CN-770000-16019.pdf
PDF 28 MB Posted
- Contract number
- 16019
- Issued by
- Florida
About this file
This document is a Request for Statement of Qualifications (RFSOQ) submitted by Southeastern Surveying and Mapping Corporation (SSMC) to the Florida Fish and Wildlife Conservation Commission (FWC) for a Regional Professional Services Continuing Contract. The solicitation covers professional surveying and mapping services across multiple regions of Florida, including Northeast, Northwest, North Central, Southwest, and South regions. The document details SSMC's qualifications, project experience, key personnel, and capabilities in land surveying, geographic information systems (GIS), utility designation, and mapping services.
The contract is structured as an indefinite delivery vehicle for professional surveying services, with SSMC proposing to provide comprehensive surveying capabilities across various state agency projects. The firm has demonstrated experience with similar projects for state agencies including the Florida Department of Environmental Protection, Northwest Florida Water Management District, South Florida Water Management District, and Tampa Bay Water. SSMC has multiple regional offices throughout Florida and highlights its technical capabilities, including 47 Certified Survey Technicians, 7 Certified GIS Professionals, and an extensive equipment inventory comprising GPS units, data collectors, total stations, vehicles, and specialized surveying equipment. The proposal emphasizes the firm's ability to provide rapid response and comprehensive surveying services across different terrains and project types for state and local government clients.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-770000-16019-TA3.pdf | ||
| CN-770000-16019-TA-04.pdf | ||
| CN-770000-13007-TA002.pdf | ||
| CN-770000-16019-TA-01.pdf | ||
| CN-770000-16019-TA-02.pdf | ||
| CN-770000-16019-A1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
ORIGINAL
Proposal: RFSOQ Project Number: FWC 14/15-37 Project Name: Regional Professional Services Continuing Contract
Submit to: Florida Fish and Wildlife Conservation Commission Purchasing Office, Suite 100 2590 Executive Center Circle Tallahassee, Florida 32301
Due Date: April 17, 2015 at 5:00 PM EDT
Prepared By:
Submitted by: Corporate Office:
Southeastern Surveying and Mapping Corporation 6500 All American Boulevard, Orlando, Florida, 32810 Phone: (407) 292-8580
Professional Surveying and Mapping in All Terrains
Professional Surveying and Mapping - Roadways, Highways, Interstates
Geographic Information Systems
Sub-Surface Utility Designation/Location
Three independent Divisions working together for our Client’s needs.
Steven L. Anderson, Jr., PSM, PLS Charles M. Arnett, PSM Russell G. Daly, PSM, PLS Michael L. Dougherty, PSM Bruce C. Ducker, PSM James M. Dunn, II, PSM Mark J. Efird, PSM Thomas F. Ferguson, PSM Ronnie A. Figueroa, PSM, GISP Tate B. Flowers, PLS Robert W. Gardner, PSM Brian R. Garvey, PE Daniel J. Henry, PSM, PLS Mathew G. Jennings, RLS Gary B. Krick, PSM Brad J. Lashley, PSM, PLS Myron F. Lucas, PSM James E. Mazurak, PSM info@southeasternsurveying.com
Thomas K. Mead, PSM, PLS Timothy O. Mosby, PSM James L. Petersen, PSM William C. Rowe, PSM Tony G. Syfrett, PSM, PLS John S. Thomas, PSM Edward W. Wackerman, PLS (FL) Kirk R. Hall, EI, GISP Brad A. Stroppel, EI, GISP Catherine E. Galgano, GISP Cheryl A. Isenberg, GISP Patrick J. Phillips, GISP Thomas P. Young, Jr., SIT, GISP Donna L. Canney, CST IV Frank B. Henry, CST IV David M. Rentfrow, CST IV Steve D. Smith, CST IV Celeste B. van Gelder, CST IV
Land Surveying & Mapping Services • Sub-Surface Utility Designation & Location Services • Geographic Information Systems • GPS Asset Inventories
Florida Fish and Wildlife Conservation Commission April 17, 2015 Purchasing Office, Suite 100 2590 Executive Center Circle Tallahassee, Florida 32301
RE: RFSOQ Project Number: FWC 14/15-37 / Project Name: Regional Professional Services Continuing Contract
This letter serves as the Southeastern Surveying and Mapping Corporation’s (SSMC) Statewide Team’s and the Firm’s President Gary B. Krick’s commitment to the Florida Fish and Wildlife Conservation Commission that this Statewide Team will dedicate the necessary time to any assigned task.
SSMC’s management team has literally decades of Surveying and Mapping experience specifically working on Continuing Professional Surveying and Mapping Service Contracts with Public Sector Clients.
SSMC has remained financially sound and retained or added experienced employees and added to our resources during the latest economic slowdown. This is not an accident, this is because of good management and the Florida Fish and Wildlife Conservation Commission will benefit as a result of this attention to the details.
SSMC brings an often overlooked bonus of a non-traditional GIS Division and Utility Division.
SSMC’s clients are continually surprised at the way these non-traditional divisions enhance our services.
SSMC’s three independent divisions work together daily for our client’s needs.
SSMC’s team is ready to hit the ground running working for you with no learning curve required and is seriously committed to long term relationships.
Professional Surveying and Mapping is our business and we take it seriously!
SSMC appreciates this opportunity to be an extension of the staff of the Florida Fish and Wildlife Conservation Commission and to provide Professional Surveying and Mapping Services.
