CN-550000-C9532-S0010200.pdf

PDF 53 KB Posted

Attached to
Master Agreement FL|DMY06|fb4fb3cbb6b032ebb87ade95109538e3
Contract number
DMY06
Issued by
Florida

About this file

This document is a Certification of Completion Agreement between the State of Florida Department of Transportation and Bayside Engineering, Inc., located in Tampa, Florida. The agreement was executed on the 16th day of July 2014, involving a specific transportation infrastructure project related to SR 60/SR 65/Court St. from E. of Missouri Ave. to W. of SR 60/Gulf to Bay Blvd.

The contract's total value was $403,194.00, with $357,712.01 already paid, leaving a final de-encumbered amount of $45,481.99. The project was 100% complete as of March 20, 2012, with the consultant (Bayside Engineering, Inc.) entitled to the full contracted fee. The document confirms that all financial obligations have been satisfied, with zero balance remaining due, and serves as a formal closure of the contractual engagement between the State of Florida Department of Transportation and the consulting engineering firm.

View the file

Other files

File Type Posted
CN-550000-DMY06-S0010000.pdf PDF
CN-550000-DMY06.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .