This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving TLP Engineering Consultants, Inc., located in Orlando, FL. The task work order is associated with Contract No. CAD69 and Task Work Order No. 10, with a Payment FM No. of 23709913209.
The task work order authorizes TLP Engineering Consultants to provide post-design services with a total compensation limit of $13,200.00, to be completed by 5/16/2026. The compensation will be calculated using (LA4) units worked at loaded billing rates specified in Table 6. The document notes that an independent assessment has been performed to verify the staff hours and quantities as fair, reasonable, and competitive. The total authorizations to date, including this task work order, amount to $415,409.01. The document is signed by Kyle Howard from FDOT as the Project Manager (Drainage Engineer) and James Myers from TLP Engineering Consultants as the Consultant Project Manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CAV78-00010000.pdf | ||
| CN-550000-CAV78-00030000.pdf | ||
| CN-550000-CAV78-S0020000.pdf | ||
| CN-550000-CAV78-S0010000.pdf | ||
| CN-550000-CAV78.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
06/17
Consultant:
Address:
Date:
5/16/2026
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
D5 Procurement; TLP; File
Consultant PM
$13,200.00
$0.00
(name) (title)
James Myers
$13,200.00
Total authorizations to date (including this one):
Departmental Approval:
$13,200.00 Limit
Provide post design services.
TLP Engineering Consultants, Inc.
450 S Orange Avenue Suite 600 Orlando, FL 32801
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$13,200.00
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
Basic Services Including Expenses (TLP)
$415,409.01
(name) (title) Signature
Kyle Howard FDOT PM - Drainage Engineer
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAD69 23709913209