CN-550000-CAT53-W0030000.pdf

PDF 122 KB Posted

Attached to
Master Agreement FL|CAT53|238e43a66d1b3cbbc30706ac2f7d756a
Contract number
CAT53
Issued by
Florida

About this file

This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving DRMP, Inc., a consulting firm located in Orlando, FL. The document is part of Contract No. CAT53 and represents Task Work Order No. 3, with a contract date of 3/6/2025 and an execution date of 2/28/2026.

The task order authorizes DRMP, Inc. to perform districtwide surveying and right-of-way mapping services, specifically focusing on vertical control for SR 59 Gamble Road from SR 30 (US 98) to CR 259 Tram Road. The total compensation for these services is $34,151.00, which represents both the amount and the limiting amount for the task. The method of compensation is based on loaded billing rates in Table 6, and the work is to be completed by 2/28/2026. The document includes departmental approval from Tim Smith, P.E., Director of Transportation Development, and consultant acceptance by Joe DiBenedetto, Vice President of DRMP, Inc. The total authorizations to date, including this task order, amount to $123,967.00.

View the file

Other files

File Type Posted
CN-550000-CAT53-W0040000.pdf PDF
CN-550000-CAT53-00020000.pdf PDF
CN-550000-CAT53-00050000.pdf PDF
CN-550000-CAT53-W0020000.pdf PDF
CN-550000-CAT53-W0020300.pdf PDF
CN-550000-CAT53-W0050000.pdf PDF
CN-550000-CAF68-00120000.pdf PDF
CN-550000-CAT53-00030000.pdf PDF
CN-550000-CAT53-00040000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CAT53-W0010000.pdf PDF
CN-550000-CAT53.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

2/28/2026

*Limiting or Estimating/Budgeted Amount.

Distribution:

Task Work Order No.:

Contract No.: Payment FM No.:

CAT53 45315213101

$123,967.00

(name) (title) Signature

Tim Smith, P.E. Director of Transportation Development

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

(LA4) Units worked at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

Basic Services

DRMP, Inc.

941 Lake Baldwin Lane Orlando, FL 32814

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$34,151.00

$34,151.00 Limit

Districtwide Surveying and Right of Way Mapping Consultant.SR 59 Gamble Rd from SR 30 (US 98) to CR 259 Tram Rd Vertical Control.

Signature

Consultant PM-Craig Davis Alvin Walker PSU-B. Shiver Financial Services

$34,151.00

$0.00

(name) (title)

$34,151.00

Encumber by task

Total authorizations to date (including this one):

Departmental Approval:

Consultant Acceptance:

Docusign Envelope ID: 0E8B2574-A7DA-4D26-BC97-245F9A84F821

Joe DiBenedetto VIce President

3/6/2025

Table 1

File details come from the government source that posted it. Updated .