CN-550000-CAQ79-W0010000.pdf
PDF 2 MB Posted
- Contract number
- CAQ79
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to HBC Engineering Company for a design services contract. The contract involves HBC Engineering Company, with subconsultants including Cotleur & Hearing Landscape Architects LLC, GEOSOL, and Longitude Surveyors, LLC. The primary contract number is CAQ79, with a Financial Project ID of 453148-1-32-01, covering work in Palm Beach County.
The task work order is for design services related to corridor lighting upgrades to LED for SR-708/Blue Heron Boulevard from West of I-95 to West of Garden Road. The total contract amount is $381,246.04, with services to be completed by 11/27/2028. The scope includes lighting design analysis, photometric requirements, pay items and plan notes, maintenance coordination with Florida Power & Light, and various technical analyses such as roadway, geotechnical, utility, and survey work. The contract uses a lump sum payment method based on percentage of completion, with detailed work breakdown across multiple technical disciplines including lighting, roadway, landscape, and utility coordination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9L77-00110000.pdf | ||
| CN-550000-CAK59.pdf | ||
| CN-550000-CAQ79.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
11/27/2028
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
President
$0.00
(name) (title)
Adebayo Coker, P.E.
Departmental Approval:
Limit
Design services for corridor lighting upgrades to LED for SR-708/BLUE HERON BLVD from West of I-95 to West of Garden Rd
HBC Engineering Company
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$381,246.04
(LS2) Lump sum paid based on % of completion
Page 2 thru 6 Subtotal
Basic Services
Total authorizations to date (including this one):
$381,244.13
(name) (title) Signature
Luciana Amato Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAQ79 45314813201
Docusign Envelope ID: FA194727-E479-47E5-885B-E3E396E7DECE
01/17/2025 | 11:00 AM EST
8935 NW 35th Lane, Ste 201, Doral, FL 33172
$ 381,244.13
$381,244.13 $381,246.04
Page 1 Total $381,244.13 $381,246.04
Total $381,244.13 $381,246.04
Docusign Envelope ID: CB61D217-D6BF-490E-827A-B58E82F39674
October 17, 2024
EXHIBIT A
TASK WORK ORDER SCOPE OF SERVICES
CONTINUING SERVICES PROJECT DESIGN – BDI
Contract Number:
TWO No.:
Financial Project ID:
Project Description:
Roadway ID:
Project Limits:
County:
FDOT Project Manager: Ronald Wallace, PE HBC Project Manager: Orlando Penate, PE
Background:
This project consists of providing lighting improvements to enhance lighting at the intersection of SR- 708 and I-95, including ramps. Install lighting along SR-708 between the East of I-95 and West of Garden Road
Scope of Work:
Lighting
CAQ79
453148-1-32‐01 SR-708/Blue Heron Boulevard from West of I-95 to West of Garden Road 93012000 Along SR-708 between the East of I-95 and West of Garden Road, including the interchange and ramps of SR-708 and I-95 Palm Beach County
The lighting scope encompasses the following components:
Lighting Design Analysis Report: Includes photometric requirements, detailing required illumination levels, horizontal and vertical calculations at signalized interchanges, and horizontal calculations along SR-708 and I-95 ramps within the project limits. Also includes Underdeck Daytime Lighting Analysis.
Pay Items and Plan Notes: Provision of pay items and plan notes based on the new lighting design.
Lighting Plan Maintenance and FPL Coordination: Ensures ongoing maintenance and coordination with
Florida Power & Light (FPL).
Meetings, Coordination, and Quality Control: Involves comprehensive meetings, coordination efforts, and rigorous quality control processes
Docusign Envelope ID: FA194727-E479-47E5-885B-E3E396E7DECEDocusign Envelope ID: CB61D217-D6BF-490E-827A-B58E82F39674
Roadway The roadway scope will be the following:
Roadway Analysis incidental to the Lighting Improvements and reconstruction of sidewalks.
Temporary Traffic Control Analysis and TTCP Level I.
Roadway quantities for EQ Report and cost estimate.
Meetings, Coordination, and Quality Control.
Miscellaneous Structures The structure scope includes the following elements:
Special Foundation Analysis: Conducted as required to avoid utilities in the area and address unsuitable soil conditions.
Shallow Foundation Preparation: Preparation of calculations and details for a shallow foundation for light poles.
Meetings, Coordination, and Quality Control.
Landscape The project focuses on areas with trees, palms, or dense vegetation near proposed lighting work along SR 708 and the I-95 ramps. Key activities include:
SC&G analysis of existing and desirable vegetation within impacted areas.
Pruning and selective removals for sight and overhead clearances, plus vegetation near light poles.
Tree Disposition analysis for preservation, removal, or relocation of trees, assessing their condition and impact from construction.
Estimated handling of thirty trees, with root/branch pruning of up to ten trees for conduit and light pole installation.
No irrigation assessment, restoration, or MMOA coordination included. Tree preservation remains a priority.
Geotech The geotechnical scope of services involves performing fourteen (14) Standard Penetration Test (SPT) borings to depths of fifteen feet for proposed lighting improvements, spaced 500 feet apart and staggered. Key activities include site reconnaissance, utility coordination, traffic control, groundwater measurement, and borehole backfilling. Laboratory testing will analyze recovered soil/rock samples using ASTM and FDOT standards. The project involves using a truck-mounted drill rig and requires Maintenance of Traffic (MOT) compliance with FDOT standards.
Utilities The project scope involves the identification and coordination with Utility Agency Owners (UAOs) within the corridor, and comprehensive coordination with multiple UAOs and FDOT to ensure smooth implementation and compliance. Key activities include:
Pre-meeting preparation, meeting duration, and preparation of meeting minutes.
Identifying all UAOs and conducting contact.
Holding one field meeting with EOR and UAOs, including travel and follow-up.
Collecting, reviewing, and processing marked plans, record drawings, and as-builts from
UAOs.
Docusign Envelope ID: FA194727-E479-47E5-885B-E3E396E7DECEDocusign Envelope ID: CB61D217-D6BF-490E-827A-B58E82F39674
Reviewing and processing utility documents such as RGB, No Conflict letters, UWS, and Agreements.
Reviewing proposed construction sequence and MOT versus UAOs' facilities and proposed work.
Final plans with executed UWS and agreements to UAOs.
Compiling Utility Certification package for UAO review and final submission to FDOT.
Survey/SUE The survey scope involves:
Setting or verifying horizontal PNC control from approximately 950 feet west of Blue Heron Blvd from the center of I-95 to the west side of Blue Heron Blvd intersection with Garden Rd., including 1.13 miles of ramps at the I-95 interchange. Setting or verifying vertical PNC control within the same project limits.
Provide right-of-way (ROW) verification for I-95 ramps and Blue Heron Blvd within the specified project limits.
Conduct a topographic survey of the underside of the I-95 overpass bridge (north and southbound) to locate lighting attached to the underside deck, including details of beams, columns, and abutments, with coverage extending fifty feet on both sides of Blue Heron Blvd from the outside edge of the bridge barrier walls.
Designate and survey 25 VVH (Vertical Verification Hole) locations where lights will be placed, based on areas identified as impacted by the project. This includes designating areas for impacts and locating pipes or other utilities as necessary.
Deliverables:
Include the following Deliverables:
Constructability, Biddability, Production (signed and sealed) plans, quantities, and Lighting Design Analysis Report.
Schedule:
Design and Plans preparation will follow the current project schedule (subject to change) with the deadlines of:
Constructability Date: 07/29/2026 Biddability Date: 03/29/2027 Production Date: 08/02/2027 Production Date: 08/02/2027 Plans to Tallahassee: 09/20/2027 Letting Date: 11/17/2027
Services may begin immediately after this task work order is executed.
Docusign Envelope ID: FA194727-E479-47E5-885B-E3E396E7DECEDocusign Envelope ID: CB61D217-D6BF-490E-827A-B58E82F39674
ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT
Name of Project: SR-708/Blue Heron Boulevard from West of I-95 to West of Garden Road Consultant Name: HBC Enginneering Company County: Palm Beach Consultant No.:
FPN: 453148-1-32-01 Date: 3/17/2025 FAP No.: TBD Estimator: Orlando Penate
SH Salary Average
By Cost By Rate Per
$372.75 $359.81 $337.52 $284.82 $253.14 $232.03 $168.76 $158.23 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project Common and Project General Tasks 164 66 0 0 0 0 0 49 49 0 0 0 0 164 $40,624 $247.71
4. Roadway Analysis 149 9 3 0 44 3 0 45 45 0 0 0 0 149 $32,440 $217.72
5. Roadway Plans 76 2 2 0 26 0 0 23 23 0 0 0 0 76 $16,391 $215.67
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 181 9 5 0 5 0 54 53 55 0 0 0 0 181 $36,754 $203.06
8. Environmental Permits,and Env. Clearances 32 3 0 0 9 0 0 10 10 0 0 0 0 32 $6,952 $217.24
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 540 27 16 27 27 119 0 162 162 0 0 0 0 540 $115,720 $214.30
24. Lighting Plans 91 5 2 5 5 20 0 27 27 0 0 0 0 91 $19,587 $215.24
25. Landscape Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 1,233 121 28 32 116 142 54 369 371 0 0 0 0 1,233
Total Staff Cost $45,102.75 $10,074.68 $10,800.64 $33,039.12 $35,945.88 $12,529.62 $62,272.44 $58,703.33 $0.00 $0.00 $0.00 $0.00 $268,468.46 $217.74
Check = $268,468.46
Survey Field Days by Subconsultant SALARY RELATED COSTS: $268,468.46 4 - Person Crew: OVERHEAD: 0.00% $0.00
OPERATING MARGIN: 0% $0.00
FCCM (Facilities Capital Cost Money): 0.000% $0.00
EXPENSES: 0.00% $0.00
Survey (Field - if by Prime) 24 4-person crew days @ -$ / day $0.00
SUBTOTAL ESTIMATED FEE: $268,468.46
Subconsultant: C&H $19,675.22
Subconsultant: GEO $32,833.03
Subconsultant: LON $60,267.42
Subconsultant: Sub 4
Subconsultant: Sub 5
Subconsultant: Sub 6
Subconsultant: Sub 7
SUBTOTAL ESTIMATED FEE: $381,244.13
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $381,244.13
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $381,244.13
Chief Engineer 2
Home
Senior Electrical Engineer
Home
Engineer 1 Home
Electrical Engineer
Home Staff Classification
Total Staff Hours From
"SH
Summary -
HBC"
Project Manager 3
Home
Staff Classi-fication 12
Staff Classi-fication 9
Staff Classi-fication 10
Staff Classi-fication 11
Senior Utility Coordinator
Home
Engineering Intern Home
Engineering Technician
Home
ESTIMATE OF WORK EFFORT AND COST - SUBCONSULTANT
Name of Project: SR-708/Blue Heron Boulevard from West of I-95 to West of Garden Road Consultant Name:
County: Palm Beach Consultant No.:
FPN: 453148-1-32-01 Date: 1/2/2025 FAP No.: TBD Estimator: Aaron Wilbur
SH Salary Average
By Cost By Rate Per
$144.37 $137.42 $91.02 $95.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 144 22 50 72 0 0 0 0 0 0 0 0 0 144 $16,601 $115.28
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 17 1 7 9 0 0 0 0 0 0 0 0 0 17 $1,925 $113.26
26. Landscape Plans 10 1 4 5 0 0 0 0 0 0 0 0 0 10 $1,149 $114.92
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 171 24 61 86 0 0 0 0 0 0 0 0 0 171
Total Staff Cost $3,464.88 $8,382.62 $7,827.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $19,675.22 $115.06
Check = $19,675.22
SALARY RELATED COSTS: $19,675.22
OVERHEAD: 0.0% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.00% $0.00
1. This sheet to be used by Subconsultant to calculate its fee. EXPENSES: 0.00% $0.00
SUBTOTAL ESTIMATED FEE: $19,675.22
Survey (Field) 24 4-person crew days @ -$ / day $0.00
Geotechnical Field and Lab Testing $0.00
SUBTOTAL ESTIMATED FEE: $19,675.22
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $19,675.22
Cotleur & Hearing Landscape Architects LLC
Staff Classi-fication 4
Staff Classification Total Staff
Hours From "SH Summary -
C&H"
Senior Landscape
Architect Home
Project Landscape
Architect Home
Landscape Designer/
Landscape Planner Home
Staff Classi-fication 11
Staff Classi-fication 12
Staff Classi-fication 5
Staff Classi-fication 6
Staff Classi-fication 7
Staff Classi-fication 8
Staff Classi-fication 9
Staff Classi-fication 10
Docusign Envelope ID: FA194727-E479-47E5-885B-E3E396E7DECEDocusign Envelope ID: CB61D217-D6BF-490E-827A-B58E82F39674
Name of Project: SR-708/Blue Heron Boulevard from West of I-95 to West of Garden Road Consultant Name: GEOSOL
County: Palm Beach Consultant No.:
FPN: 453148-1-32-01 Date: 1/2/2025 FAP No.: TBD Estimator: O.Riccobono, PE (Geosol, Inc.)
SH Salary Average
By Cost By Rate Per
$237.15 $170.89 $149.08 $125.74 $87.81 $92.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 118 20 45 13 30 8 2 0 0 0 0 0 0 118 $19,031 $161.28
Total Staff Hours 118 20 45 13 30 8 2 0 0 0 0 0 0 118
Total Staff Cost $4,743.00 $7,690.05 $1,938.04 $3,772.20 $702.48 $184.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $19,030.63 $161.28
Check = $19,030.63
SALARY RELATED COSTS: $19,030.63
OVERHEAD: 0.00% $0.00
OPERATING MARGIN: 0% $0.00
Notes: FCCM (Facilities Capital Cost Money): 0.000% $0.00
1. This sheet to be used by Subconsultant to calculate its fee. EXPENSES: 0.00% $0.00
SUBTOTAL ESTIMATED FEE: $19,030.63
Survey (Field) 24 4-person crew days @ -$ / day $0.00
Geotechnical Field and Lab Testing $13,802.40
SUBTOTAL ESTIMATED FEE: $32,833.03
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $32,833.03
Staff Classi-fication 11
Staff Classi-fication 12
MAT CADD/
Computer Technician
Home
MAT
Secretary/Cle rical Home
Staff Classi-fication 7
Staff Classi-fication 8
Staff Classi-fication 9
Staff Classi-fication 10
MAT Senior Engineering Technician
Home
Staff Classification
Total Staff Hours From
"SH Summary -
GEO"
MAT Chief Engineer
Home
MAT Senior Engineer
Home
MAT Engineer Home
Docusign Envelope ID: FA194727-E479-47E5-885B-E3E396E7DECEDocusign Envelope ID: CB61D217-D6BF-490E-827A-B58E82F39674
GEOSOL PROPOSAL No.: P-224192
DESCRIPTION UNITS # OF UNIT TOTAL
UNITS RATE ($) $
1. FIELD INVESTIGATION
478-Geo SPT Truck/Mud Bug 0-50 Ft - 14 boring to 15 feet for proposed light poles LF 210.0 $16.81 $3,530.10 488-Geo Temp Casing 3in Truck/Mud Bug 0-50 Ft LF 210.0 $9.79 $2,055.90 440-Geo Grout Boreholes- Truck/Mud Bug 0-50 Ft LF 210.0 $6.37 $1,337.70
SUB-TOTAL (for FIELD INVESTIGATION) $6,923.70
MOBILIZATION/DEMOBILIZATION
612-Mobilization Drill Rig Truck Mount EACH 2.0 $498.45 $996.90 712-MOT Support Vehicle HOUR 32.0 $64.63 $2,068.16 702-MOT Channelizing Devices - Type I, II, VP, Drum (Each) EACH 200.0 $2.69 $538.00 700-MOT Arrow Board EACH 32.0 $49.82 $1,594.24
SUB-TOTAL (MOB/DEMOB) $5,197.30
TOTAL FIELD INVESTIGATION $12,121.00
2. LABORATORY PROGRAM
817-Soils Moisture Content Lab AASHTO T265 TEST 10 $14.68 $146.80 822-Soils Particle Size Anlys AASHTO T88 (No Hydrometer) TEST 10 $67.22 $672.20 812-Soils Materials Finer than 200 Sieve FM 1-T011 TEST 10 $40.78 $407.80 819-Soils Organic Content Ignition FM 1 T-267 TEST 10 $45.46 $454.60
TOTAL LABORATORY PROGRAM $1,681.40
TOTAL FIELD AND LABORATORY PROGRAM $13,802.40
GEOSOL, INC.
Broward County, FL SR-708/Blue Heron Boulevard from West of I-95 to West of Garden Road
FEE PROPOSAL FOR GEOTECHNICAL SERVICES
FILENAME = P-224192 SR 708 from I-95 to Garden Road - FEE PROPOSAL
Docusign Envelope ID: FA194727-E479-47E5-885B-E3E396E7DECEDocusign Envelope ID: CB61D217-D6BF-490E-827A-B58E82F39674
Name of Project: SR-708/Blue Heron Boulevard from West of I-95 to West of Garden Road Consultant Name: Longitude Surveyors, LLC
County: Palm Beach Consultant No.:
FPN: 453148-1-32-01 Date: 3/17/2025 FAP No.: TBD Estimator: John H. Adler III, PSM
SH Salary Average By Cost By Rate Per
$248.36 $141.43 $78.65 $174.74 $137.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Activity Activity Task
3. Project Common and Project General Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
4. Roadway Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
5. Roadway Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6a. Drainage Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6b. Drainage Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
6c. Selective C&G 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
7. Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
8. Environmental Permits,and Env. Clearances 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
9. Structures - Misc. Tasks, Dwgs, Non-Tech. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
10. Structures - Bridge Development Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
11. Structures - Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
12. Structures - Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
13. Structures - Medium Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
14. Structures - Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
15. Structures - Segmental Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
16. Structures - Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
17. Structures - Retaining Walls 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
18. Structures - Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
19. Signing & Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
20. Signing & Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
21. Signalization Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
22. Signalization Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
23. Lighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
24. Lighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
25. Landscape Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
26. Landscape Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
27. Survey (Field & Office Support) 134 7 27 40 54 6 0 0 0 0 0 0 0 134 $18,967 $141.54
28. Photogrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
29. Mapping 19 2 6 8 3 0 0 0 0 0 0 0 0 19 $2,499 $131.51
30. Terrestrial Mobile LiDAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
31. Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
32. Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
33. Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
34. Intelligent Transportation Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
35. Geotechnical 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/0!
Total Staff Hours 153 9 33 48 57 6 0 0 0 0 0 0 0 153
Total Staff Cost $2,235.24 $4,667.19 $3,775.20 $9,960.18 $827.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $21,465.69 $140.30
Check = $21,465.69
SALARY RELATED COSTS: $21,465.69
OVERHEAD: 0.00% $0.00
OPERATING MARGIN: 0% $0.00
FCCM (Facilities Capital Cost Money): 0.000% $0.00
EXPENSES: 0.00% $0.00
SUBTOTAL ESTIMATED FEE: $21,465.69
SUR Crew Chief Home 87.33 2-person crew 73.68$ /hour $6,434.47
SUR Instrument Operator Home 87.3285 Survey 64.38$ /hour $5,622.21
87.3285 Survey 49.67$ /hour $4,337.61
SUR SUE Technician 2 Home 40 2-person crew 74.51$ /hour $2,980.40
SUR SUE Technician 3 Home 40 SUE Designation 110.38$ /hour $4,415.20
SUR SUE Technician 2 Home 64 3-person crew 74.51$ /hour $4,768.64
SUR SUE Technician 3 Home 64 SUE Location 110.38$ /hour $7,064.32
64 SUE Location 49.67$ /hour $3,178.88
SUBTOTAL ESTIMATED FEE: $60,267.42
Optional Services $0.00
GRAND TOTAL ESTIMATED FEE: $60,267.42
SUR Rod Person Home
SUR Rod Person Home
Staff Classi-fication 11
Staff Classi-fication 12
SUR Field Crew
Supervisor I Home
Staff Classi-fication 6
Staff Classi-fication 7
Staff Classi-fication 8
Staff Classi-fication 9
Staff Classi-fication 10
SUR
Survey/GIS/S UE Analyst 3
Home
Staff Classification Total Staff Hours From
"SH Summary -
LON"
SUR Chief Surveyor
Home
SUR Senior Surveyor 2
Home
SUR
Survey/GIS/S UE Analyst 2
Home
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
CAQ79
1/17/2025
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 1/17/2025
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55043010452
Expansion Option: A1
Object Code: 131512
Amount: $381,246.04
Financial Project: 45314813201
Work Activity (FCT): 011
CFDA:
Fiscal Year: 2025
Budget Entity: 55100100
Category/Category Year: 088849/25
Amendment ID: W001
Sequence: 00
User Assigned ID: TWO1
Enc Line (6s)/Status: 0002/04
Total Amount: $381,246.04
Contract: CAQ79
Contract Type: CA - ENGINEERING (ENGINEER)
Vendor Name: HBC ENGINEERING COMPANY
Vendor ID: F223936061001
Beginning Date of This Agreement: 11/28/2023
Ending Date of This Agreement: 11/27/2028
Contract Total/Budgetary Ceiling: bc = $3,000,000.00
Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)
Description: Continuing Services for Project Design
Page1 of 1
To: Luciana.Amato@dot.state.fl.us
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
CAQ79
3/18/2025
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 3/18/2025
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55043010452
Expansion Option: A1
Object Code: 131512
Amount: ($1.91)
Financial Project: 45314813201
Work Activity (FCT): 011
CFDA:
Fiscal Year: 2025
Budget Entity: 55100100
Category/Category Year: 088849/25
Amendment ID: W001
Sequence: 01
User Assigned ID: TWO1
Enc Line (6s)/Status: 0002/10
Total Amount: ($1.91)
Contract: CAQ79
Contract Type: CA - ENGINEERING (ENGINEER)
Vendor Name: HBC ENGINEERING COMPANY
Vendor ID: F223936061001
Beginning Date of This Agreement: 11/28/2023
Ending Date of This Agreement: 11/27/2028
Contract Total/Budgetary Ceiling: bc = $3,000,000.00
Method of Procurement: C - REQUEST FOR PROPOSAL (287.55,F. S.)
Description: Continuing Services for Project Design
Page1 of 1
To: Luciana.Amato@dot.state.fl.us
File details come from the government source that posted it. Updated .