This document is a Task Work Order (TWO) No. 5 from the State of Florida Department of Transportation (FDOT) issued to Jacobs Engineering Group, Inc. for professional services under Contract CAP28. The task work order involves District Four and includes AECOM Technical Services, Inc. as a subconsultant, with the financial project identification number 415100-5-32-01.
The scope of services requires Jacobs Engineering Group to develop a scope of services for a feasibility study of grade separations at various railroad crossings along the South Florida Rail Corridor. The specific crossings include SR-882/Forest Hill Boulevard, SR-806/West Atlantic Avenue, Linton Boulevard, West Palmetto Park Road, SR-870/Commercial Boulevard, and SR-848/Stirling Road. The total compensation for this task work order is $21,638.72, with services to be completed within two months from the date of authorization. The deliverable will be draft and final electronic versions of the scope of services, with FDOT providing available information and review feedback.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ContractDeliverablesExport (1).csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
8/17/2028
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
Consultant, Procurement, Financial Services, FDOT Project Manager, File
$21,638.72
$0.00
(name) (title)
$21,638.72
Total authorizations to date (including this one):
Departmental Approval:
$21,638.72 Limit
Feasibility study of grade separations at various locations of the South Florida Rail Corridor.
Jacobs Engineering Group, Inc.
550 West Cypress Creek Road, Suite 400, Fort Lauderdale, FL, 33309
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$21,638.72
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services
$868,990.89
(name) (title) Signature
Shaneka Bolden Contract Coordinator
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Contract No.: Payment FM No.:
CAP28 415100-5-32-01
Florida Transportation Department Lead Joseph Martin
Task Work Order No.:
Docusign Envelope ID: 7D69A11C-87EA-4608-9FD5-77B39DC0AB17
09/24/2025 | 9:15 AM EDT
Task Work Order 5 - Scope Development for Feasibility Study of Grade Separations at Various Locations of the SFRC Page 1
ATTACHMENT A
SCOPE OF SERVICES
Rail/Freight Districtwide Contract Including Railroad Maintenance Monitoring Contract CAP28
Financial Project ID No. 415100-5-32-01 District Four
Task Work Order 5 Scope Development for Feasibility Study of Grade Separations at Various
Locations of the South Florida Rail Corridor
Jacobs Engineering Group, Inc. (JEG), as the Prime Consultant shall provide the Florida Department of Transportation (FDOT), with professional assistance to develop scope of services for a feasibility study of various grade separations on the South Florida Rail Corridor (SFRC).
The scope of services will be performed by the following Subconsultant: AECOM Technical Services, Inc. These services shall be provided as directed by FDOT’s Project Manager.
SCOPE OF SERVICES
The JEG Subconsultant shall assist FDOT with preparation of the scope of services for advertisement 26402 (Feasibility Study of Grade Separations at Various Railroad Crossings along the South Florida Rail Corridor) which includes the railroad crossings at SR-882/Forest Hill Boulevard, SR-806/West Atlantic Avenue, Linton Boulevard, West Palmetto Park Road, SR- 870/Commercial Boulevard, and SR-848/Stirling Road.
Deliverable: DRAFT and Final Electronic version of Scope of Services
ONSITE STAFF
NONE
SERVICES TO BE PROVIDED BY FDOT
The following services will be provided by FDOT to assist the JEG team in the completion of the assigned tasks:
1. Provide available information for all assignments.
2. Provide feedback and review comments of deliverables.
LENGTH OF SERVICES
Rail/Freight Districtwide Contract Including Railroad Maintenance Monitoring Financial Project ID No. 415100-5-32-01
Task Work Order 5 - Scope of Services - Locations of the South Florida Rail Corridor Page 2
The beginning date of the services shall be the date of authorization for this TWO. The services under this TWO shall be completed within two (2) months, and may be amended in coordination with FDOT’s PM.
FEE ESTIMATE
Details of the staff-hours, out of pocket expenses, and fees for this task assignment are shown in Attachment B.