CN-550000-CA910-S0050000.pdf
PDF 218 KB Posted
- Contract number
- CA910
- Issued by
- Florida
About this file
This document is an Amendment to a Standard Professional Services Agreement between the State of Florida Department of Transportation (FDOT) and CONSOR Engineers, LLC, specifically Amendment Number 4 to the original contract CA910 executed on 5/26/2020. The amendment pertains to a project in Alachua County involving Construction Engineering and Inspection (CEI) services for State Road 121 Traffic Operations Improvements, spanning from NW 16th Avenue to US 441.
The amendment increases the total maximum limiting amount by $159,964.00, bringing the contract's total to $1,656,055.23. The contract's end date is extended to September 30, 2022, to accommodate contractor activities and project closeout. The additional funding is specifically for additional construction engineering and inspection services related to Construction Contract T2779, which has experienced extended contract time due to various issues. The compensation is structured across multiple financial project numbers with different payment methods, including defined loaded rates and actual expenditures for CEI services and field office expenses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-CA910-S0010000.pdf | ||
| CN-550000-CA910-S0030000.pdf | ||
| CN-550000-CA910-S0030100.pdf | ||
| CN-550000-CA910-S0040000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-CA910-00030000.pdf | ||
| CN-550000-CA910-S0020000.pdf | ||
| CN-550000-CAJ25-W0040000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District Two Professional Services Office, 1109 South Marion Avenue MS 2016, Lake City, Florida 32025-5874, (386) 758-3709, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
08/21
Amendment Number: 4 Amendment Execution Date:
Original Agreement No.: CA910 Original Agreement Execution Date: 5/26/2020
Consultant Name: CONSOR Engineers, LLC
FM Number(s): 439490-1-62-01
FAP No.: D219 172 B
Agreement Description: CEI Services: SR 121 Traffic Ops Improvements (NW 16th Ave. to US 441)
Purpose of Amendment: Add Funds, Time Extension, Incorporate attachments to the contract
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $1,496,091.23 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $159,964.00. The revised total maximum limiting amount for all services is $1,656,055.23. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".
Section 2.B. of the Standard Professional Services Agreement is revised to extend the time period for completion of basic project services through 9/30/2022.
The following attachments are hereby incorporated into this Amendment:
Exhibit B – Contract Compensation Summary Table
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
CONSOR Engineers, LLC Name of Consultant
BY: BY:
Name: Name: Karen F. Ross
Title: Title: Procurement Services Manager
District Two
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
A-1
Contract No: CA910
FIN No: 439490-1-62-01
SCOPE OF SERVICES
SUPPLEMENTAL AMENDMENT NO. 4
The Consultant firm CONSOR Engineers, LLC. was retained by the Department to provide Construction
Engineering and Inspection (CEI) services for a grouping of traffic operation projects in Alachua County.
1.0 PURPOSE
The CCEI Contract is being amended to increase funding on FIN 439490-1-62-01 for additional construction engineering and inspection services commensurate with estimated completion of
Construction Contract T2779 in which various issues have extended contract time.
The contract end date is being extended to September 30, 2022 commensurate with contractor activities and to allow for project closeout.
2.0 SERVICES TO BE PROVIDED BY THE CONSULTANT
the original contract CA910.
3.0 DEPARTMENT RESPONSIBILITIES
No additional Department responsibilities are required for this Supplemental Agreement.
4.0 SUMMARY OF FEES
hereto and made a part hereof.
B -1
M et ho d of P ay m en t
M et ho d of P ay m en t
L im it
E st im at e
O ri gi na l
A m ou nt
A M
D
A
M D
A M
D
A
M D
A m ou nt
D ef in ed lo ad ed r at es fo r ea ch in ed lo ad ed r at es fo r cl as s/ pe rs on
/u ni t o f w or k
(L A
-4 cl as s/ pe rs on
/u ni t o f w or k
(L A
-4
L im it $2
,7
.0
$3
4, 1.
,3
.3
$0 .0
$0
.0
$2
,2
.6
$2
,7
.0
$3 4, 1.
,3
.3
$0
.0
$0 .0
$2
,2
.6
M et ho d of P ay m en t
M et ho d of P ay m en t
L im it
E st im at e
O ri gi na l
A m ou nt
A M
D
A
M D
A M
D
A
M D
A m in ed lo ad ed r at es fo r in ed lo ad ed r at es fo r s/ pe rs on
/u ni t o f w or k
(L A
-4 cl as s/ pe rs on
/u ni t o f w or k
(L A
-4
L im it $1
,3
.0
$0
.0
8.
$0 .0
$0
.0
$1
,2
.5
$1
,3
.0
$0 .0
8.
$0
.0
$0 .0
$1
,2
.5
M et ho d of P ay m en t
M et ho d of P ay m en t
L im it
E st im at e
O ri gi na l
A m ou nt
A M
D
A
M D
A M
D
A
M D
A m in ed lo ad ed r at es fo r in ed lo ad ed r at es fo r s/ pe rs on
/u ni t o f w or k
(L A
-4 cl as s/ pe rs on
/u ni t o f w or k
(L A
-4
L im it $1
,0
,0
.0
$0 .0
$0
.0
$0 .0
$1
,5
.0
$1
,1
,6
.0
A ct ua l E xp en di tu re s
(L A
-5
A ct ua l E xp en di tu re s
(L A
-5
L im it $3
1, 0.
$0 .0
$0
.0
$1 6, 7.
$9
,3
.0
$5 6, 4.
$1 ,0
,3
.0
$0
.0
$0 .0
$1
6, 7.
$1
,9
.0
$1 ,2
,5
.0
$1 ,6
,0
.2
T
O T
A L
M A
X
IM
U M
L
IM
IT
IN
G A
M O
U N
T T
O T
A L
M A
X
IM
U M
L
IM
IT
IN
G A
M O
U N
T T
O T
A L
M A
X
IM
U M
L
IM
IT
IN
G A
M O
U N
T
F in an ci al P ro je ct N um be r:
0- 1-
-0
F in an ci al
P ro je ct
N um be r:
0-
1-
-0
F in an ci al P ro je ct N um be r:
0- 1-
-0
C om pe ns at io n E le m en t
C om pe ns at io n E le m en t
D es cr ip ti on
C E
I S er vi ce s
Fi el d O ff ic e E xp en se s
Fi el d O ff ic e E xp en se s
SU
B
TO
TA
L
SU
B
TO
TA
L
C on tr ac t C om pe ns at io n Su m m ar y
T ab le C on tr ac t C om pe ns at io n
Su m m ar y T ab le
C on tr ac t C om pe ns at io n Su m m ar y
T ab le
T ab le
F in an ci al P ro je ct N um be r:
8- 1-
-0
F in an ci al
P ro je ct
N um be r:
8-
1-
-0
F in an ci al P ro je ct N um be r:
8- 1-
-0
C om pe ns at io n E le m en t
C om pe ns at io n E le m en t
D es cr ip ti on
C E
I S er vi ce s
F in an ci al P ro je ct N um be r:
7- 1-
-0
F in an ci al
P ro je ct
N um be r:
7-
1-
-0
F in an ci al P ro je ct N um be r:
7- 1-
-0
C om pe ns at io n E le m en t
C om pe ns at io n E le m en t
D es cr ip ti on
C E
I S er vi ce s
SU
B
TO
TA
L
File details come from the government source that posted it. Updated .