This document is a Maintenance Contract Work Document issued by the State of Florida Department of Transportation, specifically Work Document No. 3 under Contract E4075-R1. The contract is with Whitelead Traffic Solutions, with a financial project number of 2339846720. The document was issued on 3/21/16, received on 3/16/16, with a work begin date of 4/5/16 and an original due date of 4/16/16.
The work document details roadway striping services for a specific location on SR 80 at mile post 7.194 at D Road at the D Canal. The contract includes several line items for striping work: Strip Solid (W) (6") at 330 linear feet (estimated), Arrows at 4 units, Strip Solid (Y) (8") at 340 linear feet, Strip Solid (Y) (18") at 575 linear feet, and Strip Skip (M) at 100 linear feet. The total work value is documented as $1,328.94. The contractor is required to begin work within 5 days of receiving the work order and complete the work within 21 days, with strict instructions not to exceed the estimated quantities or remaining money in the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-E5L29.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .