CN-550000-CAL65-W0100000.pdf

PDF 61 KB Posted

Attached to
Master Agreement FL|CAM15|298b7bfc8cc02cd6d87726303e0db795
Contract number
CAM15
Issued by
Florida

About this file

This document is a Task Work Order Amendment Form from the State of Florida Department of Transportation (FDOT) for professional services, involving Comprehensive Engineering Services, Inc. as the consultant. The document is specifically related to Contract No. CAL65, Amendment No. 2 to Task Work Order No. 3, with a Payment FM No. of 450632-1-32-01. The key parties include FDOT Project Manager Samuel Jumber and Construction Manager Diana Turner.

The amendment provides additional Design Services for SR-A1A from Hidden Cove to Sea Dunes Drive, increasing the total contract amount by $41,846.83. The funds are primarily allocated to Design Services-CES, bringing that compensation element from $294,683.94 to $336,530.77. The amendment uses a lump sum payment method based on percentage of completion for most services. The total authorizations to date, including this amendment, reach $2,952,796.12. An independent assessment confirmed the staff hours and quantities as fair, reasonable, and competitive. The document reflects an increase in design services without changing other existing compensation elements like environmental permitting, public involvement, or survey services.

View the file

Other files

File Type Posted
CN-550000-CAM15-00020000.pdf PDF
CN-550000-CAM15-00030000.pdf PDF
CN-550000-CAM15.pdf PDF
CN-550000-CAM15-00020000.pdf.crdownload CRDOWNLOAD file
CN-550000-CAM15-00040000.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

375-030-26

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

PROCUREMENT

08/21TASK WORK ORDER AMENDMENT FORM

FOR PROFESSIONAL SERVICES

Consultant:

Comprehensive Engineering Services, Inc.

Address:

201 South Orange Avenue, Suite 1300, Orlando, FL 32801

Contract No.: Date (To be entered upon execution of Task Work Order Amendment):

CAL65

Amendment No. to Task Work Order No. Payment FM No. (must be the same as original Task Work Order):

450632-1-32-012 3

Purpose of Amendment:

The Consultant will provide additional Design Services on SR-A1A FROM HIDDEN COVE TO SEA DUNES DR as stated in the attached Scope of Services.

FDOT PM: Samuel Jumber FDOT CM: Diana Turner

Check all applicable Terms:

The time for completion of services for the subject task work order is extended thru .

The subject task work order is hereby closed. Final payment for the task work order has been set to PAID status in CITS. No additional services or charges are authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered from this task work order $ . Note: for Prof. Serv. Task Work Order Amendments, the encumbrance line should never be closed

(Status 50) by Financial Services staff based on this selection. Additional Note: Please be sure you want to close out before marking. Premature close outs that must be corrected in CITS may require programmer time and costs borne by the program office.

The subject task work order is hereby canceled (no work has been performed and no payment is due). The total amount of the task work order which is recovered is $ .

The total amount for services performed under this task work order is increased by $ 41,846.83 .

The additional funds will be allocated to the following compensation elements described below.

.The total amount for services performed under this task work order is decreased by $

The decrease in funds will be allocated to the following compensation elements described below.

There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation elements are described below.

Compensation Element Previous This Amendment Estimate/L Method of Compensation Subtotal

Description Amount Amount imit

Design Services-CES (LS2) Lump sum paid based on % of $294,683.94 $41,846.83 $336,530.77

Limitcompletion

Design Public Involvement Services- (LS2) Lump sum paid based on % of $12,612.74 $0.00 $12,612.74

LimitQuest completion

Design Environmental Permitting & (LS2) Lump sum paid based on % of $19,977.46 $0.00 $19,977.46

LimitClearance Services-SEARCH completion

Design Environmental Permitting & (LS2) Lump sum paid based on % of $8,589.26 $0.00 $8,589.26

LimitClearance Services-MES completion

Design Services-Tierra (LS2) Lump sum paid based on % of $18,903.03 $0.00 $18,903.03

Limitcompletion

Design Geotech Services-Tierra (LA4) Units worked at loaded billing rates in $7,534.27 $0.00 $7,534.27

EstimateTable 6

Page 1 subtotal $41,846.83 $404,147.53

Page 2 thru 6 Subtotal $0.00 $222,598.23

$626,745.76Total $41,846.83

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Attachments:

Total authorizations to date (including this one):

$2,952,796.12

Departmental Approval:

Catalina Chacon, P.E. DCPME

(Name) (Title) Signature

Consultant Acceptance:

Arthur Shipley Vice President

(Name) (Title) Signature

FDOT / Comprehensive Engineering Services, Inc.Distribution:

375-030-26

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

PROCUREMENT

08/21TASK WORK ORDER AMENDMENT FORM

FOR PROFESSIONAL SERVICES

Consultant:

Comprehensive Engineering Services, Inc.

Address:

201 South Orange Avenue, Suite 1300, Orlando, FL 32801

Date (To be entered upon execution of Task Work Order Amendment):Contract No.:

CAL65 0

Amendment No. to Task Work Order No. Payment FM No. (must be the same as original Task Work Order):

2 3 450632-1-32-01

Purpose of Amendment:

The Consultant will provide additional Design Services on SR-A1A FROM HIDDEN COVE TO SEA DUNES DR as stated in the attached Scope of Services.

FDOT PM: Samuel Jumber FDOT CM: Diana Turner

Compensation Element Previous This Amendment Estimate/L Method of Compensation Subtotal

Description Amount Amount imit

Design Structures Services-FBT (LS2) Lump sum paid based on % of $15,998.89 $0.00 $15,998.89 Limitcompletion

Design Survey Services-ECHO (LA4) Units worked at loaded billing rates in $0.00 $0.00 $0.00 EstimateTable 6

Design Survey Services-Authorized- (LA4) Units worked at loaded billing rates in $160,988.50 $0.00 $160,988.50 EstimateECHO Table 6

Design Survey Services-Supplemental- (LA4) Units worked at loaded billing rates in $6,262.33 $0.00 $6,262.33 EstimateECHO Table 6

Design Survey Services-ECHO (LS2) Lump sum paid based on % of $39,348.51 $0.00 $39,348.51 Limitcompletion

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$222,598.23Page 2 subtotals $0.00

File details come from the government source that posted it. Updated .