CN-550000-C9701-00110000.pdf
PDF 764 KB Posted
- Contract number
- C9B46
- Issued by
- Florida
About this file
This document is a Task Work Order (No. 15) issued under the Districtwide Traffic Safety Studies Contract for District Two of the Florida Department of Transportation (FDOT). The task work order is issued to a consulting firm and involves a specific traffic safety and lane reduction feasibility study for a section of SR 117 (Norwood Avenue) from Alder Street to North Shore Drive in section 72150000 MP 0.747 to MP 1.807.
The task work order details a comprehensive safety and lane reduction study with multiple components, including 8-hour traffic and pedestrian counts, crash analysis, operational analysis for arterials and networks, and miscellaneous services. The total contracted amount is $23,110.96, with the study focusing on converting an existing 4-lane cross section to a 2-lane section with a two-way left-turn lane. The analysis will include AM and PM 8-hour turning movement counts at six signalized intersections, data collection using FDOT Traffic Online Synopsis station counts, and level of service analysis using Synchro software. The study aims to evaluate potential pedestrian refuge islands, bicycle lanes, and intersection performance under existing and future traffic volume conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9B46-00030000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-C9B46-00050000.pdf | ||
| ContractDeliverablesExport.csv | CSV file | |
| CN-550000-C9B46-00020000.pdf | ||
| CN-550000-C9B46-00040000.pdf | ||
| CN-550000-C9B46-00060000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .