CN-550000-CAV61-00020000.pdf
PDF 558 KB Posted
- Contract number
- CAV61
- Issued by
- Florida
About this file
This is a Task Work Order (TWO) issued by the State of Florida Department of Transportation (FDOT) for Professional Services, specifically a Miscellaneous Task Work Order for Continuing Services in Landscape Architecture Design/Production. The primary consultant is WGI, Inc., located in West Palm Beach, Florida, with subconsultants including Goal Associates, Inc., Patel Greene and Associates, LLC, and RADISE International, LC. The contract number is CAV61, and the Financial Project Identification Number is 439828-1-32-01.
The task work order establishes requirements for non-project specific miscellaneous landscape architecture and engineering services to be performed on an as-needed basis, with a maximum limiting amount of $49,865.52. Services may include field inspections, meetings, cost estimates, project research, public involvement activities, graphic design, document reviews, field inventories, design work, landscape and irrigation planning, tree inventories, environmental studies, construction administration, and coordination with FDOT. The contract is set to run until 12/17/2029, with services to be provided on a maximum limiting basis. Compensation will be based on loaded billing rates, and progress reports must include FDOT authorization documentation for completed work being invoiced.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAV61.pdf | ||
| CN-550000-CAQ72-W0020000.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
12/17/2029
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
Transportation Division Leader
$49,865.52
$0.00
(name) (title)
Kimberlee DeBosier
$49,865.52
Total authorizations to date (including this one):
Departmental Approval:
$49,865.52 Limit non-project specificMiscellaneous Services
WGI, Inc.
2035 Vista Parkway, West Palm Beach, FL 33411
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$49,865.52
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
$49,865.52
(name) (title) Signature
Luciana Amato Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAV61 439828-1-32-01
Docusign Envelope ID: 6BDF4D09-44E5-4267-9F01-DAD5C9F0F4FB
03/17/2025 | 3:14 PM EDT
EXHIBIT “A”
SCOPE OF SERVICES
Miscellaneous Task Work Order
Project FM No.: 439828-1-32-01
WGI, Inc.
District 4 Continuing Services for Landscape Architecture Design/Production
Contract #CAV61
Task Work Order No. 1
1.0 PURPOSE
This Task Work Order establishes the requirements for the performance of non-project specific
Miscellaneous Services by WGI, Inc. (Consultant) under WGI’s Continuing Services Contract, #CAV61.
The scope of work involves providing Minor Miscellaneous Landscape Architecture and Engineering
Services which require immediate attention as requested or approved by the District Landscape Manager
(DLM). Professional services may be provided by both the Prime (WGI, Inc.) and Sub Consultants (Goal
Associates, Inc, Patel Greene and Associates, LLC, and RADISE International, LC.).
2.0 SCOPE OF SERVICES
At the request of the FDOT, the Consultant shall:
1. Attend miscellaneous field inspections or assessments;
2. Attend miscellaneous or non-project specific meetings;
3. Provide cost estimates;
4. Provide preliminary project research;
5. Provide public involvement activities;
6. Provide Graphic design, renderings, or presentations to be used in internal and/or public settings;
7. Provide document, plan, standards, or specification reviews;
8. Conduct field inventory and analysis;
9. Provide non-project specific design;
10. Prepare landscape, hardscape, and irrigation design and plans for minor projects;
11. Conduct tree inventory and prepare tree disposition plans;
12. Provide assessments of invasive species and provide selective clearing and grubbing guidance, plans and reports to protect desirable plant species;
13. Provide miscellaneous engineering tasks, design, calculations, or drawings;
14. Provide miscellaneous geotechnical services including soil sampling, testing, or borings;
15. Provide miscellaneous environmental studies or inspections;
16. Provide plan revisions or updates;
17. Provide miscellaneous construction administration including review of RFIs or shop drawings;
18. Provide coordination with FDOT and other agencies;
19. Provide miscellaneous landscape architecture tasks as directed by the District Landscape
Manager (DLM).
These activities may include teleconference calls, District Office meetings, and onsite inspections.
3.0 DELIVERABLES
1. Meeting minutes for miscellaneous meetings requested or approved by the DLM;
2. Copies of plans or plan revisions prepared under this Task Work Order;
3. Copies of exhibits, presentations, or graphics prepared;
4. Copies of reports prepared;
5. Plans or Documents with mark-ups, track-changes, or review comments provided;
6. Written inspection reports including photographs, when applicable;
7. Engineering plans, designs, or calculations;
8. Geotechnical reports;
9. Environmental assessments or reports.
4.0 CONSULTANT RESPONSIBILITIES
The Consultant’s responsibilities remain the same as in the Continuing Services Agreement and any
Supplemental Amendments to date shall remain the same.
5.0 DEPARTMENT RESPONSIBILITIES
The Department’s responsibilities remain the same as in the Continuing Services Agreement and any
Supplemental Amendments to date shall remain the same.
6.0 METHOD OF COMPENSATION
Services for this Task Work Order will be provided on Maximum Limiting. Progress reports wil include a copy of the FDOT authorization email and associated documentation with specific related details for completed work being invoiced.
Name of Consultant Project Information Sheet
Financial Project Identification Number: 439828-1-32-01 54321
Name of Prime / Subconsultant: WGI, Inc County: Various
Project Description: Misc TWO for Continuing Services for Landscape Architecture Design/Production
Begin Milepost: Miles
Number of Lanes: (Urban / Rural / Int.) Lane Configuration: (Divided / Undivided)
Project Type: Roadway Classification: (NHS/FIHS/Off Sys.)
CAP Level:
Design Variations:
Proposed Design Contract Time: months/days Date of Negotiation: Context Classification:
3. Project Common & Project General Tasks
4. Roadway Analysis
5. Roadway Plans
6a. Drainage Analysis
6b. Drainage Plans
6c. Selective C&G
7. Utilities
8. Environmental Permits and Env. Clearances
9. Structures Summary
10. Structures - Bridge Development Report
11. Structures - Temporary Bridge
12. Structures - Short Span Concrete
13. Structures - Medium Span Concrete
14. Structures - Structural Steel
15. Structures - Segmental Concrete
16. Structures - Movable Span
17. Structures - Retaining Walls
18. Structures - Miscellaneous
19. Signing and Pavement Marking Analysis
20. Signing and Pavement Marking Plans
21. Signalization Analysis
22. Signalization Plans
23. Lighting Analysis
24. Lighting Plans
25. Landscape Analysis
26. Landscape Plans
27. Survey
28. Photogrammetry
29. Mapping
30. Terrestrial Mobile LiDAR
31. Architecture Development
32. Noise Barriers Impact Design Assessment
33. Intelligent Transportation Systems Analysis
34. Intelligent Transportation Systems Plans
35. Geotechnical
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Access Management Classification:
TTCP Level: Survey Level:
1. Design Exceptions: 1.
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Federal Aid Project Identification Number:
N/A End Milepost: N/A Project Length:
Typical Section:
Project Activity:
Estimated By: Negotiated By: (name - firm)
Consultant FDOT Consultant FDOT
2. 2.
3. 3.
4. 4.
5. 5.
(Minor / Major)
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Jason Mihalovits / WGI Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Jason Mihalovits / WGI Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Enter name & firm Enter name & office Enter name & firm Enter name & office
Project Staff Hour Summary
Name of Consultant: WGI, Inc
Activity
No.
Activity WGI, Inc Goal PGA Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Sub 11 Sub 12 Total Hours
3 Project Common and General Tasks 0 0
4 Roadway Analysis 0 0
5 Roadway Plans 0 0
6a Drainage Analysis 0 0
6b Drainage Plans 0 0
6c Selective C&G 0 0
7 Utilities 0 0
8 Env. Permits and Env. Clearances 0 0
9 Structures - Summary, Misc. Tasks, Dwgs. 0 0
10 BDR 0 0
11 Temporary Bridge 0 0
12 Short Span Concrete Bridge 0 0
13 Medium Span Concrete Bridge 0 0
14 Structural Steel Bridge 0 0
15 Segmental Concrete Bridge 0 0
16 Movable Span 0 0
17 Retaining Walls 0 0
18 Miscellaneous Structures 0 0
19 Signing & Pavement Marking Analysis 0 0
20 Signing & Pavement Marking Plans 0 0
21 Signalization Analysis 0 0
22 Signalization Plans 0 0
23 Lighting Analysis 0 0
24 Lighting Plans 0 0
25 Landscape Analysis 129 34 43 206
26 Landscape Plans 99 99
27 Survey - Field and Office Support 0 0
28 Photogrammetry 0 0
29 Mapping 0 0
30 Terrestrial Mobile LiDAR 0 0
31 Architecture Development 0 0
32 Noise Barriers Impact Design Assessment 0 0
33 ITS Analysis 0 0
34 ITS Plans 0 0
35 Geotechnical 0 0
228 34 43 0 0 0 0 0 0 0 0 0 0 305
27 Survey Field Crew Days 0 0
Notes: 1. Staff hours for prime consultant come directly from each discipline's worksheet.
2. Staff hours for subconsultants are to be entered manually into columns D through O.
3. For workbooks prepared by subconsultants, their project hours will be totaled in column C.
Misc TWO for Continuing Services for Landscape Architecture Design/Production
Project Total
439828-1-32-01
Project Staff Hours
TWO_1_Staff Hour Estimate
Summary Page 1 of 1 2/18/2025
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: Misc TWO for Continuing Services for Landscape Architecture Design/Production Consultant Name: WGI, Inc County: Various Consultant No.: CAV61 FPN: 439828-1-32-01 Date: 3/10/2025 FAP No.: 54321 Estimator: Jason Mihalovits
SH Salary Average
By Cost By Rate Per
$268.92 $189.73 $174.89 $100.73 $69.83 $230.28 $175.78 $194.96 $129.97 $154.76 $124.68 $68.01 Activity Activity Task
3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 129 17 48 19 32 13 0 0 0 0 0 0 0 129 $21,133 $163.82
26. Landscape Plans 99 12 37 15 25 10 0 0 0 0 0 0 0 99 $16,087 $162.49
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 228 29 85 34 57 23 0 0 0 0 0 0 0 228
Total Staff Cost $7,798.68 $16,127.05 $5,946.26 $5,741.61 $1,606.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $37,219.69 $163.24
Check = $37,219.69
Survey Field Days by Subconsultant SALARY RELATED COSTS: $37,219.69
4 - Person Crew: OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. EXPENSES: 0.00% $0.00
2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden. Survey (Field - if by Prime) 0 4-person crew days @ -$ / day $0.00
SUBTOTAL ESTIMATED FEE: $37,219.69
Subconsultant: Goal $6,739.52
Subconsultant: PGA $5,906.31
Subconsultant: Sub 3 $0.00
Subconsultant: Sub 4 $0.00
Subconsultant: Sub 5 $0.00
Subconsultant: Sub 6 $0.00
Subconsultant: Sub 7 $0.00
Subconsultant: Sub 8 $0.00
Subconsultant: Sub 9 $0.00
Subconsultant: Sub 10 $0.00
Subconsultant: Sub 11 $0.00
Subconsultant: Sub 12 $0.00
SUBTOTAL ESTIMATED FEE: $49,865.52
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $49,865.52
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $49,865.52
Technician Aid
Home
Landscape
Architect
Home
Chief Designer
Home
Engineering
Intern Home
Engineer 1
Home
Senior
Designer
Home
Senior
Landscape
Architect
Home
Project
Landscape
Architect
Home
Landsape
Designer /
Landscape
Planner Home
Landscape
Architect
Intern Home
Design Intern
Home Staff Classification
Total Staff Hours From
"SH
Summary -
Firm"
Senior
Landscape
Architect
Home
TWO_1_Staff Hour Estimate
Fee Sheet - Prime Page 1 of 1 3/10/2025 3:18 PM
ESTIMATE OF WORK EFFORT AND COST - SUBCONSULTANT
Name of Project: Misc TWO for Continuing Services for Landscape Architecture Design/Production Consultant Name: Goal Associates, Inc.
County: Various Consultant No.: enter consultants proj. number
FPN: 439828-1-32-01 Date: 3/10/2025
FAP No.: 54321 Estimator: Jason Mihalovits
SH Salary Average
By Cost By Rate Per
$268.92 $189.73 $174.89 $100.73 $69.83 $230.28 $175.78 $194.96 $129.97 $154.76 $124.68 $68.01 Activity Activity Task
3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 34 0 0 0 0 0 14 20 0 0 0 0 0 34 $6,740 $198.22
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 34 0 0 0 0 0 14 20 0 0 0 0 0 34
Total Staff Cost $0.00 $0.00 $0.00 $0.00 $0.00 $3,223.92 $3,515.60 $0.00 $0.00 $0.00 $0.00 $0.00 $6,739.52 $198.22
Check = $6,739.52
SALARY RELATED COSTS: $6,739.52
OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Subconsultant to calculate its fee. EXPENSES: 0.00% $0.00
SUBTOTAL ESTIMATED FEE: $6,739.52
Survey (Field) 0 4-person crew days @ -$ / day $0.00
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $6,739.52
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $6,739.52
Engineering
Intern Home
Technician
Aid Home
Design Intern
Home
Engineer 1
Home
Senior
Designer
Home
Senior
Landscape
Architect
Home
Landscape
Architect
Home
Chief
Designer
Home
Landscape
Architect
Intern Home
Staff Classification Total Staff
Hours From
"SH Summary -
Firm"
Senior
Landscape
Architect
Home
Project
Landscape
Architect
Home
Landsape
Designer /
Landscape
Planner
Home
TWO_1_Staff Hour Estimate
Fee Sheet - GOAL Page 1 of 1 3/10/2025 3:20 PM
ESTIMATE OF WORK EFFORT AND COST - SUBCONSULTANT
Name of Project: Misc TWO for Continuing Services for Landscape Architecture Design/Production Consultant Name: Patel, Greene and Associates, LLC.
County: Various Consultant No.: enter consultants proj. number
FPN: 439828-1-32-01 Date: 3/10/2025
FAP No.: 54321 Estimator: Jason Mihalovits
SH Salary Average
By Cost By Rate Per
$268.92 $189.73 $174.89 $100.73 $69.83 $230.28 $175.78 $194.96 $129.97 $154.76 $124.68 $68.01 Activity Activity Task
3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 43 0 0 0 0 0 0 0 6 15 9 9 4 43 $5,906 $137.36
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 43 0 0 0 0 0 0 0 6 15 9 9 4 43
Total Staff Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,169.76 $1,949.55 $1,392.84 $1,122.12 $272.04 $5,906.31 $137.36
Check = $5,906.31
SALARY RELATED COSTS: $5,906.31
OVERHEAD: 0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Subconsultant to calculate its fee. EXPENSES: 0.00% $0.00
SUBTOTAL ESTIMATED FEE: $5,906.31
Survey (Field) 0 4-person crew days @ -$ / day $0.00
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $5,906.31
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $5,906.31
Landscape
Architect
Intern Home
Staff Classification
Total Staff
Hours From
"SH Summary -
Firm"
Senior
Landscape
Architect
Home
Project
Landscape
Architect
Home
Landsape
Designer /
Landscape
Planner
Home
Engineering
Intern Home
Technician
Aid Home
Design Intern
Home
Engineer 1
Home
Senior
Designer
Home
Senior
Landscape
Architect
Home
Landscape
Architect
Home
Chief
Designer
Home
TWO_1_Staff Hour Estimate
Fee Sheet - PGA Page 1 of 1 3/10/2025 3:21 PM
Misc TWO for Continuing Services for Landscape Architecture Design/Production
439828-1-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity
Low
25.1 Data Collection LS 1 Simple 8 0 0 0 WGI
25.2 Outdoor Advertising Assessment Sign Structure 0 0 0 0 0 WGI
25.3 Master Design File Setup (Base Files) LS 1 Simple 16 0 0 0 WGI
Length (Miles) 0.50 Low 4 0 0 0 WGI
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 WGI
Mainline
Length (Miles)
0.50 Simple 8 0 0 0 WGI
Area Projects
Area (Acre)
0.00 Simple 0 0 0 0 WGI
Report
Preparation 0 Low 0 0 0 0 WGI
Mainline
Length (Miles)
0.75 Low 18 0 0 0 WGI
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 WGI
Mainline
Length (Miles)
0.75 Low 45 0 0 0 WGI
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 WGI
Feasibility
Report
0 0 0 0 0 WGI
Mainline
Length (Miles)
0.75 0 0 0 0 WGI
Area Projects 0.00 0 0 0 0 WGI
Mainline
(per mile)
0.75 0 0 0 0 WGI
Area Projects 0.00 0 0 0 0 WGI
Report
Preparation
0 0 0 0 0 WGI
LS 1 Simple 8 0 0 0 WGI
25.11 Final Hardscape Design LS 0 Simple 0 0 0 0 WGI
25.12 Landscape Quantities for EQ Report LS Low 0 0 0 0 WGI
Engineer
Estimate 0 Low 0 0 0 0 WGI
LRE Updates 3 Low 6 0 0 0 WGI
25.14 Technical or Modified Special Provisions TSPs & MSPs 0 0 0 0 0 WGI
25.15 Other Landscape Services LS 0 0 0 0 WGI
113 0 0 0
25.16 Quality Assurance/Quality Control LS 1 5% 6 0 0 0 WGI
25.17 Supervision LS 1 5% 6 0 0 0 WGI
Meetings 0 0 0 0 0 WGI
Travel Time 0 0 0 0 WGI
25.19 Field Reviews (listed below) LS 0 0 0 0 WGI
25.10 Conceptual Hardscape Design
25.13 Cost Estimates
Landscape Analysis Technical Subtotal
25.18 Landscape Meetings (listed below)
25.8 Conceptual Irrigation Design
25.9 Final Irrigation Design
25.6 Conceptual Planting Design
25.7 Final Planting Design
25.5 Landscape Opportunity Plan
Representing Print Name
25.4 Site Inventory and Analysis
FDOT District
Consultant Name
Estimator: Jason Mihalovits 25. Landscape Analysis Staff Hours
Provide documentation when negotiated hours differ from the calculated hours.
What is the complexity of the planting plan? (See Landscape Guidelines)
Calculated Department Consultant Negotiated
Task
No.
Task
Project Parameter Staff Hours
12 0 0 0
25.20 Coordination LS 1 3% 4 0 0 0 WGI
129 0 0 0Landscape Analysis Total
Landscape Analysis Non-Technical Subtotal
26. Landscape Plans
439828-1-32-01
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity
Low
Key Sheet LS 1 4 0 0 0 WGI
Signature Sheet LS 0 0 0 0 0 WGI
26.2 Plant Schedule (Sheet no longer produced) WGI
26.3 General Notes/Pay Item Notes LS 1 Standard 9 0 0 0 WGI
26.4 Planting Plans For Linear Areas
Linear Project
Length (Miles)
2.00 Low 28 0 0 0 WGI
26.5 Planting Plans for Non-Linear Areas (Stormwater
Facilities, Rest Areas, Interchanges, & Toll Plazas)
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 WGI
26.6 Planting Details Details 0 0 0 0 0 WGI
26.7 Irrigation Plans for Linear Areas
Linear Project
Length (Miles)
2.00 Simple 28 0 0 0 WGI
26.8 Irrigation Plans for Non-Linear Areas (Stormwater
Facilities, Rest Areas, Interchanges, & Toll Plazas)
Area Projects
Area (Acre)
0.00 0 0 0 0 WGI
26.9 Irrigation Details Details 0 0 0 0 0 WGI
26.10 Hardscape Plans 1 Simple 20 0 0 0 WGI
26.11 Maintenance Plan 0 0 0 0 0 WGI
89 0 0 0
26.12 Quality Assurance/Quality Control % 1 5% 5 0 0 0 WGI
26.13 Supervision % 1 5% 5 0 0 0 WGI
99 0 0 0
Provide documentation when negotiated hours differ from the calculated hours.
FDOT District
Consultant Name
Estimator: Jason Mihalovits 26. Landscape Plans Staff Hours
Representing Print Name
Landscape Plans Technical Hours Subtotal
26.1
Task
No.
Task
Project Parameter Staff Hours
26. Landscape Plans Total
What is the complexity of the planting plan? (See Landscape Guidelines) Calculated Department Consultant Negotiated
TWO_1_Staff Hour Estimate
26. Landscape Plans Page 1 of 1 2/3/2025
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity
Low
25.1 Data Collection LS 1 Simple 8 0 0 0 Goal and Associates
25.2 Outdoor Advertising Assessment Sign Structure 0 0 0 0 0 Goal and Associates
25.3 Master Design File Setup (Base Files) LS 0 Simple 0 0 0 0 Goal and Associates
Length (Miles) 0.00 Low 0 0 0 0 Goal and Associates
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 Goal and Associates
Mainline
Length (Miles)
0.00 Simple 0 0 0 0 Goal and Associates
Area Projects
Area (Acre)
0.00 Simple 0 0 0 0 Goal and Associates
Report
Preparation 0 Low 0 0 0 0 Goal and Associates
Mainline
Length (Miles)
0.25 Low 6 0 0 0 Goal and Associates
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 Goal and Associates
Mainline
Length (Miles)
0.25 Low 15 0 0 0 Goal and Associates
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 Goal and Associates
Feasibility
Report 0 0 0 0 0 Goal and Associates
Mainline
Length (Miles)
0.25 0 0 0 0 Goal and Associates
Area Projects 0.00 0 0 0 0 Goal and Associates
Mainline
(per mile)
0.25 0 0 0 0 Goal and Associates
Area Projects 0.00 0 0 0 0 Goal and Associates
Report
Preparation 0 0 0 0 0 Goal and Associates
LS 0 Simple 0 0 0 0 Goal and Associates
25.11 Final Hardscape Design LS 0 Simple 0 0 0 0 Goal and Associates
25.12 Landscape Quantities for EQ Report LS Low 0 0 0 0 Goal and Associates
Engineer
Estimate 0 Low 0 0 0 0 Goal and Associates
LRE Updates 0 Low 0 0 0 0 Goal and Associates
25.14 Technical or Modified Special Provisions TSPs & MSPs 0 0 0 0 0 Goal and Associates
25.15 Other Landscape Services LS 0 0 0 0 Goal and Associates
29 0 0 0
25.16 Quality Assurance/Quality Control LS 1 5% 2 0 0 0 Goal and Associates
25.17 Supervision LS 1 5% 2 0 0 0 Goal and Associates
Meetings 0 0 0 0 0 Goal and Associates
Travel Time 0 0 0 0 Goal and Associates
25.19 Field Reviews (listed below) LS 0 0 0 0 Goal and Associates
25.13 Cost Estimates
Landscape Analysis Technical Subtotal
25.18 Landscape Meetings (listed below)
25.9 Final Irrigation Design
25.10 Conceptual Hardscape Design
25.7 Final Planting Design
25.8 Conceptual Irrigation Design
What is the complexity of the planting plan? (See Landscape Guidelines)
25.4 Site Inventory and Analysis
25.5 Landscape Opportunity Plan
25.6 Conceptual Planting Design
Calculated Department Consultant Negotiated Provide documentation when negotiated hours differ from the calculated hours.
Task
No.
Task
Project Parameter Staff Hours
Estimator: Jason Mihalovits 25. Landscape Analysis Staff Hours
Representing Print Name
FDOT District
Consultant Name
4 0 0 0
25.20 Coordination LS 1 3% 1 0 0 0 Goal and Associates
34 0 0 0Landscape Analysis Total
Signature / Date
NOTE: Signature Block is optional, per District preference
Documentation
Description Units Complexity
Low
25.1 Data Collection LS 1 Simple 8 0 0 0 PGA
25.2 Outdoor Advertising Assessment Sign Structure 0 0 0 0 0 PGA
25.3 Master Design File Setup (Base Files) LS 0 Simple 0 0 0 0 PGA
Length (Miles) 0.00 Low 0 0 0 0 PGA
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 PGA
Mainline
Length (Miles)
0.25 Simple 4 0 0 0 PGA
Area Projects
Area (Acre)
0.00 Simple 0 0 0 0 PGA
Report
Preparation 0 Low 0 0 0 0 PGA
Mainline
Length (Miles)
0.25 Low 6 0 0 0 PGA
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 PGA
Mainline
Length (Miles)
0.25 Low 15 0 0 0 PGA
Area Projects
Area (Acre)
0.00 Low 0 0 0 0 PGA
Feasibility
Report
0 0 0 0 0 PGA
Mainline
Length (Miles)
0.25 0 0 0 0 PGA
Area Projects 0.00 0 0 0 0 PGA
Mainline
(per mile)
0.25 0 0 0 0 PGA
Area Projects 0.00 0 0 0 0 PGA
Report
Preparation
0 0 0 0 0 PGA
LS 0 Simple 0 0 0 0 PGA
25.11 Final Hardscape Design LS 0 Simple 0 0 0 0 PGA
25.12 Landscape Quantities for EQ Report LS Low 0 0 0 0 PGA
Engineer
Estimate 1 Low 2 0 0 0 PGA
LRE Updates 1 Low 2 0 0 0 PGA
25.14 Technical or Modified Special Provisions TSPs & MSPs 0 0 0 0 0 PGA
25.15 Other Landscape Services LS 0 0 0 0 PGA
37 0 0 0
25.16 Quality Assurance/Quality Control LS 1 5% 2 0 0 0 PGA
25.17 Supervision LS 1 5% 2 0 0 0 PGA
Meetings 0 0 0 0 0 PGA
Travel Time 0 0 0 0 PGA
25.19 Field Reviews (listed below) LS 0 0 0 0 PGA
25.13 Cost Estimates
Landscape Analysis Technical Subtotal
25.18 Landscape Meetings (listed below)
25.9 Final Irrigation Design
25.10 Conceptual Hardscape Design
25.7 Final Planting Design
25.8 Conceptual Irrigation Design
What is the complexity of the planting plan? (See Landscape Guidelines)
25.4 Site Inventory and Analysis
25.5 Landscape Opportunity Plan
25.6 Conceptual Planting Design
Calculated Department Consultant Negotiated Provide documentation when negotiated hours differ from the calculated hours.
Task
No.
Task
Project Parameter Staff Hours
Estimator: Jason Mihalovits 25. Landscape Analysis Staff Hours
Representing Print Name
FDOT District
Consultant Name
4 0 0 0
25.20 Coordination LS 1 3% 2 0 0 0 PGA
43 0 0 0Landscape Analysis Total