CN-550000-C9W27-S0010000.pdf
PDF 246 KB Posted
- Contract number
- BE980
- Issued by
- Florida
About this file
This document is an Amendment (Amendment No. 5) to a Standard Professional Services Agreement between the Florida Department of Transportation (FDOT) and Traffic Engineering Data Solutions, Inc. (TEDS), involving a project in Volusia County, specifically the City of Holly Hill. The amendment involves FDOT Contract C9W27 and is associated with Financial Project ID 438982-1-32-01, which covers US 1 Signals at 6th, 8th, Walker, and Flomich Streets in District Five.
The amendment increases the total maximum limiting amount of the contract by $30,530.00, raising the overall contract value from $660,973.00 to $691,503.00. The scope of services has been modified to include additional design efforts such as updating plans to current FDOT standards, roadway design revisions, utility coordination, and plan updates for signing, pavement marking, and signalization. The amendment also removes previously planned drainage plans and 3D modeling efforts. The contract involves multiple subconsultants, including Florida Bridge and Transportation, Inc., Quentin L. Hampton Associates, Inc., and NV5, Inc., each contributing specialized services to the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-BE980-00020000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-BE980.pdf.crdownload | CRDOWNLOAD file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District Five Professional Services Office, 719 South Woodland Blvd. MS 4-524, Deland, Florida 32720, (386) 943-5526, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
08/18
Amendment Number: 5 Amendment Execution Date:
Original Agreement No.: C9W27 Original Agreement Execution Date: 8/31/2017
Consultant Name: Traffic Engineering Data Solutions, Inc.
FM Number(s): 438982-1-32-01
Agreement Description: SR 5/ US-1 Intersections at 6th Street, 8th Street, Walker Street, Flomich Street, Volusia County, City of Holly Hill
Purpose of Amendment: Add Funds, Incorporate attachments to the contract
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $660,973.00 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $30,530.00. The revised total maximum limiting amount for all services is $691,503.00. The services specified in Exhibit “A”, Scope of Services of the original agreement are amended and attached as Exhibit "A".
The following attachments are hereby incorporated into this Amendment:
Exhibit “A”, Scope of Services, pages A-1 to A-3 Attachment No. 1: Summary of Contract Fees
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
Traffic Engineering Data Solutions, Inc.
Name of Consultant
BY: BY:
Name: Name: Loreen Bobo, P.E.
Title: Title: Director of Transportation Development
District Five
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
DocuSign Envelope ID: DB98057A-9DF3-4322-A5CB-1AAA8C9E65E5
Deanna F. Ferrell
President
9/25/2020 | 3:46 PM EDT
A- 1
August 25, 2020
EXHIBIT “A”
SCOPE OF SERVICES
FOR
FINANCIAL PROJECT ID. 438982-1-32-01
US 1 Signals at 6th, 8th, Walker and Flomich Streets
DISTRICT FIVE
VOLUSIA COUNTY
DocuSign Envelope ID: DB98057A-9DF3-4322-A5CB-1AAA8C9E65E5
A- 2
SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES
CONTRACT: Supplemental Agreement to FDOT Contract C-9W27
Financial Project ID: 438982-1-32-01
Federal Aid Project No.: D517-054-B
County Section No.: 79030
Description: US 1 Signals at 6th, 8th, Walker and Flomich Streets Holly Hill (Volusia County)
PURPOSE
The Department has requested additional design efforts for the purposes of updating the plans to current FDOT standards/specifications and taking the plans into production.
Additionally, the scope has been reduced to eliminate the preparation of drainage plans as well as 3D modeling.
Below is a detail breakdown of the scope:
TEDS:
PROJECT ACTIVITY: 3 (PROJECT GENERAL TASKS)
Coordinate and Meet with Local Agency. 2 Meeting with the City of Holly Hill.
Prepare the specifications package and contract maintenance efforts throughout extended contract for additional 16 months, and final project documentation and delivers.
PROJECT ACTIVITY: 4/5 (ROADWAY ANALYSIS/PLANS)
Roadway design efforts associated with revisions to the driveway in the northeast quadrant of 8th Street to accommodate changes requested during right of way negotiations. Update to TRNS*PRT. Field visit, review current standards, and update plans to reflect current FDOT standards.
PROJECT ACTIVITY: 6b (DRAINAGE PLANS)
Remove effort associated with Summary of Drainage Structures, Optional Pipe/Culvert Material, and Drainage Structure Sheets (and associated QA/QC and Supervision)
PROJECT ACTIVITY: 7 (UTILITIES)
A- 3
Full formal utility coordination to be conducted.
PROJECT ACTIVITY: 19/20 (SIGNING AND PAVEMENT MARKING
ANALYSIS/PLANS)
Review current standards and update plans to reflect current FDOT standards.
Plan revisions after plans submittal.
PROJECT ACTIVITY: 21/22 (SIGNALIZATION ANALYSIS/PLANS)
Field review, review current standards and update plans to reflect current FDOT standards.
Plan revisions after plans submittal. Update ITS plans based on as-builts.
PROJECT ACTIVITY: 36 (3D MODELING)
Remove 3D modeling efforts that were included in the original scope.
Original Contract through Am#4 This Am#5
Revised Contract
Totals
LUMP SUM
Basic Services (LS-2)
Traffic Engineering Data Solutions, Inc. $224,357.00 $20,325.00 $244,682.00
Florida Bridge and Transportation, Inc. $27,426.00 $0.00 $27,426.00
Inwood Consulting Engineers, Inc. $6,523.00 $0.00 $6,523.00
Southeastern Archeological Research, Inc. $14,245.00 $0.00 $14,245.00
Utility Coordination (LS-2)
Quentin L. Hampton Associates, Inc. $14,409.00 $10,205.00 $24,614.00
Control Survey Map (LS-2)
NV5, Inc. $30,984.00 $0.00 $30,984.00
Right of Map (LS-2)
NV5, Inc. $28,255.00 $0.00 $28,255.00
SUBTOTAL LUMP SUM AMOUNTS $346,199.00 $30,530.00 $376,729.00
Geotechnical Services (LA-4)
Universal Engineering Sciences, LLC $62,680.00 $0.00 $62,680.00
Legal Descriptions (LA-4)
NV5, Inc. $9,171.00 $0.00 $9,171.00
Supplemental Mapping (LA-4)
NV5, Inc. $4,064.00 $0.00 $4,064.00
Authorized- Design & R/W Survey (Field & Office Support) (LA-4)
NV5, Inc. $207,560.00 $0.00 $207,560.00
Supplemental- Design & R/W Survey (Field & Office Support) (LA-4)
NV5, Inc. $31,299.00 $0.00 $31,299.00
SUBTOTAL LIMITING AMOUNT $314,774.00 $0.00 $314,774.00
TOTAL MAXIMUM LIMITING AMOUNT $660,973.00 $30,530.00 $691,503.00
Attachment No. 1: Summary of Contract Fees
C9W27, Amendment No. 5
Contract Compensation Summary Table
LIMITING AMOUNTS
Financial Project ID No: 438982-1-32-01
File details come from the government source that posted it. Updated .