CN-550000-C9C78-00040000.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|C9C78|0acb0a12fe5f90b2e221b50562eb2a31
Contract number
C9C78
Issued by
Florida

About this file

This document is a Task Work Order (TWO) No. 3 issued by the Florida Department of Transportation (FDOT) to CDM Smith, Inc. for the Districtwide Transportation Corridor Planning Consultant Services contract (C-9C78). The task work order is specifically for a Strategic Intermodal System (SIS) Intracoastal Waterway Study in District Three, focusing on the Gulf Intracoastal Waterway (GIWW) from Apalachee Bay to the Florida Alabama State line west of Pensacola.

The contract authorizes CDM Smith to conduct a comprehensive study of the waterway system, with a total authorized amount of $60,348.48. The scope of work includes project management, data assembly and review, evaluation of existing waterway conditions, identifying waterway issues and needed improvements, and analyzing proposed alternatives. Key deliverables include monthly progress reports, stakeholder meeting documentation, existing data summaries, graphical exhibits of waterway influences, maps of proposed improvements, and a final study report with recommended enhancement concepts. The study is expected to be completed within 8 to 12 months after the Notice to Proceed, with the consultant being compensated through a lump sum fee based on staff-hours and approved loaded salary rates.

View the file

Other files

File Type Posted
CN-550000-C9C75-S0060000.pdf PDF
CN-550000-C9C78-00050000.pdf PDF
CN-550000-C9C78.pdf PDF
CN-550000-C9C75.pdf PDF
CN-550000-C9C78-00020000.pdf PDF
CN-550000-C9C78-00030000.pdf PDF
CN-550000-C9C78-00060000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .