, PSM Thomas K. Mead, PSM Tony G. Syfrett, PSM

Robert W. Gardner, PSM John S. Thomas, PSM Charles M. Arnett, PSM

Edward W. Wackerman, PLS

Human Resource Manager Debra J. Leise

Account Payable Kelly Kockelman

Accounts Receivable Kelli S. Taylor

Marketing Manager Heather M. Krick

Contracts/Risk Manager Rebecca G. Bess, Esq.

Records/Research Donna L. Walter

Administrative Assistants Katrina M. Blevins

Steve C. Brown, CST I Merissa A. Erickson

Tammy L. Hicks Kathy E. Morris

Tina L. Via Receptionist

Georgia A. Connell Comptroller

William S. Snarski

GIS DIVISION

CAD Manager William C. Rowe, PSM

Division Manager Brian R. Garvey, PE

Technicians Scott M. Evans, CST I

James M. Hardee, CST II Brian E. Latchaw

Robert C. Loucks, CST II Alex D. Marrero

David A. Santiago Thomas Young Jr., SIT, GISP

Senior Analysts Cathy E. Galgano, GISP Cheryl A. Isenberg, GISP Patrick J. Phillips, GISP

CAD Technicians John M. Ballard, II

Eric E. Cain Charlie R. Corbitt

Brooks M. Davis, CST I Joey D. Finch

Tate B. Flowers, PLS James L. Gilbert John W. Gray, Jr.

Douglas B. McInnis, CST III Randolph C. Rain

Dana S. Sowers, CST I James A. Williams, CST I

Senior CAD Technicians Matthew G. Jennings, RLS Ryan E. Johnson, CST II

Holland J. Kent, CST I Gregory M. Kime

Brad J. Lashley, PSM Joseph S. Locklin, CST III

Brad E. Nelson Eddie E. Richardson, PSM

Luis A. Santana Celeste van Gelder, CST IV

Senior Survey Technicians Myron F. Lucas, PSM

James E. Mazurak, PSM Stephen K. Ray, SIT

Michael J. Stewart SIT

Assistant Project Engineers Kirk R. Hall, EI, CST I, GISP Bradford A. Stroppel, EI, GISP

Legend:

PLS: Professional Land Surveyor PSM: Professional Surveyor & Mapper RLS: Registered Land Surveyor (GA) PE: Professional Engineer EI: Engineering Intern SIT: Surveyor in Training (Florida)

(qualified to sit for the State Exam) GIS: Geographic Information System (GIS)

Professionals (GISP) GPRT: Ground Penetrating Radar Trained GPS: Global Positioning System Esq.: Esquire

Network Administrators William N. Clark Richard T. Nguy

UTILITY DIVISION

Senior Utility Coordinator Pamela A. Young

Assistant CAD Coordinator Steven D. Smith CST IV

CAD Coordinator Donna L. Canney, CST IV

Utility Field Supervisor Christopher M. Schultz, GPRT

Field Team Technicians Jeffery M. Ivans, CST I

Logan L. Jennings David G. Johnson Bernard V. Keith James A. Lane

Jonathan L. Lipford Benjamin W. Locke

Richard D. Locklin, CST I Corri S. Maloy Phillip L. Mars

Carlos J. Martin Nicholas E. Mazurak

Anita G. Metzger Delious R. Massaline Zachary T. Mitchell

Austin J. Montgomery Chad J. Morrin Josh M. Morris

Scott A. Morris, CST III Samuel P. Orem

William Pearce, Jr., CST III Kenney E. Pearson

Curtis R. Peters Dustin M. Purdee

Kevin M. Robinson, CST I Trenton J. Rolling

Larry J. Romano, CST I Ryan A. Rose

Kevin M. Ruehl, CST III Wesley T. Scholl Bradley E. Sisler

Michael K. Sisler, CST III Jacob L. Stewart

Andrew R. Strickland Jeremy A. Thomas David L. Thompkins

Raymond J. Tondorf, CST I Juan R. Torres

Kenneth Umphreys, CST II Michael D. Vetter

Edward F. Wolfrey, CST I Christopher M. Woodward

John D. York, CST I

GPS Coordinators Julio C. Rivera, CST III Scott F. Stewart, SIT

CAD DIVISION

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT

(Complete one Section E for each key person.)

12. NAME

13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE

Gary B. Krick, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM

42 42

15. FIRM NAME AND LOCATION (City and State)

Southeastern Surveying and Mapping Corporation (Orlando, Florida)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Valencia Community College Trimble GPS Surveying Training Center, San Jose, CA Continuing Education including yearly seminars for licensing requirements

Professional Surveyor and Mapper (Florida) #LS4245 (1986)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

Former Board Member of the Florida Department of Agriculture and Consumer Services Board of Professional Surveyors and Mappers, Florida Surveying and Mapping Society; Central Florida Chapter and Volusia County Chapters of the Florida Surveying and Mapping Society; National Society of Professional Surveyors and Mappers; Florida Utility Coordinating Committee; American Public Works Assoc.;

FL GPS Users Group; Common Ground Alliance

19. RELEVANT PROJECTS

a.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiwa Springs State Park Boundary/Management Lines Survey Apopka, Orange County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC prepared a Boundary Survey of the referenced boundary lines, showing boundary conflicts such as encroachments, mowing, etc.; set standard galvanized posts at each angle point and post the lines with green metal "T-posts" at 150 foot intervals or blazing trees if there are adequate trees, and showed the State Plane Coordinates and latitude/longitude for each corner. Photographs were taken of the completed management lines and added to the digital files.(3,313 LF) SSMC Project Cost - $ 7,755.51 Project Role - Project Manager/Project Surveyor b.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Tomoka State Park Volusia County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed a Specific Purpose Survey that included Boundary Line Identification. The scope consisted of traversing the subject boundary lines based on the Boundary Survey prepared by Sliger & Associates, dated 05/17/1991 that was furnished by the client, recovering monumentation and holding this monumentation for the line maintenance survey. The line was posted; boundary conflicts such as encroachments, mowing, etc. were located and shown; standard galvanized posts were set at each angle point and at 200 foot intervals along the line, photos of the complete management lines were taken. (10,000 LF) SSMC Project Cost - $ 22,646.94 Project Role - Project Manager/Project Surveyor c.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiva River Basin State Parks - Neighborhood Lakes Lake County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed Specific Purpose Survey-Management Line Survey: Traversed the subject boundary lines, tied monumentation and held monumentation for the line maintenance; prepared a Specific Purpose Survey of the reference and identified parcel, showed boundary conflicts; set standard galvanized posts at each angle point and post the lines with green metal "T-posts" at 150' intervals or blazing trees if there are adequate trees; Photographs were taken of the complete management lines and added to the digital files; Each boundary corner was referenced showed the State Plane Coordinates and latitude/longitude.

SSMC Project Cost - $ 11,751.09 Project Role - Project Manager/Project Surveyor d.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: Lake Hart, Lake Mary Jane, Lake Ajay & Lake Hatchineha Orange and Osceola Counties, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

SSMC performed Hydrographic Surveys to include: Lake depths and elevations using a Digital Sonar Fathometer linked to a GPS receiver resulting in an x, y, and z position for each sounding.

