CN-550000-C9I00-00110000.pdf

PDF 56 KB Posted

Attached to
Master Agreement FL|CAV68|9d721dd07b85b21579e39d10633f9971
Contract number
CAV68
Issued by
Florida

About this file

This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT), District Seven, and awarded to AECOM Technical Services, Inc. The contract is specifically for Task Work Order No. 5 under Contract No. C9100, with a Financial Project Number of 436383-1-32-01, focusing on Express Lane Operations Documentation for the West Central Florida Gateway Express Lanes project.

The task work order is valued at $62,522.00 and requires AECOM to prepare comprehensive documentation for Express Lane operations, including business rules, incident management plans, Transportation Management Center standard operating guidelines, training materials, and maintenance agreements. The work is to be completed by February 15, 2020, and involves reviewing existing documentation, preparing operational guidelines for Intelligent Transportation Systems (ITS), Traffic Management Center (TMC), and incident management, and providing recommendations for future documentation requirements. The project aims to support the preparation and initiation of Express Lane operations scheduled to begin around June 2022.

View the file

Other files

File Type Posted
CN-550000-CAV68-00020000.pdf PDF
CN-550000-CAV68.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

06/17

Consultant:

Address:

Date:

3/5/2020

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

D. Buidens, W.C. Horn, D7FSContractDocs

$62,522.00

$0.00

(name) (title)

$62,522.00

District Wide Intelligent Transportation System (ITS) Support for Managed Lanes.

Total authorizations to date (including this one):

Departmental Approval:

$62,522.00 Estimate

Express Lane Operations Documentation

AECOM Technical Services, Inc.

7650 West Courtney Campbell Causeway Tampa, Florida 33607

Attention: Bruno Fiori, PE

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$62,522.00

(LA4) Units worked at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

Loaded Billing Rates

$596,011.00

(name) (title) Signature

Rebecca L. Schwarz Procurement Services Manager

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

C9I00 436383 1 32 01

G:\Professional Services\CONTRACT.398\436xxxx\43638313.201 C 9I00\TWO\5 TWO

DocuSign Envelope ID: C6BEFA2D-ABD5-46B5-A525-81F1E1E343AB

Bruno Fiori, PE Assoc. Vice President

June 21, 2019

ATTACHMENT “A”

SCOPE OF SERVICES

FOR

FINANCIAL PROJECT NUMBER:

436383-1-32-01

Contract # C9I00

TASK WORK ORDER NO. 5

Express Lane Operations Documentation

FLORIDA DEPARTMENT OF TRANSPORTATION

District Seven

Scope of Services

DocuSign Envelope ID: C6BEFA2D-ABD5-46B5-A525-81F1E1E343AB

FPN 436383-1-32-01

Contract No. C9100

Task Work Order No. 5

A-2

EXPRESS LANE OPERATIONS DOCUMENTATION

I. PURPOSE

Florida DOT District Seven requires necessary documentation to prepare and begin operations for the West Central Florida Gateway Express Lanes on or about June 2022.

II. OBJECTIVES

To include statewide guidelines and procedures along with District specific documentation for

Gateway and future EL projects based on prioritized recommendations from the State Managed

Lanes Engineer.

III. DESCRIPTION OF WORK

The CONSULTANT shall perform the following work:

a) Review current Express Lanes documentation and related materials

b) Prepare documentation required for ITS, TMC and Incident Management of Express Lanes operations.

c) Provide recommendations on future documentation requirements.

IV. DELIVERABLES

The CONSULTANT shall provide the following deliverables:

a) Business Rules - the document will outline and dictate operational parameters and goals for the EL system.

b) EL Incident Management Plan - the document will outline the EL incident management, operations, and communication guidelines between the Florida DOT District Seven, Florida’s Turnpike Enterprise and county/local agencies.

c) Transportation Management Center EL Standard Operating Guidelines (SOGs)/Training – the document will be added to existing SOGs that will include operational procedures, communications and coordination. Additionally, a supplemental training document will include requirements for TMC software (SunGuide/SELS).

d) Maintenance Agreements/Memorandums of Understanding (MOUs) – this will detail required documents between Florida DOT District Seven, express lane maintenance contractors and county/municipal operations to maintain ITS and related equipment.

FPN 436383-1-32-01

Contract No. C9100

Task Work Order No. 5

A-3

Note: All documents will be prepared with caveat that additional information, currently not available due to final design plans, will be required closer to the express lanes opening date.

This will be noted with recommendations as part of the deliverables.

V. SERVICES TO BE PROVIDED BY THE DEPARTMENT

The DEPARTMENT shall provide the following information to the CONSULTANT which is necessary to successfully complete this Task Work Order No. 5. This includes, but is not limited to:

a) Four meetings with project staff to review project plans and documents

b) Tampa Bay Express Regional Concept of Operations

c) District Seven Transportation Management Center Standard Operating Procedures

d) District Seven Road Rangers Standard Operating Procedures

e) District Seven Express Lanes Traffic and Revenue Study

f) Gateway Expressway and Tampa Bay Express Segment 2 Project Map Access Points

g) FHP Hireback contract (Sunshine Skyway)

h) Operations & Maintenance Repair and Replacement Plan

i) Pinellas County US 19 Corridor signals, ITS and asset maintenance agreement(s)

VI. LENGTH OF SERVICES

All work authorized under this Task Work Order No. 5 is to be completed, unless otherwise authorized by the DEPARTMENT, by February 15, 2020.

File details come from the government source that posted it. Updated .