CN-550000-C9439-00040000.pdf
PDF 181 KB Posted
- Contract number
- C9439
- Issued by
- Florida
About this file
This document is a Memorandum of Agreement No. 1 between the Florida Department of Transportation (FDOT) and Ayres Associates, Inc., located in Tampa, Florida. The agreement involves multiple subconsultants: Baslee Engineering Solutions, Inc. (DBE), Ocean Engineering Associates, Inc., and Hyatt Survey Services, Inc. The contract is specifically related to the SR 60 (Courtney Campbell Causeway) project from Bayshore Boulevard to East of Tampa Bay Bridge, with the contract number C-9439.
The memorandum outlines the compensation method, detailing current unloaded direct labor rates for various job classifications across the primary consultant and subconsultants. These rates range from $16.00 for Secretary/Clerical positions to $89.00 for Chief Engineers, with the understanding that overhead, operating margin, FCCM, and expenses will be added to these base rates in accordance with Section 2.2 of the contract. The invoicing will be restricted to the unloaded direct labor rates identified in the attachment, and the agreement establishes the billing structure for the project, allowing the consultant and subconsultants to invoice at their current rates without escalation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9439-00020000.pdf | ||
| CN-550000-C9439-00050000.pdf | ||
| CN-550000-C9439-00060000.pdf | ||
| CN-550000-C9439-00070000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-C9439-00030000.pdf | ||
| CN-550000-BDV84-W0040000.pdf | ||
| CN-550000-C9439-00010000.pdf | ||
| CN-550000-C9439-00080000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .