CN-550000-C9439-00040000.pdf

PDF 181 KB Posted

Attached to
Master Agreement FL|C9439|e294459108633cfa0495c1279eeee9eb
Contract number
C9439
Issued by
Florida

About this file

This document is a Memorandum of Agreement No. 1 between the Florida Department of Transportation (FDOT) and Ayres Associates, Inc., located in Tampa, Florida. The agreement involves multiple subconsultants: Baslee Engineering Solutions, Inc. (DBE), Ocean Engineering Associates, Inc., and Hyatt Survey Services, Inc. The contract is specifically related to the SR 60 (Courtney Campbell Causeway) project from Bayshore Boulevard to East of Tampa Bay Bridge, with the contract number C-9439.

The memorandum outlines the compensation method, detailing current unloaded direct labor rates for various job classifications across the primary consultant and subconsultants. These rates range from $16.00 for Secretary/Clerical positions to $89.00 for Chief Engineers, with the understanding that overhead, operating margin, FCCM, and expenses will be added to these base rates in accordance with Section 2.2 of the contract. The invoicing will be restricted to the unloaded direct labor rates identified in the attachment, and the agreement establishes the billing structure for the project, allowing the consultant and subconsultants to invoice at their current rates without escalation.

View the file

Other files

File Type Posted
CN-550000-C9439-00020000.pdf PDF
CN-550000-C9439-00050000.pdf PDF
CN-550000-C9439-00060000.pdf PDF
CN-550000-C9439-00070000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9439-00030000.pdf PDF
CN-550000-BDV84-W0040000.pdf PDF
CN-550000-C9439-00010000.pdf PDF
CN-550000-C9439-00080000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .