CN-550000-CAT53-W0030000.pdf
PDF 122 KB Posted
- Contract number
- CAT53
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving DRMP, Inc., a consulting firm located in Orlando, FL. The document is part of Contract No. CAT53 and represents Task Work Order No. 3, with a contract date of 3/6/2025 and an execution date of 2/28/2026.
The task order authorizes DRMP, Inc. to perform districtwide surveying and right-of-way mapping services, specifically focusing on vertical control for SR 59 Gamble Road from SR 30 (US 98) to CR 259 Tram Road. The total compensation for these services is $34,151.00, which represents both the amount and the limiting amount for the task. The method of compensation is based on loaded billing rates in Table 6, and the work is to be completed by 2/28/2026. The document includes departmental approval from Tim Smith, P.E., Director of Transportation Development, and consultant acceptance by Joe DiBenedetto, Vice President of DRMP, Inc. The total authorizations to date, including this task order, amount to $123,967.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CAT53-W0040000.pdf | ||
| CN-550000-CAT53-00020000.pdf | ||
| CN-550000-CAT53-00050000.pdf | ||
| CN-550000-CAT53-W0020000.pdf | ||
| CN-550000-CAT53-W0020300.pdf | ||
| CN-550000-CAT53-W0050000.pdf | ||
| CN-550000-CAF68-00120000.pdf | ||
| CN-550000-CAT53-00030000.pdf | ||
| CN-550000-CAT53-00040000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAT53-W0010000.pdf | ||
| CN-550000-CAT53.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
2/28/2026
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAT53 45315213101
$123,967.00
(name) (title) Signature
Tim Smith, P.E. Director of Transportation Development
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
DRMP, Inc.
941 Lake Baldwin Lane Orlando, FL 32814
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$34,151.00
$34,151.00 Limit
Districtwide Surveying and Right of Way Mapping Consultant.SR 59 Gamble Rd from SR 30 (US 98) to CR 259 Tram Rd Vertical Control.
Signature
Consultant PM-Craig Davis Alvin Walker PSU-B. Shiver Financial Services
$34,151.00
$0.00
(name) (title)
$34,151.00
Encumber by task
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
Docusign Envelope ID: 0E8B2574-A7DA-4D26-BC97-245F9A84F821
Joe DiBenedetto VIce President
3/6/2025
Table 1
File details come from the government source that posted it. Updated .