This document is an Amendment (No. 6) to a Standard Professional Services Agreement between the State of Florida Department of Transportation and Cardno, Inc., with additional subcontractors including Environmental Management & Design, Inc., Vanasse Hangen Brustlin, Inc., and Moffatt & Nichol, Inc. The amendment relates to the SR 25 (US 441) transportation project located from North of NW 35th Street to North of CR 25A in Marion County, Florida, with the original contract dated November 19, 2012.

The amendment adds Post Design Services to the existing contract, with a limiting amount of $22,396.00, which increases the total Maximum Limiting Amount to $864,647.00. The services include construction assistance, engineering support, and shop drawing reviews for the transportation project. Compensation is structured with both lump sum and limiting amount categories, covering basic services, utility coordination, SUE/Survey, and salary-related costs. The amendment breaks down compensation across different project phases (Phase 32 Design Services and Phase 62 Post Design Services) and includes detailed rate tables for various job classifications with specific hourly rates for roles such as Project Manager, Chief Engineer, Senior Engineer, and other technical positions.

View the file

Other files

File Type Posted
CN-550000-C9869-00020000.pdf PDF
CN-550000-C9869-00030000.pdf PDF
CN-550000-C9869-00040000.pdf PDF
CN-550000-C9869-00050000.pdf PDF
CN-550000-C9869-00060000.pdf PDF
CN-550000-C9869-00070000.pdf PDF
CN-550000-C8858.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C8858-S0030000.pdf PDF
CN-550000-C9869-S0020000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This Amendment No. 6 Revised Totals

Phase 32 Design Services Financial Project Number 427280-1-32-02 427280-1-32-01 427280-1-62-01

LUMP SUM

Basic Services* (LS-2) Cardno, Inc. (Prime) $305,927.00 $103,751.00 $0.00 $409,678.00 Environmental Management & Design, Inc. (sub) $15,649.00 $4,476.00 $0.00 $20,125.00 Vanasse Hangen Brustlin, Inc. (sub) $44,768.00 $24,385.00 $0.00 $69,153.00 Moffatt & Nichol, Inc. (sub) $34,410.00 $4,846.00 $0.00 $39,256.00 Utility Coordination* (LS-2) Cardno, Inc. (Prime) $21,971.00 $0.00 $0.00 $21,971.00

Total Lump Sum Amount $422,725.00 $137,458.00 $0.00 $560,183.00

LIMITING AMOUNTS

SUE/Survey (LA-4) Cardno, Inc. $109,691.00 $156,355.00 $0.00 $266,046.00 Geotechnical Services (LA-4) Geotechnical and Environmental Consultants, Inc. (sub) $16,022.00 $0.00 $0.00 $16,022.00

Total Limiting Amount $125,713.00 $156,355.00 $0.00 $282,068.00 Total Phase 32 Limiting Amount $548,438.00 $293,813.00 $0.00 $842,251.00

Phase 62 Post Design Services Revised Totals Financial Project Number -------- -------- 427280-1-62-01

LUMP SUM

Fixed Fee (LS-12) Cardno, Inc. (Prime) $0.00 $0.00 $1,429.00 $1,429.00 Vanasse Hangen Brustlin, Inc. (sub) $0.00 $0.00 $405.00 $405.00 Moffatt & Nichol, Inc. (sub) $0.00 $0.00 $212.00 $212.00

Total Lump Sum Amount $0.00 $0.00 $2,046.00 $2,046.00

LIMITING AMOUNTS

Salary Related Costs (LA-3) Cardno, Inc. (Prime) $0.00 $0.00 $14,267.00 $14,267.00 Vanasse Hangen Brustlin, Inc. (sub) $0.00 $0.00 $4,007.00 $4,007.00 Moffatt & Nichol, Inc. (sub) $0.00 $0.00 $2,076.00 $2,076.00

Total Limiting Amount $0.00 $0.00 $20,350.00 $20,350.00 Total Phase 62 Limiting Amount $0.00 $0.00 $22,396.00 $22,396.00

TOTAL MAXIMUM LIMITING AMOUNT $548,438.00 $293,813.00 $22,396.00 $864,647.00

Attachement No. 1: Summary of Compensation C-9869, Amendment No. 6

Original Agreement and Previous Amendments

* includes FCCM, Operating Margin, Overhead and Direct Expense %

C9869 Amendment 6 executed
C9869 Am 6 Summary of Contract Fees - Revision w one FPN

File details come from the government source that posted it. Updated .