SSMC Project Cost - $104,818.00 Project Role - Project Manager/Project Surveyor e.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: 2011 Restoration Science Department Aerial Imagery 10 Florida Counties

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed Static Airborne GPS and Static GPS for Aerial Targets for Vegetation Mapping of Various SFWMD Areas in Broward, Osceola, Polk, Okeechobee, Highlands, Martin, Palm Beach, Glades, Hendry and Miami Dade Counties SSMC Project Cost - $ 248,154.80 Project Role - Project Manager/Project Surveyor

STANDARD FORM 330 (6/2004) PAGE 2

James L. Petersen, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM

37 34

15. FIRM NAME AND LOCATION (City and State)

Southeastern Surveying and Mapping Corporation (Orlando, Florida)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Seminole Community College Continuing Education including yearly seminars for licensing requirements

Professional Surveyor and Mapper (Florida) #LS4791 (1990)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

Florida Surveying and Mapping Society; Central Florida Chapter of the Florida Surveying and Mapping Society; National Society of Professional Surveyors; Florida Utilities Coordination Committee; Florida GPS Users Group; University of Florida Geomatics Program Advisory Committee

19. RELEVANT PROJECTS

a.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiwa Springs State Park Boundary/Management Lines Survey Apopka, Orange County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC prepared a Boundary Survey of the referenced boundary lines, showing boundary conflicts such as encroachments, mowing, etc.; set standard galvanized posts at each angle point and port the lines with green metal "T-posts" at 150 foot intervals or blazing if there are adequate trees, and showed the State Plane Coordinates and latitude/longitude for each corner.

Photographs were taken of the completed management lines and added to the digital files.(3,313 LF) SSMC Project Cost - $ 7,755.51 Project Role - Project Manager/Project Surveyor b.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Tomoka State Park Volusia County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed a Specific Purpose Survey that included Boundary Line Identification. The scope consisted of traversing the subject boundary lines based on the Boundary Survey prepared by Sliger & Associates, dated 05/17/1991 that was furnished by the client, recovering monumentation and holding this monumentation for the line maintenance survey. The line was posted; boundary conflicts such as encroachments, mowing, etc. were located and shown; standard galvanized posts were set at each angle point and at 200 foot intervals along the line, photos of the complete management lines were taken. (10,000 LF) SSMC Project Cost - $ 22,646.94 Project Role - Project Manager/Project Surveyor c.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiva River Basin State Parks - Neighborhood Lakes Lake County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed Specific Purpose Survey-Management Line Survey: Traversed the subject boundary lines, tied monumentation and held monumentation for the line maintenance; prepared a Specific Purpose Survey of the reference and identified parcel, showed boundary conflicts; set standard galvanized posts at each angle point and post the lines with green metal "T-posts" at 150' intervals or blazing if there are adequate trees; Photographs were taken of the complete management lines and added to the digital files; Each boundary corner was referenced showed the State Plane Coordinates and latitude/longitude.

SSMC Project Cost - $ 11,751.09 Project Role - Project Manager/Project Surveyor d.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: Lake Hart, Lake Mary Jane, Lake Ajay & Lake Hatchineha Orange and Osceola Counties, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

SSMC performed Hydrographic Surveys to include: Lake depths and elevations using a Digital Sonar Fathometer linked to a GPS receiver resulting in an x, y, and z position for each sounding.

SSMC Project Cost - $104,818.00 Project Role - Project Manager/Project Surveyor e.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: 2011 Restoration Science Department Aerial Imagery 10 Florida Counties

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed Static Airborne GPS and Static GPS for Aerial Targets for Vegetation Mapping of Various SFWMD Areas in Broward, Osceola, Polk, Okeechobee, Highlands, Martin, Palm Beach, Glades, Hendry and Miami Dade Counties.

SSMC Project Cost - $ 248,154.80 Project Role - Project Manager/Project Surveyor

STANDARD FORM 330 (6/2004) PAGE 3

Thomas K. Mead, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM

30 26

15. FIRM NAME AND LOCATION (City and State)

Southeastern Surveying and Mapping Corporation (Chipley, Florida)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Valencia Community College GPS Training Course, Geoplane Continuing Education for Licensing Requirements

Professional Land Surveyor (Alabama) # 32373-S Professional Surveyor and Mapper (Florida) # LS5624

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

Member of Alabama Society of Professional Land Surveyors, Member of North Florida Chapter of the Florida Surveying and Mapping Society, Florida Chapter of the Urban and Regional Information Systems Assoc., Florida GPS Users Group, and the Chipola Jr. College Surveying & Mapping Advisory Committee. Chipola Work Force Board Junior Achievement Instructor.

19. RELEVANT PROJECTS

a.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Apalachicola Wildlife Management Area-Site #1 Gulf County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC cut and staked approximately 1.6 miles of boundary line, and set lathes at 200' intervals. The historic boundary survey of the tract was provided by O'Neal Surveying and Mapping, Inc.

SSMC Project Cost - $ 6,500.00 Project Role - Project Manager/Project Surveyor b.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: L. Kirk Edwards Wildlife and Environmental Area Leon County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC located Horizontal and Vertical Control at two sites as directed by personnel from O'Neal Surveying & Mapping Corporation.

SSMC Project Cost - $ 1,000.00 Project Role - Project Manager/Project Surveyor c.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Florida Caverns State Park Marianna, Jackson County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC provided all research of existing horizontal and vertical control in project area to support new project control, and established a minimum of two (2) new horizontal and vertical control points at Visitor's Parking Lot. Horizontal position in Florida North Zone State Plain Coordinates and Vertical positions in NAVD 88 datum.

Field services were performed to verify and adjust all control data.

SSMC Project Cost - $ 650.00 Project Role - Project Manager/Project Surveyor d.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Florida’s First Magnitude Springs - Brunson Landings Tract Washington County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed a Boundary Survey: established boundary corners and reset any missing corners, remove encroachments, proved each position and found or set all section and quarter section corners, located above ground improvements to include fences, roads, utilities and usages if existing, prepared descriptions/sketches reflective of boundary line changes for each adjoiner, prepared new descriptions/sketches for the Plum Creek Timber Company, Inc. acquisition and reflected on the final drawing.

SSMC Project Cost - $ 34,243.55 Project Role - Project Manager/Project Surveyor e.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Falling Waters State Park Washington County, Florida

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed a Boundary Survey for the original boundary of Falling Waters State Park, Set Galvanized metal fence posts 1' inside the property at each property corner and on the property line every 200'. (148 ac) SSMC Project Cost - $23,159.55 Project Role - Project Manager/Project Surveyor

STANDARD FORM 330 (6/2004) PAGE 4

Tony G. Syfrett, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM

28 8

15. FIRM NAME AND LOCATION (City and State)

Southeastern Surveying and Mapping Corporation (Chipley, Florida)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Continuing Education for Licensing Requirements Professional Land Surveyor (Alabama) # 32378-S

Professional Surveyor and Mapper (Florida) # LS5943

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

Member of Alabama Society of Professional Land Surveyors, President of the Chipola Chapter of the Florida Surveying and Mapping Society, Member of the North Florida Chapter of the Florida Surveying and Mapping Society

19. RELEVANT PROJECTS

a.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Apalachicola Wildlife Management Area-Site #1 Gulf County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC cut and staked approximately 1.6 miles of boundary line, and set lathes at 200' intervals. The historic boundary survey of tract was provided by O'Neal Surveying and Mapping, Inc.

SSMC Project Cost - $ 6,500.00 Project Role - Project Manager/Project Surveyor b.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: L. Kirk Edwards Wildlife and Environmental Area Leon County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC located Horizontal and Vertical Control at two sites as directed by personnel from O'Neal Surveying & Mapping Corporation.

SSMC Project Cost - $ 1,000.00 Project Role - Project Manager/Project Surveyor c.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Florida Caverns State Park Marianna, Jackson County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC provided all research of existing horizontal and vertical control in project area to support new project control, and established a minimum of two (2) new horizontal and vertical control points at the Visitor's Parking Lot using GPS. Horizontal position is relative to Florida North Zone State Plain Coordinates and Vertical positions are relative to NAVD 88 datum. Field services were performed to verify and adjust all control data.

SSMC Project Cost - $ 650.00 Project Role - Project Manager/Project Surveyor d.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Florida’s First Magnitude Springs - Brunson Landings Tract Washington County, Florida

PROFESSIONAL SERVICES CONSTRUCTION (If applicable)

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed Boundary Survey: established boundary corners and reset any missing corners, remove encroachments, proved each position and find/set all section and quarter section corners, located above ground improvements to include fences, roads, utilities and usages if existing, prepared descriptions/sketches reflective of boundary line changes for each adjoiner, prepared new descriptions/sketches for Plum Creek Timber Company, Inc. acquisition and reflect on final drawing. (280 ac.)

SSMC Project Cost - $ 34,243.55 Project Role - Project Manager/Project Surveyor e.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Falling Waters State Park Washington County, Florida

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed a Boundary Survey for the original boundary of Falling Waters State Park, Set Galvanized metal fence posts 1' inside the property at each property corner and on the property line every 200'. (148 ac) SSMC Project Cost - $23,159.55 Project Role - Project Manager/Project Surveyor

STANDARD FORM 330 (6/2004) PAGE 5

Robert W. Gardner, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM

38 6

15. FIRM NAME AND LOCATION (City and State) Southeastern Surveying and Mapping Corporation (Jacksonville, Florida)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Cleveland State University - Major Civil Engineering (1979) Defense Mapping School - Construction Surveying, Virginia (1977)

Professional Surveyor and Mapper (Florida) # LS5603 (1996)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

Florida Crown Chapter of the Florida Surveying and Mapping Society, Florida Surveying and Mapping Society, National Society of Professional Surveyors, U. S. Green Building Council, American Society of Highway Engineers (Northeast Section), Society of American Military Engineers, Associated Builders and Contractors, Inc.

19. RELEVANT PROJECTS

a.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Homosassa Springs Wildlife State Park Homosassa, Citrus County, Florida

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC provided research of existing horizontal and vertical control in the project area to support new project control, and established a minimum of three (3) new horizontal and vertical control points using GPS. Horizontal values are relative to Florida North Zone State Plane Coordinates and vertical values are relative to NAVD 88 datum. Field services were performed to verify and adjust all control data.

SSMC Project Cost - $ 1,000.00 Project Role - Project Manager/Project Surveyor b.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Paynes Prairie Preserve State Park-FWC Lab Micanopy, Alachua County, Florida

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC set (2) Control Points, Horizontal and Vertical using GPS for the Paynes Prairie Preserve State Park as a Sub-Consultant to O'Neal Surveying & Mapping Corporation.

SSMC Project Cost - $ 550.00 Project Role - Project Manager/Project Surveyor c.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Suwannee River State Park Suwannee County, Florida

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC found and recovered (2) existing monitoring wells, located (9) soil locations along the boundaries of the sink holes; and re-established benchmarks near the site. The services were performed in the area of assessment activities conducted by the Client (Ecology and Environment) and FDEP.

SSMC Project Cost - $ 1,680.00 Project Role - Project Manager/Project Surveyor d.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SRWMD: Osceola Land and Timber/Santa Fe River Ranch Addition Alachua County, Florida

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed Boundary Survey: Osceola Land & Timber/Santa Fe River Ranch Addition (463 ac.)

SSMC Project Cost - $ 14,550.00 Project Role - Project Manager/Project Surveyor e.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SRWMD: Madison Taylor Timberlands, LLC/ Aucilla Corridor Addition Madison & Jefferson Counties, Florida

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

For this project SSMC performed a Boundary Survey and GPS Survey for Madison Taylor Timberlands, LLC Aucilla Corridor Addition Project. (1,257 ac.)

SSMC Project Cost - $13,500.00 Project Role - Project Manager/Project Surveyor

STANDARD FORM 330 (6/2004) PAGE 6

John S. Thomas, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM

27 4

15. FIRM NAME AND LOCATION (City and State)

Southeastern Surveying and Mapping Corporation (Jacksonville, Florida)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .