This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving TransCore Holdings, Inc. as the consultant. The contract is specifically designated as Task Work Order No. 1 under Contract No. H9057, dated September 23, 2022, with a completion date of September 30, 2023.

The task order authorizes TransCore to provide emergency support for Florida's Intelligent Transportation Systems (ITS) Operations Network, with compensation structured as a lump sum and hourly rate contract. The total authorized amount is $198,090.82, with billing rates set at $145/hour for a Microwave Maintenance Project Manager and $90/hour for a Microwave Maintenance Field Technician. Additional specific tasks include performing site inspections in Hurricane Ian's affected areas, documenting damage, providing on-demand system maintenance support, and completing targeted repairs such as fixing a DC power converter system at Edgewater and tower obstruction lighting systems at Mims and US1 Weigh Station towers. The compensation includes various lump sum payments for specific site inspections and maintenance activities across multiple Florida locations, totaling approximately $194,792.50 across different service elements.

View the file

Other files

File Type Posted
CN-550000-H9057-00020000.pdf PDF
CN-550000-CA649-00120000.pdf PDF
CN-550000-H9057-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

9/30/2023

*Limiting or Estimating/Budgeted Amount.

Distribution:

Task Work Order No.:

Contract No.: Payment FM No.:

H9057

(name) (title) Signature

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

(LA5) Actual expenses or at billing rates in Table 6

(LA5) Actual expenses or at billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

Microwave Maintenance Project Manager

TransCore Holdings, Inc.

2416 Lake Orange Dr., Suite 100, Orlando, FL 32837

FEID#: F943198006

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$198,090.82

$145.00/HR Limit

Microwave Maintenance Field Technician $90.00/HR Limit

In connection with Emergency Support of Florida ITS Operations Network.

Signature

$0.00

$198,090.82

(name) (title)

$198,090.82

Billing rates approved: Project Manager $145/HR, Field Technician $90.00/HR

Total authorizations to date (including this one):

Departmental Approval:

Consultant Acceptance:

9/23/2022

Kenneth Shiver ITS Communication Administrator

DocuSign Envelope ID: 0983CF7C-5685-4F31-9D68-6D4C8BB8D71A

Vice PresidentJonathan Tursky

375-030-25

PROCUREMENT

08/21

(LS1) Lump sum paid at completion $67.50 Estimate

Balboa (LS1) Lump sum paid at completion $67.50 Estimate

Aspalaga

Total: $3,298.50

D4 HQ

D6 HQ

(LS1) Lump sum paid at completion $135.00

(LS1) Lump sum paid at completion $67.50

Delray Beach

Dundee

Dushaine

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $202.50

(LS1) Lump sum paid at completion $112.50

Crestview FHP

DeFuniak Springs

Deland

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $67.50

Chinsegut Hill (LS1) Lump sum paid at completion $67.50

Chipley (LS1) Lump sum paid at completion $67.50

Coral Reef

CR-318

(LS1) Lump sum paid at completion $135.00

(LS1) Lump sum paid at completion $135.00

Clermont (LS1) Lump sum paid at completion $67.50

Cocoa FHP (LS1) Lump sum paid at completion $22.50

(LS1) Lump sum paid at completion $90.00

Collier County Rest Area

Chiefland FDOT

(LS1) Lump sum paid at completion $67.50 Estimate

(LS1) Lump sum paid at completion $225.00 Estimate

Chiefland Foresty (LS1) Lump sum paid at completion $31.50 Estimate

Broward Ops

Canoe Creek

(LS1) Lump sum paid at completion $202.50

(LS1) Lump sum paid at completion $135.00

(LS1) Lump sum paid at completion $67.50

Caryville

$135.00

(LS1) Lump sum paid at completion $319.50

(LS1) Lump sum paid at completion $67.50

Estimate

Estimate

Estimate

Brooksville

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Element Description

Compensation elements are as follows:

Method of Compensation Amount Estimate/Limit

Estimate

Estimate

Estimate

(LS1) Lump sum paid at completion

79th St. Causeway - inspect (LS1) Lump sum paid at completion $112.50 Estimate

Baldwin (LS1) Lump sum paid at completion $112.50

90th Avenue - inspect

Andytown

(LS1) Lump sum paid at completion $180.00

$135.00

Estimate

Estimate

Estimate

Bayshore - cracks in dish antennas radomes

Big Pine Key

Brevard County Line - Damage to AT&T cable ladder mangled

(LS1) Lump sum paid at completion

375-030-25

PROCUREMENT

08/21

(LS1) Lump sum paid at completion $225.00 Estimate

(LS1) Lump sum paid at completion $945.00 Estimate

Gopher Ridge - Manual start up and shutdown of generator

Mims - Northeast side marker damaged

Monticello

Mossy Head

(LS1) Lump sum paid at completion $1,847.40

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $67.50

Miccosukee

Miles City

Milton

(LS1) Lump sum paid at completion $247.50

(LS1) Lump sum paid at completion $225.00

(LS1) Lump sum paid at completion $67.50

Marianna

McArthur HUB

McArthur Interchange

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $22.50

(LS1) Lump sum paid at completion $67.50

Kenansville

Lake City DOT

Madison FHP

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $202.50

(LS1) Lump sum paid at completion $67.50

Jessamine - Pier foundation damaged

June Park

Jupiter

(LS1) Lump sum paid at completion $247.50

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $67.50

Estimate

Estimate

Estimate Indrio Road

Jacaranda - Floor tiles swollen

Jacksonville FHP

(LS1) Lump sum paid at completion $45.00

(LS1) Lump sum paid at completion $292.50

(LS1) Lump sum paid at completion $202.50

Estimate

Holt

Estimate

Fort Pierce Interchange (LS1) Lump sum paid at completion $45.00 Estimate

Greenville (LS1) Lump sum paid at completion

Edgewater - Shelter interior underwater 14" (LS1) Lump sum paid at completion $427.50 Estimate

Estero - South main dish misaligned, LMR antenna leading

(LS1) Lump sum paid at completion $315.00 Estimate

Everglades Academy (LS1) Lump sum paid at completion $139.50 Estimate

$67.50

Fort Pierce Maintenance (LS1) Lump sum paid at completion $45.00 Estimate

Fruitville - Safety climb tangled up in LMR antenna system

D7 HQ

Compensation elements are as follows:

Method of Compensation Amount Estimate/Limit

(LS1) Lump sum paid at completion $67.50 Estimate

Falmouth (LS1) Lump sum paid at completion $135.00 Estimate

Element Description

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Naples FHP (LS1) Lump sum paid at completion $225.00 Estimate

Total: $6,644.40

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

375-030-25

PROCUREMENT

08/21

Total: $4,792.50

(LS1) Lump sum paid at completion $292.50

Estimate

(LS1) Lump sum paid at completion $180.00 Estimate

Tampa Maintenance

Tea Table

Temple Terrace - Manual start/ shutdown of

Generator

(LS1) Lump sum paid at completion $45.00

(LS1) Lump sum paid at completion $202.50

St John's Rest Area - Manual start/ shutdown of

Generator

Stuart HUB

Tallahassee FHP

(LS1) Lump sum paid at completion $675.00

(LS1) Lump sum paid at completion $67.50

Snapper Creek (LS1) Lump sum paid at completion $45.00 Estimate

Ridgecrest

Ruskin

Saint Catherine - Support brackets 960 Mhz

Broken

(LS1) Lump sum paid at completion $292.50

(LS1) Lump sum paid at completion $247.50

(LS1) Lump sum paid at completion $180.00

Port Charlotte - Cracks in main dishes, south misaligned

Port Orange - Access road washed out

Quincy

(LS1) Lump sum paid at completion

(LS1) Lump sum paid at completion $67.50

SR-222

SR-6

Estimate

Estimate

Skyway Bridge

SR-136 (LS1) Lump sum paid at completion $202.50 Estimate

SR-16 (St. Augustine) (LS1) Lump sum paid at completion $247.50 Estimate

Estimate

(LS1) Lump sum paid at completion $202.50 Estimate

Sneads Weigh Station (LS1) Lump sum paid at completion $67.50 Estimate

(LS1) Lump sum paid at completion $157.50 Estimate

Sanderson- Manual start up and shutdown of generator

Sanlando Springs

Site X

(LS1) Lump sum paid at completion $405.00

(LS1) Lump sum paid at completion $90.00

(LS1) Lump sum paid at completion $67.50

$247.50

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $90.00

Panama City

Pensacola FHP

Pompano

(LS1) Lump sum paid at completion $67.50

(LS1) Lump sum paid at completion $112.50

(LS1) Lump sum paid at completion $67.50

$112.50

(LS1) Lump sum paid at completion $67.50

Orlando South

Orlando West

Ormond Beach

(LS1) Lump sum paid at completion $90.00

(LS1) Lump sum paid at completion $90.00

(LS1) Lump sum paid at completion $45.00

Estimate

Estimate

Estimate

Estimate

Compensation elements are as follows:

Estimate/Limit

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Estimate

Element Description

Ocala DOT

Okeechobee

Method of Compensation Amount

(LS1) Lump sum paid at completion

375-030-25

PROCUREMENT

08/21

Total: $183,355.42

Estimate

Yeehaw Junction (LS1) Lump sum paid at completion $67.50 Estimate

Yulee (LS1) Lump sum paid at completion $247.50 Estimate

Wilson Rd (LS1) Lump sum paid at completion $45.00

(LS1) Lump sum paid at completion $90.00 Estimate

Wildwood Turnpike (LS1) Lump sum paid at completion $225.00 Estimate

US41

West Palm Beach - MPT major alarm resolved by Waterleaf

Wildwood HUB

(LS1) Lump sum paid at completion $180.00

(LS1) Lump sum paid at completion $2,320.42 Estimate

Element Description

US 1 Weigh Station

Estimate

(LS1) Lump sum paid at completion $180.00 Estimate

Compensation elements are as follows:

Method of Compensation Amount Estimate/Limit

Emergency generators fuel and maintenance (LS1) Lump sum paid at completion $10,000.00 Estimate

ITS CCTV camera setup and repairs (LS1) Lump sum paid at completion $20,000.00 Estimate

ITS Communications trailer deployment and operations.

(LS1) Lump sum paid at completion $150,000.00 Estimate

375-030-25

PROCUREMENT

08/21

ADDITIONAL NOTES

Perform site inspections within Hurricane Ian's affected area. Note any obvious damage to antennas, tower, shelter, generator, fencing or compound.

Document any damage photographically and report to the FDOT.

Provide on-demand support for system maintenance as needs arise in response to the emergency situation.

Repair DC power converter system at Edgewater.

Repair tower obstruction lighting system at Mims and US1 Weigh Station towers.