This is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving AECOM Technical Services, Inc., located in Fort Lauderdale, Florida. The document is part of a Continuing Services contract (Contract No. CA097) for Road Safety Audits and Safety Studies, with a specific focus on an intersection safety assessment for State Road 802 (Lake Worth Road) at Sherwood Forest Boulevard in Palm Beach County.
The task work order authorizes AECOM to perform a comprehensive safety study for a total compensation of $25,223.66, with services to be completed by August 3, 2028. The scope includes detailed data collection, crash data analysis, field reviews, developing preliminary countermeasures, preparing technical memorandums, and conducting benefit/cost and net present value analyses. The project will involve coordination with local agencies such as the City of Greenacres, Palm Beach County Traffic Division, and law enforcement, with the ultimate goal of identifying and recommending safety improvements for the specified intersection and its median openings.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
06/17
*Limiting or Estimating/Budgeted Amount.
Distribution:
All services required under this Task Work Order will be completed on or before:
(title)
(title)
Consultant: AECOM Technical Services, Inc.
Address: 110 East Broward Blvd Suite 700
Fort Lauderdale, FL 33301 Phone (954) 330 -9111
(To be entered upon execution of T.W.O.)
Date:
Task Work Order No.:
Contract No.: Payment FM No.:
CAO97 42485543201
Brief Task Description:
As part of this Task Work Order, AECOM will perform a safety study on SR-802 (Lake Worth Rd) at Sherwood Forest Blvd.
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
8/3/2028
The total amount or the limiting amount of the compensation will be: $25,223.66
Compensation elements are as follows:
Element Description Method of Compensation Amount Est*
Safety Study (LS2) Lump sum paid based on % of completion $25,223.66
Page 1 Total
Page 2 thru 6 Subtotal
Total
$25,223.66
$0.00
$25,223.66
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Tech memo draft due date: 2/16/24
Total authorizations to date (including this one):
$575,694.23
Departmental Approval:
David Moore Project Manager
(name) Signature
Consultant Acceptance:
Jan Everett, P.E. Senior Vice President
(name) Signature
SCOPE OF SERVICES
For Task Work Order 8
Continuing Services for Road Safety Audits and Safety Studies Contract No: CA097; FM No. 424855-4-32-01
Intersection Safety Assessment SR 802 (Lake Worth Road) at Sherwood Forest Boulevard
SCOPE OF SERVICES
As part of Task Work Order 8, AECOM will perform the tasks as described below to perform a safety assessment at the intersection of SR 802 (Lake Worth Road) at Sherwood Forest Boulevard located in Palm Beach County, Florida. In addition to the intersection, two median openings (one on the west leg, one on the east leg) will also be analyzed. Any task that is not listed below will be considered out of scope.
Data Collection
• Download crash detail and police reports for the recent 3-year data from Signal 4 Analytics.
• Retrieve high crash lists from Signal Four data for the recent 3-years available.
• Gather existing conditions data (context classication, functional classication, AADT, historical trac counts, signal timing sheets, speed limits, transit data), as applicable.
• Work Program information
• Historical studies overlapping the location of interest.
Project Progress Meetings
• Attend two progress meetings (pre-vetting and post vetting) with FDOT PM.
• Contact the following agencies, as applicable, to obtain their input on proposed improvements.
o Local agency (City of Greenacres).
o Signal maintaining agency (Palm Beach County Traffic Division).
o Law enforcement agency
• Coordination meetings with Planning/Design Oces to discuss proposed improvements and status of the vetting process.
Crash Data Analysis and Collision Diagrams
• Review and summarize FDOT’s high crash location listing.
• Review crash reports to identify mislocated crashes and miscoded crash types (for critical crash types based on engineering judgment).
• Prepare crash summary tables and develop collision diagrams.
• Review crash reports for signicant crash patterns and identify probable causes.
Existing Condition Diagram
• Develop a condition diagram on an aerial image. The condition diagram will show only those roadway features that are pertinent to the scope of this study.
Field Reviews
• Conduct peak hour field reviews (one during the AM peak hour and one during the PM peak hour) to assess existing conditions.
• Collect sample light meter readings and summarize in a sketch.
Develop Preliminary Countermeasures
• Based on the crash data ndings and eld reviews, develop preliminary countermeasures (short-term and long-term) to address crash patterns identied and any safety best practices that are deemed critical for implementation.
• If a recommended action requires a further review/study, typical tasks involved in such review should be elaborated.
Preliminary Cost Estimate
• Develop a preliminary cost estimate based on previous projects with similar improvements and/or opinion of probable costs in MS-Excel format.
Prepare Tier-1 Technical Memorandum
• Prepare a Tech Memo summarizing the study findings and preliminary safety recommendations and submit it to the District Safety Office. The Safety Office will forward this memo to the Planning/Design Offices for feasibility assessment and vetting of proposed improvements.
Benefit/Cost (B/C) and Net Present Value (NPV) Analysis
• Based on the revised process, the Planning (CD Section)/Design Offices will prepare a tech memo to summarize their findings of feasibility assessment/vetting, prepare a concept sketch and LRE (Construction Cost Estimate). The safety consultant shall develop an estimate of potential crash reduction and perform B/C and NPV analyses for proposed improvements based on the vetted concept and LRE provided by the Planning/Design Offices.
Draft Deliverables (Tier 2) Revise Tier-1 Tech Memo to include feasibility assessment and vetting of proposed improvements by the Planning/Design Offices. The following will be included in the draft deliverable for FDOT Project Manager’s review:
• Findings of Field Reviews
• Crash Analysis and Collision Diagrams
• Summary of Existing Conditions
• Summary of Coordination Activity
• Summary of Proposed Improvements
• Concept Drawings (Conceptual Improvements) – to be provided by Planning/Design Offices.
• LRE – to be provided by Planning/Design Offices.
• B/C & NPV Calculations
Final Deliverable
• Revise draft report based on FDOT comments.
• Submit a PDF of the Final Report.
ADDITONAL SERVICES
Any services not specically listed in the above scope will be considered additional services and can be performed through an amendment to the task work order upon endorsement by the FDOT PM.