CN-550000-C9G84-00110000.pdf
PDF 653 KB Posted
- Contract number
- C9F41
- Issued by
- Florida
About this file
This document is a Task Work Order Amendment Form from the State of Florida Department of Transportation (FDOT) for professional services, specifically Amendment No. 2 to Task Work Order No. 2. The contract involves Camahan-Proctor-Cross, a consulting firm located in Deerfield Beach, Florida, with a contract number of C9G84. The amendment is related to a BOPS Construction Support project, with Tamayo Engineering listed as a sub-contractor.
The amendment extends funding for Task Work Order #2 through 12-31-15, specifically for a CEI (Construction Engineering and Inspection) Project Administrator to assist BOPS. The total amendment amount is $59,587.45, which covers salary-related costs, operating margin, and various overhead expenses. The document details a personnel change for Andy Poerio, with a full-time assignment from 7/1/2015 to 12/31/2015. The cost breakdown includes a raw salary of $26,753.22, field office overhead of $19,861.59, and other associated costs. The total contract authorization to date, including this amendment, is $298,930.24.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9F41-00020000.pdf | ||
| CN-550000-C9F41-00040000.pdf | ||
| CN-550000-C9F41-00050000.pdf | ||
| CN-550000-C9F41-00060000.pdf | ||
| CN-550000-C9F41-S0010000.pdf | ||
| CN-550000-C9F41.pdf | ||
| CN-550000-C9F41-00010000.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .