This document is an Amendment (Amendment No. 7) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Jacobs Engineering Group Inc. The amendment pertains to the original contract C-9G50, which was initially executed on September 18, 2014, and involves professional services for the I-95 Design Build Construction Engineering and Inspection (CEI) project in Volusia County, Florida.
The amendment increases the total maximum limiting amount of the contract by $591,857.00, bringing the revised total to $11,361,982.00. The additional funds are specifically allocated to Financial Project No. 242715-2-62-01, with zero additional funds for the other two project numbers. The amendment extends the time period for completion of basic project services through June 30, 2019, and incorporates Attachment No. 1: Summary of Compensation. The contract covers CEI services for the I-95 widening project from SR 44 to North of US 92, including the I-4/US 92 Interchange, with costs broken down into categories such as salary-related costs, fixed fee/operating margin, and photogrammetry services.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District Five Professional Services Office, 719 South Woodland Blvd. MS 4-524, Deland, Florida 32720, (386) 943-5526, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
09/17
Amendment Number: 7 Amendment Execution Date:
Original Agreement No.: C-9G50 Original Agreement Execution Date: September 18, 2014
Consultant Name: Jacobs Engineering Group Inc.
FM Number(s): 242715-2-62-01, 242715-6-62-01, 242715-2-62-04
Agreement Description: I-95 Design Build CEI: I-95 Widening from SR 44 to North of US 92 Including I-4/US 92 Interchange
Purpose of Amendment: Add Funds, Time Extension, Incorporate attachments to the contract
The terms of the original agreement referenced above are hereby amended:
The total maximum limiting amount of $10,770,125.00 for all services required under the original agreement and all supplements and amendments thereto is herein increased by $591,857.00. The revised total maximum limiting amount for all services is $11,361,982.00. The services specified in Exhibit “A”, Scope of Services of the original agreement shall remain unchanged.
Financial Project No. Amount
242715-2-62-01 $591,857.00
242715-6-62-01 $0.00 242715-2-62-04 $0.00
Section 2.B. of the Standard Professional Services Agreement is revised to extend the time period for completion of basic project services through 06/30/2019.
The following attachments are hereby incorporated into this Amendment:
Attachment No. 1: Summary of Compensation
Except as hereby modified, amended, or changed, all of the terms and conditions of said original agreement and any supplements and amendments thereto will remain in full force and effect.
DocuSign Envelope ID: 0A91D9D1-7E62-4CE7-81E5-257C0AE79022
12/13/2018 | 11:00 AM EST
District Five Professional Services Office, 719 South Woodland Blvd. MS 4-524, Deland, Florida 32720, (386) 943-5526, www.fdot.gov
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
AMENDMENT TO
STANDARD PROFESSIONAL SERVICES AGREEMENT
375-030-97
PROCUREMENT
09/17
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written.
CONSULTANT STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
Jacobs Engineering Group Inc.
Name of Consultant
BY: BY:
Name: Name: Alan E. Hyman, P.E.
Title: Title: Director of Transportation Operations
District Five
FOR DEPARTMENT USE ONLY
PROCUREMENT OFFICE REVIEW: LEGAL OFFICE REVIEW:
Procurement Office Legal Office
DocuSign Envelope ID: 0A91D9D1-7E62-4CE7-81E5-257C0AE79022
Vinay Uchil
Division VP
Contract C-9G50
County:
Project:
I-95 Design Build CEI:I-95 Widening from SR 44 to North of US 92 Including I- 4/US 92 Interchange
I-95 Restoration of Ditches/Erosion
Control-Hurricane Matthew
I-95 Restoration of Ditches/Erosion
Control-Hurricane Irma
Contract Total
Financial Project ID No.: 242715-2-62-01 242715-6-62-01 242715-2-62-04
FAP # 0954-1401
CEI Services (Civil) - Salary Related Cost* (LA-3)
Jacobs Engineering Group, Inc., Infrastructure Engineers, LLC, Elipsis Engineering & Consulting, Civil/Site Engineering, Inc., Carnahan Proctor and Cross, Inc., PI Consulting Services, LLC, Mehta and Associates, Inc., Interra, Inc. 9,217,591$ 58,703$ 44,264$ 9,320,558$ Fixed Fee/Operating Margin (LS-12)
Jacobs Engineering Group, Inc., Infrastructure Engineers, LLC, Elipsis Engineering & Consulting, Civil/Site Engineering, Inc., Carnahan Proctor and Cross, Inc., PI Consulting Services, LLC, Mehta and Associates, Inc., Interra, Inc. 1,408,394$ 8,941$ 7,430$ 1,424,765$ Photogrammetry (LA-4)#
Smith Aerial 24,802$ -$ -$ 24,802$
TOTAL MAXIMUM LIMITING AMOUNT 10,650,787$ 67,644$ 51,694$ 10,770,125$
County:
I-95 Design Build CEI:I-95 Widening from SR 44 to North of US 92 Including I- 4/US 92 Interchange
I-95 Restoration of Ditches/Erosion
Control-Hurricane Matthew
I-95 Restoration of Ditches/Erosion
Control-Hurricane Irma
Contract Total
Financial Project ID No.: 242715-2-62-01 242715-6-62-01 242715-2-62-04
FAP # 0954-1401
CEI Services (Civil) - Salary Related Cost* (LA-3)
Jacobs Engineering Group, Inc., Infrastructure Engineers, LLC, Elipsis Engineering & Consulting, Civil/Site Engineering, Inc., Carnahan Proctor and Cross, Inc., PI Consulting Services, LLC, Mehta and Associates, Inc., Interra, Inc. 507,884$ -$ - 507,884$ Fixed Fee/Operating Margin (LS-12)
Jacobs Engineering Group, Inc., Infrastructure Engineers, LLC, Elipsis Engineering & Consulting, Civil/Site Engineering, Inc., Carnahan Proctor and Cross, Inc., PI Consulting Services, LLC, Mehta and Associates, Inc., Interra, Inc. 83,972$ -$ - 83,972$ Photogrammetry (LA-4)# Smith Aerial -$ -$
TOTAL MAXIMUM LIMITING AMOUNT 591,857$ -$ - 591,857$
County:
Project:
I-95 Design Build CEI:I-95 Widening from SR 44 to North of US 92 Including I- 4/US 92 Interchange
I-95 Restoration of Ditches/Erosion
Control-Hurricane Matthew
I-95 Restoration of Ditches/Erosion
Control-Hurricane Irma
Contract Total
Financial Project ID No.: 242715-2-62-01 242715-6-62-01 242715-2-62-04
FAP # 0954-1401
CEI Services (Civil) - Salary Related Cost* (LA-3)
Jacobs Engineering Group, Inc., Infrastructure Engineers, LLC, Elipsis Engineering & Consulting, Civil/Site Engineering, Inc., Carnahan Proctor and Cross, Inc., PI Consulting Services, LLC, Mehta and Associates, Inc., Interra, Inc. 9,725,475$ 58,703$ 44,264$ 9,828,442$ Fixed Fee/Operating Margin (LS-12)
Jacobs Engineering Group, Inc., Infrastructure Engineers, LLC, Elipsis Engineering & Consulting, Civil/Site Engineering, Inc., Carnahan Proctor and Cross, Inc., PI Consulting Services, LLC, Mehta and Associates, Inc., Interra, Inc. 1,492,366$ 8,941$ 7,430$ 1,508,737$ Photogrammetry (LA-4)# Smith Aerial 24,802$ -$ -$ 24,802$
TOTAL MAXIMUM LIMITING AMOUNT 11,242,644$ 67,644$ 51,694$ 11,361,982$
LA = Limiting Amount and LS = Lump Sum
*includes Direct Labor, Straight Overtime, Overhead, FCCM, Expenses, and Premium Overtime (if applicable) # Indicates an estimated, non-binding limit which is provided for project management purposes.
Original Contract and Previous Amendments
Revised Contract Totals to Date
This Amendment 7
Attachment No. 1: Summary of Compensation
Volusia
Volusia
Volusia
DocuSign Envelope ID: 0A91D9D1-7E62-4CE7-81E5-257C0AE79022
File details come from the government source that posted it. Updated .