CN-550000-CAT95-00020000.pdf
PDF 46 KB Posted
- Contract number
- CAT95
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT) to Civil Services, Inc., located in Jacksonville, FL. The task work order is associated with Contract No. CAT95 and Payment FM No. 416620-1-32-06, with a Task Work Order No. 1 dated 8/30/2025.
The task work order authorizes Civil Services, Inc. to perform a Value Engineering study for FPID #448456-1, with a total compensation limit of $59,765.32. The method of compensation is a lump sum paid based on percentage of completion. The project is to be completed by 8/30/2025, with the work overseen by Project Manager Tyler Burgett and Construction Manager Jennifer Link. An independent assessment has confirmed that the staff hours and quantities for the proposed services are fair, reasonable, and competitive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAT95-00030000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAT95-00040000.pdf | ||
| CN-550000-CAT95-00060000.pdf | ||
| CN-550000-CAT95-W0010000.pdf | ||
| CN-550000-CAT95-W0020000.pdf | ||
| CN-550000-CAP42-W0010000.pdf | ||
| CN-550000-CAT95-00050000.pdf | ||
| CN-550000-CAT95-W0030000.pdf | ||
| CN-550000-CAT95.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
8/30/2025
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
FDOT/ Civil Services
President
$59,765.32
$0.00
(name) (title)
Christopher E Morse , PE
$59,765.32
Total authorizations to date (including this one):
Departmental Approval:
$59,765.32 Limit
Value Engineering for FPID #448456-1 and all task as described in the Scope of Services.
PM- Tyler Burgett CM- Jennifer Link
CIVIL SERVICES, INC
2394 St Johns Bluff Road S Jacksonville, FL 32246
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$59,765.32
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
VE Study- Civil Services
$59,765.32
(name) (title) Signature
Catalina Chacon, PE DCPME
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAT95 416620-1-32-06
File details come from the government source that posted it. Updated .