Sincerely, Gary B. Krick, PSM / President
TABLE OF CONTENTS
Letter of Commitment
Acknowledgement Forms ............................................................................ Section 4.2 Addendum 1 Addendum 2 Addendum 3 Addendum 4, to include Attachments A & B Addendum 5
Architect-Engineer Qualifications (Standard Form 330) .............................. Section 5.1
Professional Qualifications Supplement (PQS) ........................................... Section 5.2
Certifications ................................................................................................ Section 5.3 5.3.1: Firm’s Current Professional Registration Certification 5.3.2: Florida Corporate Charter
Subconsultants Statement .......................................................................... Section 5.4
SECTION 4.2
Florida Fish and Wildlife Conservation Commission
Commissioners
Richard A. Corbett
Chairman
Tampa
Brian Yablonski
Vice Chairman
Tallahassee
Ronald M. Bergeron
Fort Lauderdale
Richard Hanas
Oviedo
Aliese P. “Liesa” Priddy
Immokalee
Bo Rivard
Panama City
Charles W. Roberts III
Tallahassee
Executive Staff
Nick Wiley
Executive Director
Eric Sutton
Assistant Executive Director
Jennifer Fitzwater
Chief of Staff
DATE: March 27, 2015
ADDENDUM NO.: 1
BID NO.: FWC 14/15-37
BID TITLE: Request for Statement of Qualification for
Professional Services
UPDATE: Uploading Attachments A & B
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.
Betty Dennis, Procurement Manager
ADDENDUM ACKNOWLEDGMENT FORM
VENDOR NAME:
VENDOR FEID#:
ADDRESS:
Finance and Budget Office
Jodi Bailey
Chief Operating Officer
(850) 488-6551
(850) 922-8060 FAX
CITY/STATE:
PHONE #:
FAX #:
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600 Voice: (850) 488-4676
Hearing/speech-impaired:
(800) 955-8771 (T)
(800) 955-8770 (V)
MyFWC.com
E-MAIL:
AUTHORIZED SIGNATURE:
TITLE:
Southeastern Surveying and Mapping Corporation
59-1621976
6500 All American Boulevard
Orlando, Florida 32810
(407) 292-8580 Ext. 2211
(407) 522-0901 gkrick@southeasternsurveying.com
President Gary B. Krick, PSM
DATE: March 30, 2015
ADDENDUM NO.: 2
BID NO.: FWC 14/15-37
BID TITLE: Professional Services
UPDATE: REVISING ATTACHMENT B FORM
PROFESSIONAL QUALIFICATION SUPPLEMENT
(PQS)
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued.
An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.
Betty Dennis
Procurement Manager
ADDENDUM ACKNOWLEDGMENT FORM
VENDOR NAME: _____________________________________________________
VENDOR FEID#: _____________________________________________________
ADDRESS: ___________________________________________________________
CITY/STATE: ________________________________________________________
PHONE #: ___________________________________________________________
FAX #: _______________________________________________________________
E-MAIL: _____________________________________________________________
AUTHORIZED SIGNATURE: __________________________________________
TITLE: ______________________________________________________________
Southeastern Surveying and Mapping Corporation
59-1621976
6500 All American Boulevard
Orlando, Florida 32810
(407) 522-0901
(407) 292-8580 Ext. 2211 gkrick@southeasternsurveying.com
Conservation Commission
Commissioners
Richard A. Corbett
Chairman Tampa
Brian Yablonski
Vice Chairman Tallahassee
Ronald M. Bergeron
Fort Lauderdale
Richard Hanas
Oviedo
Aliese P. “Liesa” Priddy
Immokalee
Bo Rivard
Panama City
Charles W. Roberts III
Tallahassee
Executive Staff
Nick Wiley
Executive Director
Eric Sutton
Assistant Executive Director
Jennifer Fitzwater
Chief of Staff
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: (850) 488-4676
Hearing/speech-impaired:
(800) 955-8771 (T)
(800) 955-8770 (V)
MyFWC.com
Finance and Budget Office
Jodi Bailey
Chief Operating Officer
(850) 488-6551
(850) 922-8060 FAX
DATE: APRIL 6, 2015
ADDENDUM NO.: 3
BID NO.: FWC 14/15-37
BID TITLE: REGIONAL PROFESSIONAL SERVICES
UPDATE: REVISED CALENDAR OF EVENTS
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.
Betty Dennis , Procurement Manager
ADDENDUM ACKNOWLEDGMENT FORM
VENDOR NAME: _____________________________________________________
VENDOR FEID#: _____________________________________________________
ADDRESS: ___________________________________________________________
CITY/STATE: ________________________________________________________
PHONE #: ___________________________________________________________
FAX #: _______________________________________________________________
E-MAIL: _____________________________________________________________
AUTHORIZED SIGNATURE: __________________________________________
TITLE: ______________________________________________________________
Southeastern Surveying and Mapping Corporation
59-1621976
6500 All American Boulevard
Orlando, Florida 32810
(407) 292-8580 Ext. 2211
(407) 522-0901 gkrick@southeasternsurveying.com
Conservation Commission
Commissioners
Richard A. Corbett
Chairman
Tampa
Brian Yablonski
Vice Chairman
Tallahassee
Ronald M. Bergeron
Fort Lauderdale
Richard Hanas
Oviedo
Aliese P. “Liesa” Priddy
Immokalee
Bo Rivard
Panama City
Charles W. Roberts III
Tallahassee
Executive Staff
Nick Wiley
Executive Director
Eric Sutton
Assistant Executive Director well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: (850) 488-4676
Hearing/speech-impaired:
(800) 955-8771 (T)
(800) 955-8770 (V)
MyFWC.com
Finance and Budget Office
Jodi Bailey
Chief Operating Officer
(850) 488-6551
(850) 922-8060 FAX
DATE: APRIL 8, 2015
ADDENDUM NO.: 4
BID NO.: FWC 14/15-37
BID TITLE: REGIONAL PROFESSIONAL SERVICES
UPDATE: CORRECTED ATTACHMENTS
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.
Gerri Faircloth, Procurement Manager
ADDENDUM ACKNOWLEDGMENT FORM
VENDOR NAME: _____________________________________________________
VENDOR FEID#: _____________________________________________________
ADDRESS: ___________________________________________________________
CITY/STATE: ________________________________________________________
PHONE #: ___________________________________________________________
FAX #: _______________________________________________________________
E-MAIL: _____________________________________________________________
AUTHORIZED SIGNATURE: __________________________________________
TITLE: ______________________________________________________________
Southeastern Surveying and Mapping Corporation
59-1621976
6500 All American Boulevard
Orlando, Florida 32810
(407) 292-8580 Ext. 2211
(407) 522-0901 gkrick@southeasternsurveying.com
ATTACHMENT A
SUBMIT SOQ TO:
FLORIDA FISH AND WILDLIFE CONSERVATION
COMMISSION
PURCHASING OFFICE, SUITE 100
2590 Executive Center Circle
TALLAHASSEE, FLORIDA 32301
PHONE: (850) 488-3427
REQUEST FOR
STATEMENTS OF QUALIFICATIONS (RFSOQ)
CONTRACTUAL SERVICES
ACKNOWLEDGEMENT FORM
SOQs WILL BE OPENED AT April 20, 2015 @ 2:30 PM EST
AND MAY NOT BE WITHDRAWN WITHIN 90 DAYS AFTER SUCH DATE AND TIME.
SOLICITATION NO.
FWC 14/15-37
RFSOQ TITLE: Professional Services Continuing Contract
CONSULTANT NAME: REASON FOR NOT SUBMITTING SOQ:
CONSULTANT MAILING ADDRESS:
CITY – STATE – ZIP CODE:
AREA CODE/TELEPHONE NUMBER:
AREA CODE/FAX NUMBER: FEID NUMBER:
I certify that this SOQ is submitted without prior understanding, agreement, or connection with any corporation, firm, or person submitting a response for the same professional services, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this SOQ and certify that I am authorized to sign this acknowledgement for the respondent.
AUTHORIZED SIGNATURE (MANUAL) AUTHORIZED SIGNATURE (TYPED) TITLE
A Request for Statements of Qualifications (RFSOQ) is the first step in the process for selecting a contractor(s) for a specific project or group of similar projects. Following determination and ranking of the best qualified firms, no less than the top three firms may be requested to submit proposals for the specific project(s) and/or will be requested to participate in oral discussions.
GENERAL CONDITIONS
SEALED RESPONSE: All SOQ sheets and this form must be executed and submitted in a sealed envelope. The face of the envelope shall contain, in addition to the address, the date and time of the opening and the solicitation number.
All SOQs are subject to the conditions specified herein. Those which do not comply with these conditions are subject to rejection.
1. EXECUTION OF SOQ: SOQs must contain a manual signature of the authorized representative in the space provided above. The SOQ must be typed.
2. NO RESPONSE SUBMITTED: If not submitting a response, return only this acknowledgement form, and explain the reason in the space provided above. Failure to respond three times in succession without justification shall be cause for removal of the firm's name from the mailing list without further notice.
Southeastern Surveying and Mapping Corporation
6500 All American Boulevard
Orlando, Florida 32810
(407) 292-8580 Ext. 2211
(407) 522-0901 59-1621976
Gary B. Krick, PSM President
ATTACHMENT A
3. SOQ OPENING: The opening shall be public, on the date, location and the time specified on the acknowledgement form. It's the responder's responsibility to assure that his SOQ is delivered at the proper time and place of opening. SOQs which for any reason are not so delivered, will not be considered. Offers by telegram, telephone or facsimile are not acceptable. A SOQ may not be altered after opening.
4. INTERPRETATIONS: Any questions concerning conditions and specifications shall be directed in writing to this office for receipt no later than ten (10) days prior to the opening. Inquiries must reference the date of opening and the solicitation number. No interpretation shall be considered binding unless provided in writing by the Department of Environmental Protection Contracts Office.
5. CONFLICT OF INTEREST: This process is subject to the provisions of Chapter 112, Florida Statutes.
Responders must disclose with their SOQ the name of any officer, director, or agent who is also an employee of the State of Florida, or any of its agencies. Further, all responders must disclose the name of any State employee who owns, directly or indirectly, an interest of five percent (5%) or more in the proposer's firm or any of its branches. In accordance with Chapter 287, Florida Statutes, no person or firm receiving a contract that has not been procured pursuant to Section 287.057(1), (2) or (3) to perform a feasibility study of the potential implementation of a subsequent contract, participating in the drafting of an invitation to bid or request for proposals, or developing a program for future implementation shall be eligible to contract with the agency for any other contracts dealing with the specific subject matter; nor shall any firm in which such person has any interest be eligible to receive such a contract. Responders must disclose with their response any such conflict of interest.
6. AWARDS: See special conditions contained in the RFSOQ.
7. DISPUTES: Any actual or prospective responder who disputes the reasonableness, necessity or competitiveness of the terms and conditions of this RFSOQ, selections, or award recommendation shall file such protest in accordance with Section 120.57(3), Florida Statutes, and applicable agency rules. Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, shall constitute a waiver of proceedings.
8. LEGAL REQUIREMENTS: Applicable provisions of all federal, state, county or local laws, and of all ordinances, rules and regulations shall govern development, submittal and evaluation of all SOQs received in response hereto and shall govern any and all claims and disputes which may arise between person(s) submitting an SOQ hereto and the State of Florida, by and through its officers, employees and authorized representatives, or any other person, natural or otherwise, and lack of knowledge by any proposer shall not constitute a cognizable defense against the legal effect thereof.
9. PUBLIC ENTITY CRIMES: A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, F.S., for Category Two, for a period of 36 months from the date of being placed on the convicted vendor list.
10. DISCRIMINATORY VENDOR LIST: An entity or affiliate who has been placed on the discriminatory vendor list may not submit a bid on a contract to provide goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, many not submit bids on leases of real property to a public entity, may not award or perform work as a contractor, supplier, subcontractor or consultant under contract with any public entity, and may not transact business with any public entity. The Florida Department of Management Services is responsible for maintaining the discriminatory vendor list and intends to post the list on its website. Questions regarding the discriminatory vendor list may be directed to the Florida Department of Management Services, Office of Supplier Diversity at 850/487-0915.
NOTE: ANY AND ALL SPECIAL CONDITIONS AND SPECIFICATIONS ATTACHED HERETO WHICH VARY
FROM THESE GENERAL CONDITIONS SHALL HAVE PRECEDENCE.
FWC FORM RFSOQ-A (Rev. 9/01)
Conservation Commission
Commissioners
Richard A. Corbett
Chairman
Tampa
Brian Yablonski
Vice Chairman
Tallahassee
Ronald M. Bergeron
Fort Lauderdale
Richard Hanas
Oviedo
Aliese P. “Liesa” Priddy
Immokalee
Bo Rivard
Panama City
Charles W. Roberts III
Tallahassee
Executive Staff
Nick Wiley
Executive Director
Eric Sutton
Assistant Executive Director well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: (850) 488-4676
Hearing/speech-impaired:
(800) 955-8771 (T)
(800) 955-8770 (V)
MyFWC.com
Finance and Budget Office
Jodi Bailey
Chief Operating Officer
(850) 488-6551
(850) 922-8060 FAX
DATE: APRIL 14, 2015
ADDENDUM NO.: 5
BID NO.: FWC 14/15-37
BID TITLE: REGIONAL PROFESSIONAL SERVICES
UPDATE: QUESTIONS & ANSWERS
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents during the ITB period an addendum shall be issued. An Addendum Acknowledgment Form shall be signed by an authorized vendor representative, dated, and returned to the Commission prior to the opening date and time specified in the Calendar of Events.
Gerri Faircloth, Procurement Manager
ADDENDUM ACKNOWLEDGMENT FORM
VENDOR NAME: _____________________________________________________
VENDOR FEID#: _____________________________________________________
ADDRESS: ___________________________________________________________
CITY/STATE: ________________________________________________________
PHONE #: ___________________________________________________________
FAX #: _______________________________________________________________
E-MAIL: _____________________________________________________________
AUTHORIZED SIGNATURE: __________________________________________
TITLE: ______________________________________________________________President Gary B. Krick, PSM gkrick@southeasternsurveying.com
(407) 522-0901
(407) 292-8580 Ext. 2211
Orlando, Florida 32810
6500 All American Boulevard
59-1621976
Southeastern Surveying and Mapping Corporation
SECTION 5.1
ARCHITECT - ENGINEER QUALIFICATIONS
PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Florida Fish and Wildlife Conservation Commission (Tallahassee, Florida)
2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
March 31, 2015 RFSOQ No. FWC 14/15-37
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Gary B. Krick, PSM / President/Project Manager
5. NAME OF FIRM
Southeastern Surveying and Mapping Corporation
6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
(407) 292-8580 Ext. 2211 (407) 292-0140 gkrick@southeasternsurveying.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
PR
IM
E
J- V
PA
R
TN
ER
SU
BC
O N
TR
AC
TO
R
9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
a.
Southeastern Surveying and Mapping Corporation
CHECK IF BRANCH OFFICE
6500 All American Boulevard Orlando, FL 32810
Prime Consultant b.
Southeastern Surveying and Mapping Corporation
CHECK IF BRANCH OFFICE
1130 Highway 90 Chipley, Florida 32428
Prime Consultant c.
Southeastern Surveying and Mapping Corporation
CHECK IF BRANCH OFFICE
Cypress Business Center 8301 Cypress Plaza Drive, Suite 104 Jacksonville, Florida 32256
Prime Consultant d.
Southeastern Surveying and Mapping Corporation
CHECK IF BRANCH OFFICE
University Corporate Park 10770 North 46th Street, Suite C300 Tampa, Florida 33617
Prime Consultant e.
CHECK IF BRANCH OFFICE
f.
CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) PAGE 1
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
STANDARD FORM 330 (6/2004) PAGE 1D
Project Surveyor Steve L. Anderson, Jr., PSM Michael L. Dougherty, PSM
Bruce C. Ducker, PSM James M. Dunn, II, PSM
Ronnie Figueroa, PSM, GISP Timothy O. Mosby, PSM
Business Development Coordinator
Russell G. Daly, PSM
Project Assistant David M. Rentfrow, CST IV
Field Team Technicians Jaret W. Auld Aaron G. Bell
Austen T. Barfield Kevin J. Bell, CST I
Richard Blackmon, CST II Steven C. Borden Charles A. Bowker
Paul B. Bowker, CST III Jim O. Bozarth
James L. Bratcher Nathan K. Breter, CST I
Christopher Bryan, CST II Steven J. Carp
Arrington C. Carter Christopher N. Chambers
Alex Chan Stephen L. Chastain
Thomas J. Collins Lee M. Connell
Joseph E. Cutting Dylan M. Davidson
James C. Dismuke, II, CST I Ellis P. Dockery
John S. Drury, CST III Sawanuka Drury Wade N. Dickens
Dail D. Dybdal Trahern D. Eggen Joshua A. Fitcher
David N. Gale Curtis J. Garvin, CST I
Daniel J. Gonzalez Phillip R. Griffin Tony E. Hagan
Shane A. Hendershot Daniel J. Henry, PSM, PLS
Frank B. Henry, CST IV Robert L. Hicks, CST I
Samuel S. Hodges, CST I Howard S. Hollis Miken C. Hooks
Ronald J. Hutson
Field Team Managers Thomas F. Ferguson, PSM
Mark W. Klaers, CST III Josh M. Morris
Project Managers Raymondjames Hicks, GPRT
M. Scott Sowards, GPRT Christopher Taylor, GPRT
Utility Coordinator Dawn Knight, GPRT
Field Team Technicians Pervin Adkins, GPRT Jon M. Arnett, GPRT
Grazio E. Blevins, GPRT Branden A. Briley
Kevin W. Calhoun, GPRT Joseph R. Cartagena
Joshua A. Carp Ian A. Cross
Miguel A. Gonzalez James Hackworth, GPRT
Monacarlo V. Ingram, GPRT Jeffery P. Jones, GPRT Christopher S. Maggard Eric M. Mulroney, GPRT James D. Murphy, GPRT
Colby K. Pierce John K. Rigdon
John D. Simpson, GPRT Cody W. Syfrett
Ronald A Thigpen Ted L. Truchan, GPRT
Division Manager Darryll E. DeMarsh, GPRT
Project Managers/Project Surveyors Gary B. Krick, PSM
James L. Petersen, PSM Thomas K. Mead, PSM Tony G. Syfrett, PSM
Robert W. Gardner, PSM John S. Thomas, PSM Charles M. Arnett, PSM
Edward W. Wackerman, PLS
Human Resource Manager Debra J. Leise
Account Payable Kelly Kockelman
Accounts Receivable Kelli S. Taylor
Marketing Manager Heather M. Krick
Contracts/Risk Manager Rebecca G. Bess, Esq.
Records/Research Donna L. Walter
Administrative Assistants Katrina M. Blevins
Steve C. Brown, CST I Merissa A. Erickson
Tammy L. Hicks Kathy E. Morris
Tina L. Via Receptionist
Georgia A. Connell Comptroller
William S. Snarski
GIS DIVISION
CAD Manager William C. Rowe, PSM
Division Manager Brian R. Garvey, PE
Technicians Scott M. Evans, CST I
James M. Hardee, CST II Brian E. Latchaw
Robert C. Loucks, CST II Alex D. Marrero
David A. Santiago Thomas Young Jr., SIT, GISP
Senior Analysts Cathy E. Galgano, GISP Cheryl A. Isenberg, GISP Patrick J. Phillips, GISP
CAD Technicians John M. Ballard, II
Eric E. Cain Charlie R. Corbitt
Brooks M. Davis, CST I Joey D. Finch
Tate B. Flowers, PLS James L. Gilbert John W. Gray, Jr.
Douglas B. McInnis, CST III Randolph C. Rain
Dana S. Sowers, CST I James A. Williams, CST I
Senior CAD Technicians Matthew G. Jennings, RLS Ryan E. Johnson, CST II
Holland J. Kent, CST I Gregory M. Kime
Brad J. Lashley, PSM Joseph S. Locklin, CST III
Brad E. Nelson Eddie E. Richardson, PSM
Luis A. Santana Celeste van Gelder, CST IV
Senior Survey Technicians Myron F. Lucas, PSM
James E. Mazurak, PSM Stephen K. Ray, SIT
Michael J. Stewart SIT
Assistant Project Engineers Kirk R. Hall, EI, CST I, GISP Bradford A. Stroppel, EI, GISP
Legend:
PLS: Professional Land Surveyor PSM: Professional Surveyor & Mapper RLS: Registered Land Surveyor (GA) PE: Professional Engineer EI: Engineering Intern SIT: Surveyor in Training (Florida)
(qualified to sit for the State Exam) GIS: Geographic Information System (GIS)
Professionals (GISP) GPRT: Ground Penetrating Radar Trained GPS: Global Positioning System Esq.: Esquire
Network Administrators William N. Clark Richard T. Nguy
UTILITY DIVISION
Senior Utility Coordinator Pamela A. Young
Assistant CAD Coordinator Steven D. Smith CST IV
CAD Coordinator Donna L. Canney, CST IV
Utility Field Supervisor Christopher M. Schultz, GPRT
Field Team Technicians Jeffery M. Ivans, CST I
Logan L. Jennings David G. Johnson Bernard V. Keith James A. Lane
Jonathan L. Lipford Benjamin W. Locke
Richard D. Locklin, CST I Corri S. Maloy Phillip L. Mars
Carlos J. Martin Nicholas E. Mazurak
Anita G. Metzger Delious R. Massaline Zachary T. Mitchell
Austin J. Montgomery Chad J. Morrin Josh M. Morris
Scott A. Morris, CST III Samuel P. Orem
William Pearce, Jr., CST III Kenney E. Pearson
Curtis R. Peters Dustin M. Purdee
Kevin M. Robinson, CST I Trenton J. Rolling
Larry J. Romano, CST I Ryan A. Rose
Kevin M. Ruehl, CST III Wesley T. Scholl Bradley E. Sisler
Michael K. Sisler, CST III Jacob L. Stewart
Andrew R. Strickland Jeremy A. Thomas David L. Thompkins
Raymond J. Tondorf, CST I Juan R. Torres
Kenneth Umphreys, CST II Michael D. Vetter
Edward F. Wolfrey, CST I Christopher M. Woodward
John D. York, CST I
GPS Coordinators Julio C. Rivera, CST III Scott F. Stewart, SIT
CAD DIVISION
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Gary B. Krick, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM
42 42
15. FIRM NAME AND LOCATION (City and State)
Southeastern Surveying and Mapping Corporation (Orlando, Florida)
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Valencia Community College Trimble GPS Surveying Training Center, San Jose, CA Continuing Education including yearly seminars for licensing requirements
Professional Surveyor and Mapper (Florida) #LS4245 (1986)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Former Board Member of the Florida Department of Agriculture and Consumer Services Board of Professional Surveyors and Mappers, Florida Surveying and Mapping Society; Central Florida Chapter and Volusia County Chapters of the Florida Surveying and Mapping Society; National Society of Professional Surveyors and Mappers; Florida Utility Coordinating Committee; American Public Works Assoc.;
FL GPS Users Group; Common Ground Alliance
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiwa Springs State Park Boundary/Management Lines Survey Apopka, Orange County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC prepared a Boundary Survey of the referenced boundary lines, showing boundary conflicts such as encroachments, mowing, etc.; set standard galvanized posts at each angle point and post the lines with green metal "T-posts" at 150 foot intervals or blazing trees if there are adequate trees, and showed the State Plane Coordinates and latitude/longitude for each corner. Photographs were taken of the completed management lines and added to the digital files.(3,313 LF) SSMC Project Cost - $ 7,755.51 Project Role - Project Manager/Project Surveyor b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Tomoka State Park Volusia County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed a Specific Purpose Survey that included Boundary Line Identification. The scope consisted of traversing the subject boundary lines based on the Boundary Survey prepared by Sliger & Associates, dated 05/17/1991 that was furnished by the client, recovering monumentation and holding this monumentation for the line maintenance survey. The line was posted; boundary conflicts such as encroachments, mowing, etc. were located and shown; standard galvanized posts were set at each angle point and at 200 foot intervals along the line, photos of the complete management lines were taken. (10,000 LF) SSMC Project Cost - $ 22,646.94 Project Role - Project Manager/Project Surveyor c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiva River Basin State Parks - Neighborhood Lakes Lake County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed Specific Purpose Survey-Management Line Survey: Traversed the subject boundary lines, tied monumentation and held monumentation for the line maintenance; prepared a Specific Purpose Survey of the reference and identified parcel, showed boundary conflicts; set standard galvanized posts at each angle point and post the lines with green metal "T-posts" at 150' intervals or blazing trees if there are adequate trees; Photographs were taken of the complete management lines and added to the digital files; Each boundary corner was referenced showed the State Plane Coordinates and latitude/longitude.
SSMC Project Cost - $ 11,751.09 Project Role - Project Manager/Project Surveyor d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: Lake Hart, Lake Mary Jane, Lake Ajay & Lake Hatchineha Orange and Osceola Counties, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
SSMC performed Hydrographic Surveys to include: Lake depths and elevations using a Digital Sonar Fathometer linked to a GPS receiver resulting in an x, y, and z position for each sounding.
SSMC Project Cost - $104,818.00 Project Role - Project Manager/Project Surveyor e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: 2011 Restoration Science Department Aerial Imagery 10 Florida Counties
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed Static Airborne GPS and Static GPS for Aerial Targets for Vegetation Mapping of Various SFWMD Areas in Broward, Osceola, Polk, Okeechobee, Highlands, Martin, Palm Beach, Glades, Hendry and Miami Dade Counties SSMC Project Cost - $ 248,154.80 Project Role - Project Manager/Project Surveyor
STANDARD FORM 330 (6/2004) PAGE 2
James L. Petersen, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM
37 34
15. FIRM NAME AND LOCATION (City and State)
Southeastern Surveying and Mapping Corporation (Orlando, Florida)
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Seminole Community College Continuing Education including yearly seminars for licensing requirements
Professional Surveyor and Mapper (Florida) #LS4791 (1990)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Florida Surveying and Mapping Society; Central Florida Chapter of the Florida Surveying and Mapping Society; National Society of Professional Surveyors; Florida Utilities Coordination Committee; Florida GPS Users Group; University of Florida Geomatics Program Advisory Committee
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiwa Springs State Park Boundary/Management Lines Survey Apopka, Orange County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC prepared a Boundary Survey of the referenced boundary lines, showing boundary conflicts such as encroachments, mowing, etc.; set standard galvanized posts at each angle point and port the lines with green metal "T-posts" at 150 foot intervals or blazing if there are adequate trees, and showed the State Plane Coordinates and latitude/longitude for each corner.
Photographs were taken of the completed management lines and added to the digital files.(3,313 LF) SSMC Project Cost - $ 7,755.51 Project Role - Project Manager/Project Surveyor b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Tomoka State Park Volusia County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed a Specific Purpose Survey that included Boundary Line Identification. The scope consisted of traversing the subject boundary lines based on the Boundary Survey prepared by Sliger & Associates, dated 05/17/1991 that was furnished by the client, recovering monumentation and holding this monumentation for the line maintenance survey. The line was posted; boundary conflicts such as encroachments, mowing, etc. were located and shown; standard galvanized posts were set at each angle point and at 200 foot intervals along the line, photos of the complete management lines were taken. (10,000 LF) SSMC Project Cost - $ 22,646.94 Project Role - Project Manager/Project Surveyor c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Wekiva River Basin State Parks - Neighborhood Lakes Lake County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed Specific Purpose Survey-Management Line Survey: Traversed the subject boundary lines, tied monumentation and held monumentation for the line maintenance; prepared a Specific Purpose Survey of the reference and identified parcel, showed boundary conflicts; set standard galvanized posts at each angle point and post the lines with green metal "T-posts" at 150' intervals or blazing if there are adequate trees; Photographs were taken of the complete management lines and added to the digital files; Each boundary corner was referenced showed the State Plane Coordinates and latitude/longitude.
SSMC Project Cost - $ 11,751.09 Project Role - Project Manager/Project Surveyor d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: Lake Hart, Lake Mary Jane, Lake Ajay & Lake Hatchineha Orange and Osceola Counties, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
SSMC performed Hydrographic Surveys to include: Lake depths and elevations using a Digital Sonar Fathometer linked to a GPS receiver resulting in an x, y, and z position for each sounding.
SSMC Project Cost - $104,818.00 Project Role - Project Manager/Project Surveyor e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SFWMD: 2011 Restoration Science Department Aerial Imagery 10 Florida Counties
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed Static Airborne GPS and Static GPS for Aerial Targets for Vegetation Mapping of Various SFWMD Areas in Broward, Osceola, Polk, Okeechobee, Highlands, Martin, Palm Beach, Glades, Hendry and Miami Dade Counties.
SSMC Project Cost - $ 248,154.80 Project Role - Project Manager/Project Surveyor
STANDARD FORM 330 (6/2004) PAGE 3
Thomas K. Mead, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM
30 26
15. FIRM NAME AND LOCATION (City and State)
Southeastern Surveying and Mapping Corporation (Chipley, Florida)
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Valencia Community College GPS Training Course, Geoplane Continuing Education for Licensing Requirements
Professional Land Surveyor (Alabama) # 32373-S Professional Surveyor and Mapper (Florida) # LS5624
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Member of Alabama Society of Professional Land Surveyors, Member of North Florida Chapter of the Florida Surveying and Mapping Society, Florida Chapter of the Urban and Regional Information Systems Assoc., Florida GPS Users Group, and the Chipola Jr. College Surveying & Mapping Advisory Committee. Chipola Work Force Board Junior Achievement Instructor.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Apalachicola Wildlife Management Area-Site #1 Gulf County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC cut and staked approximately 1.6 miles of boundary line, and set lathes at 200' intervals. The historic boundary survey of the tract was provided by O'Neal Surveying and Mapping, Inc.
SSMC Project Cost - $ 6,500.00 Project Role - Project Manager/Project Surveyor b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: L. Kirk Edwards Wildlife and Environmental Area Leon County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC located Horizontal and Vertical Control at two sites as directed by personnel from O'Neal Surveying & Mapping Corporation.
SSMC Project Cost - $ 1,000.00 Project Role - Project Manager/Project Surveyor c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Florida Caverns State Park Marianna, Jackson County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC provided all research of existing horizontal and vertical control in project area to support new project control, and established a minimum of two (2) new horizontal and vertical control points at Visitor's Parking Lot. Horizontal position in Florida North Zone State Plain Coordinates and Vertical positions in NAVD 88 datum.
Field services were performed to verify and adjust all control data.
SSMC Project Cost - $ 650.00 Project Role - Project Manager/Project Surveyor d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Florida’s First Magnitude Springs - Brunson Landings Tract Washington County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed a Boundary Survey: established boundary corners and reset any missing corners, remove encroachments, proved each position and found or set all section and quarter section corners, located above ground improvements to include fences, roads, utilities and usages if existing, prepared descriptions/sketches reflective of boundary line changes for each adjoiner, prepared new descriptions/sketches for the Plum Creek Timber Company, Inc. acquisition and reflected on the final drawing.
SSMC Project Cost - $ 34,243.55 Project Role - Project Manager/Project Surveyor e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Falling Waters State Park Washington County, Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed a Boundary Survey for the original boundary of Falling Waters State Park, Set Galvanized metal fence posts 1' inside the property at each property corner and on the property line every 200'. (148 ac) SSMC Project Cost - $23,159.55 Project Role - Project Manager/Project Surveyor
STANDARD FORM 330 (6/2004) PAGE 4
Tony G. Syfrett, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM
28 8
15. FIRM NAME AND LOCATION (City and State)
Southeastern Surveying and Mapping Corporation (Chipley, Florida)
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Continuing Education for Licensing Requirements Professional Land Surveyor (Alabama) # 32378-S
Professional Surveyor and Mapper (Florida) # LS5943
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Member of Alabama Society of Professional Land Surveyors, President of the Chipola Chapter of the Florida Surveying and Mapping Society, Member of the North Florida Chapter of the Florida Surveying and Mapping Society
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Apalachicola Wildlife Management Area-Site #1 Gulf County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC cut and staked approximately 1.6 miles of boundary line, and set lathes at 200' intervals. The historic boundary survey of tract was provided by O'Neal Surveying and Mapping, Inc.
SSMC Project Cost - $ 6,500.00 Project Role - Project Manager/Project Surveyor b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: L. Kirk Edwards Wildlife and Environmental Area Leon County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC located Horizontal and Vertical Control at two sites as directed by personnel from O'Neal Surveying & Mapping Corporation.
SSMC Project Cost - $ 1,000.00 Project Role - Project Manager/Project Surveyor c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Florida Caverns State Park Marianna, Jackson County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC provided all research of existing horizontal and vertical control in project area to support new project control, and established a minimum of two (2) new horizontal and vertical control points at the Visitor's Parking Lot using GPS. Horizontal position is relative to Florida North Zone State Plain Coordinates and Vertical positions are relative to NAVD 88 datum. Field services were performed to verify and adjust all control data.
SSMC Project Cost - $ 650.00 Project Role - Project Manager/Project Surveyor d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Florida’s First Magnitude Springs - Brunson Landings Tract Washington County, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed Boundary Survey: established boundary corners and reset any missing corners, remove encroachments, proved each position and find/set all section and quarter section corners, located above ground improvements to include fences, roads, utilities and usages if existing, prepared descriptions/sketches reflective of boundary line changes for each adjoiner, prepared new descriptions/sketches for Plum Creek Timber Company, Inc. acquisition and reflect on final drawing. (280 ac.)
SSMC Project Cost - $ 34,243.55 Project Role - Project Manager/Project Surveyor e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Falling Waters State Park Washington County, Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed a Boundary Survey for the original boundary of Falling Waters State Park, Set Galvanized metal fence posts 1' inside the property at each property corner and on the property line every 200'. (148 ac) SSMC Project Cost - $23,159.55 Project Role - Project Manager/Project Surveyor
STANDARD FORM 330 (6/2004) PAGE 5
Robert W. Gardner, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM
38 6
15. FIRM NAME AND LOCATION (City and State) Southeastern Surveying and Mapping Corporation (Jacksonville, Florida)
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Cleveland State University - Major Civil Engineering (1979) Defense Mapping School - Construction Surveying, Virginia (1977)
Professional Surveyor and Mapper (Florida) # LS5603 (1996)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Florida Crown Chapter of the Florida Surveying and Mapping Society, Florida Surveying and Mapping Society, National Society of Professional Surveyors, U. S. Green Building Council, American Society of Highway Engineers (Northeast Section), Society of American Military Engineers, Associated Builders and Contractors, Inc.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Homosassa Springs Wildlife State Park Homosassa, Citrus County, Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC provided research of existing horizontal and vertical control in the project area to support new project control, and established a minimum of three (3) new horizontal and vertical control points using GPS. Horizontal values are relative to Florida North Zone State Plane Coordinates and vertical values are relative to NAVD 88 datum. Field services were performed to verify and adjust all control data.
SSMC Project Cost - $ 1,000.00 Project Role - Project Manager/Project Surveyor b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FWC: Paynes Prairie Preserve State Park-FWC Lab Micanopy, Alachua County, Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC set (2) Control Points, Horizontal and Vertical using GPS for the Paynes Prairie Preserve State Park as a Sub-Consultant to O'Neal Surveying & Mapping Corporation.
SSMC Project Cost - $ 550.00 Project Role - Project Manager/Project Surveyor c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FDEP: Suwannee River State Park Suwannee County, Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC found and recovered (2) existing monitoring wells, located (9) soil locations along the boundaries of the sink holes; and re-established benchmarks near the site. The services were performed in the area of assessment activities conducted by the Client (Ecology and Environment) and FDEP.
SSMC Project Cost - $ 1,680.00 Project Role - Project Manager/Project Surveyor d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SRWMD: Osceola Land and Timber/Santa Fe River Ranch Addition Alachua County, Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed Boundary Survey: Osceola Land & Timber/Santa Fe River Ranch Addition (463 ac.)
SSMC Project Cost - $ 14,550.00 Project Role - Project Manager/Project Surveyor e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SRWMD: Madison Taylor Timberlands, LLC/ Aucilla Corridor Addition Madison & Jefferson Counties, Florida
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
For this project SSMC performed a Boundary Survey and GPS Survey for Madison Taylor Timberlands, LLC Aucilla Corridor Addition Project. (1,257 ac.)
SSMC Project Cost - $13,500.00 Project Role - Project Manager/Project Surveyor
STANDARD FORM 330 (6/2004) PAGE 6
John S. Thomas, PSM Project Manager/Project Surveyor a. TOTAL b. WITH CURRENT FIRM
27 4
15. FIRM NAME AND LOCATION (City and State)
Southeastern Surveying and Mapping Corporation (Jacksonville, Florida)
16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .