This is a Standard Professional Services Agreement between the State of Florida Department of Transportation and Scheda Ecological Associates, Inc., a consulting firm. The contract involves multiple subconsultants including AIM Engineering & Surveying, Inc., Boylan Environmental Consultants, Inc., ICON Consultant Group, Inc., Janicki Environmental, Inc., MC Squared, Inc., Professional Services Industries, Inc., and Test America, Inc. The agreement is for District Wide Environmental Permit Design Support services, with a contract number of C9336 and a Financial Project Identification Number of 198231 1-32-07.
The contract establishes a task assignment type agreement with a Total Maximum Limiting Amount of $1,500,000, with individual task assignments not to exceed $300,000. Currently, only $350,000 has been approved. The services include environmental permit design support, jurisdictional determinations, environmental mitigation, resource permitting, wildlife surveys, drainage design, and related technical services. Compensation will be based on loaded billing rates for various professional levels (such as Chief Scientist, Senior Scientist, Engineers) with no multipliers applied. The agreement allows for task work orders to be individually funded, and the state's performance is contingent upon annual legislative appropriations. The contract was executed on August 29, 2011, with a base term of 5 years and provisions for task-specific work assignments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-E4Q76-00110000.pdf | ||
| CN-550000-C9336-00020000.pdf | ||
| CN-550000-C9336-W0010000.pdf | ||
| CN-550000-C9336-W0020000.pdf | ||
| CN-550000-C9336-W0030000.pdf | ||
| ContractBudgetExport.csv | CSV file | |
| CN-550000-C9336-00030000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-1
METHOD OF COMPENSATION
EXHIBIT “B”
FPID: 198231 1 32 07
1.0 PURPOSE
This exhibit defines the method and limits of compensation to be made to the Consultant for the services described in Exhibit "A" (Scope of Services) and method by which payments will be made.
2.0 COMPENSATION
For satisfactory completion of services authorized under this agreement, the Department will pay the Consultant a
Total Maximum Limiting Amount not to exceed $1,500,000. This is a task assignment type agreement. The
Department will furnish the Consultant a task work order specifying the services to be performed and the fees to be paid for each project assigned under this agreement. Compensation for individual assignments will not exceed
$300,000.
The total amount of this agreement is expected to be funded by multiple annual appropriations. The State of
Florida’s performance and obligation to pay under this contract is contingent upon an annual appropriation by the
Legislature. Currently only $350,000 of the total amount has been approved. Therefore, it is agreed that the
Consultant will not be obligated to perform services nor incur costs which would result in exceeding the funding currently approved, nor will the Department be obligated to reimburse the Consultant for costs or make fee payments in excess of currently established funding. The Department will provide written authorization when appropriations for subsequent fiscal years are available for this project.
This Agreement allows for Task Work Orders to be individually funded. When funds are encumbered by the Task
Work Order a specific Financial Project Number and dollar amount shall be identified on the Task Work Order.
The Consultant shall invoice under the specific Financial Project Number.
2.1 Summary of Compensation
Fees for each task work order will be negotiated either as a lump sum amount, a limiting amount, or as a combination lump sum and limiting amount. Where limiting amount fees are established, compensation will be in accordance with Section 2.2. Compensation for appropriate and reasonable direct expense costs may be included in task work order fees.
The above-defined elements of this Agreement do not involve the purchase of Tangible Personal Property, as defined in section 273.02 Florida Statutes.
2.2 Details of Compensation
LUMP SUM ELEMENTS:
Lump Sum Tasks (LS 2)
The Consultant will receive progress payments for services based on the percentage of services that have been completed and accepted by the Department during the billing period.
B-2
LIMITING AMOUNT ELEMENTS
For the following elements, which are established as limiting amounts, the Department will compensate the
Consultant for all reasonable, allocable and allowable costs incurred. The reasonableness, allocability and allowability of compensation sought under this agreement is expressly made subject to the terms of this
Agreement; Federal Acquisition Regulations; Office of Management and Budget Circulars A-21, A-87, A-102, A-110; and any pertinent Federal and State Law.
Salary & Salary Related Costs
Salary Costs: (LA 4)
Subject to the established limiting amount, the Consultant will receive progress payments for direct salaries and wages for time expended by personnel in the performance of authorized work during the billing period at the rates specified in Table 6 of Section 5.0. No multipliers will be applied to these rates.
Geotechnical, Materials & Testing, Subsurface Utility Services, Survey Crew: (LA 4)
Subject to the established limiting amount, the Consultant will be compensated for these services based on the rates provided in Table 6 of Section 5.0. No multipliers will be applied to these rates. Payment for such services will be based on approved time incurred during the billing period. Where the time units are in days, the rate will be prorated when less than a day is used. Time for excess travel will not be included as time worked. These rates include allowances for salaries, overhead, operating margin, direct expenses and FCCM if applicable. The survey party day rate is defined as compensation for an eight (8) hour workday, which consists of seven (7) hours actual survey time plus allowed two-way travel time of thirty (30) minutes each way. If travel time is not required, the Department expects eight (8) hours of actual survey time.
3.0 INVOICING PROCEDURE
The Consultant will be eligible for progress payments under this agreement at intervals not less than monthly or when individual tasks or mileposts defined in this agreement are completed or reached.
Invoices for this agreement will be prepared by the Consultant and submitted through the Department’s Consultant
Invoice Transmission System. The invoices will be supported by such information as may be required by
Department procedures to substantiate the charges being invoiced. The Consultant will maintain for this purpose a job cost accounting system that is acceptable to the Department.
If requested by the Department, the final invoice for this agreement will be accompanied by a certified job cost summary report generated by the accounting system. The report will include at a minimum the total number of hours and salary cost actually charged to the project, the total direct vehicle expense, the total miscellaneous direct expense, and total sub-consultant cost charged to the project.
Monthly, at the time of invoice submittal, the Consultant will report sub-consultant payments through the
Department’s Equal Opportunity Reporting System on the Internet. Failure to submit a properly completed report may be cause for rejection of the invoice. Within thirty days after receipt of final payment, the Consultant will submit a final sub-consultant payment report. The Consultant will pay all sub-consultants their proportionate share of payments received from the Department within thirty days of the Consultant’s receipt of payment from the
Department.
The Department will render a decision on the acceptability of services within five (5) working days of receipt of either the services or invoice, which ever is later. The Department reserves the right to withhold payments for work
B-3 not completed, or work completed unsatisfactorily, or work that is deemed inadequate or untimely by the
Department. Any payment withheld will be released and paid to the Consultant promptly when work is subsequently performed.
4.0 PROJECT CLOSEOUT
4.1 Final Audit
If requested, the Consultant will permit the Department to perform or have performed, an audit of the records of the Consultant and any or all sub-consultants to support the compensation paid the Consultant.
The audit will be performed as soon as practical after completion and acceptance of the contracted services.
In the event funds paid to the Consultant under this Agreement are subsequently properly disallowed by the Department because of accounting errors, or charges not in conformity with this Agreement, the
Consultant agrees that such disallowed funds are due to the Department upon demand. Further, the
Department will have the right to deduct, from any payment due the Consultant under any other contract, any amount due the Department.
4.2 Certificate of Completion
A Certificate of Completion will be prepared for execution by both parties stating the total compensation due the Consultant, the amount previously paid, and the difference.
Upon execution of the Certification of Completion, the Consultant will either submit a termination invoice for an amount due or refund to the Department for the overpayment, provided the net difference is not zero.
5.0 COMPENSATION RATES
The following tables are provided for definition of contractual rates. Table numbers not listed are not included in this document.
Table 6 - Loaded Billing Rates
B-4
Table 6
LOADED BILLING RATES
No Multipliers will be added to the following rates.
Consultant Item Unit
Billing Rate
Scheda Ecological
Associates, Inc. (DBE)
Chief Scientist
Hour $150.65
Senior Scientist
Hour $111.44
Environmental Specialist
Hour $79.54
Engineering Technician
Hour $60.26
GIS Specialist
Hour $82.55
Secretary/Clerical
Hour
$57.00
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
LOADED BILLING RATES
Aim Engineering &
Surveying, Inc.
Chief Engineer
Hour $210.71
Senior Engineer
Hour $140.46
Hour $103.00
Engineer
Hour $85.07
Surveyor & Mapper
Hour $117.72
Survey Technician
Hour $73.83
CADD/Computer Technician
Hour $81.10
2 Person Survey Crew (day)
Day $750.24
2 Person Survey Crew (hour)
Hour $93.78
3 Person Survey Crew (day)
Day $1,020.40
3 Person Survey Crew (hour)
Hour $127.55
4 Person Survey Crew (day)
Day $1,290.56
4 Person Survey Crew (hour)
Hour $161.32
5 Person Survey Crew (day)
Day $1,560.72
5 Person Survey Crew (hour)
Hour $195.09
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
B-5
LOADED BILLING RATES
ICON Consultant Group, Inc. (DBE)
Hour $186.57
Hour $142.06
Project Engineer
Hour $107.43
Engineer
Hour $101.78
Engineering Intern
Hour $83.76
Hour $57.30
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
Janicki Environmental, Inc.
<$250,000 on this contract
Hour $150.25
Hour $111.19
Scientist
Hour $75.72
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
MC Squared, Inc. (DBE)
Hour $204.98
Hour $158.00
Geotechnical Engineer
Hour $128.04
Project Manager
Hour $169.00
Geotechnical Technician
Hour $48.92
CADD/Computer Technician
Hour $62.82
Hour $57.00
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
B-6
LOADED BILLING RATES
No Multipliers will be added to the following rates.
Consultant Item Unit Unit
Price
MC Squared, Inc.
Flagmen & Barricades (Barricades / MOT) Day $900.00
Visual Examination/Stratify (1 set = 5 feet) Set $4.00
Natural Moisture Content Tests Test $9.00
Grain-Size Analysis (Full Gradation) Test $60.00
Organic Content Tests Test $38.00
Atterberg Limit Tests Test $90.00
Environmental Tests (pH, sulfates, chlorides, resistivity) Test $150.00
Limerock Bearing Ratio Test Test $325.00
Consolidation Tests Test $450.00
Specific Gravity Test $62.00
Tri-axial Compression (per point) Test $150.00
Split Tension Test Test $110.00
Unconfined Compression Test Test $100.00
Single Sieve Analyses Test $40.00
Unit Weight Determination Test $33.00
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
Test America, Inc. To be negotiated per task
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
Boylan Environmental
Consultants, Inc.
<$250,000 on this contract
Hour $125.00
Hour $115.00
Scientist
Hour $80.79
GIS Specialist
Hour $84.00
The above rates include allowances for salaries, overhead, operating margin, direct expenses, and FCCM if applicable.
B-7
LOADED BILLING RATES
Professional Service
Industries, Inc.
2.1.a Truck Rig Mob (Hardee, Polk, Manatee, Sarasota)
Each $365.49
2.1.b Truck Rig Mob (De, Gl, Hi, Ok, Ch and Lee)
Each $506.04
2.1.c Truck Rig Mob (Hendry and Collier)
Each $607.59
2.2.a ATV/Mudbug Mob (Hardee, Polk, Manatee, Sarasota)
Each
$556.71
2.2.b ATV/Mudbug Mob (De, Gl, Hi, Ok, Ch, and Lee)
Each $674.69
2.2.c ATV/Mudbug Mob (Hendry and Collier)
Each $787.16
2.3 Auger Boring
Foot $10.28
2.4.1 SPT Borings (0-50 feet)
Foot $12.51
2.4.2 SPT Borings (50-100 feet)
Foot $16.64
2.4.3 SPT Borings (100-150 feet)
Foot $30.63
2.5.1 Grout Bore Holes (0-50 feet)
Foot $4.98
2.5.2 Grout Bore Holes (50-100 feet)
Foot $6.78
2.5.3 Grout Bore Holes (100-150 feet)
Foot $9.96
2.6.1 Casing (0-50 feet)
Foot $8.37
2.6.2 Casing (50-100 feet)
Foot $9.96
2.6.3 Casing (100-150 feet)
Foot $11.87
2.7.1 Rock Cores (0-50 feet)
Foot $36.89
2.7.2 Rock Cores (50-100 feet)
Foot $50.14
2.7.3 Rock Cores (100-150 feet)
Foot $55.76
2.8.1 Monitor Well Installation (0-25 feet)
Foot $41.76
2.8.2 Monitor Well Installation (25-50 feet)
Foot $46.00
2.8.3 Monitor Well Installation (50-75 feet)
Foot $58.51
2.8.4 Monitor Well Installation (75-100 feet)
Foot $75.15
2.9 Monitor Well Permit Cost
Each $76.32
B-8
LOADED BILLING RATES
Industries, Inc. (continued)
2.10 Push Wells (0-50 feet)
Foot $29.26
2.11 Install Flush Mount Well Covers
Each $250.00
2.12 Misc Drilling Services
Hour $159.85
2.13 Support Vehicle
Day $153.96
2.14 Pavement Cores (w/out MOT)
Each $110.03
2.15 Groundwater Sample Kit
Day $250.00
2.16 Geophysical Investigations (GPR)
Day $2,000.00
2.17 Attenuator Truck
Day $764.26
2.18 CPT Borings (0-100 feet)
Foot $12.51
3.1 Grain Size Analysis w/Hydrometer
Each $124.97
3.2 Full Gradation
Each $66.89
3.3 Single Sieve
Each $41.76
3.4. D50 Sieve Analyses
Each $80.98
3.5 Atterberg Limits
Each $81.94
3.6 Moisture Content Tests
Each $8.37
3.7 Loss on Ignition Organic Content Tests
3.8 West Combustion Organic Content Tests
3.9 Specific Gravity Tests
Each $65.08
3.10 LBR Tests
Each $332.42
3.11 Consolidation Tests
Each $491.31
3.12 Triaxial Compression Tests
Each $151.69
3.13 Unconfined Compression Tests (Soil)
Each $83.42
3.14 Unconfined Compression Tests (Rock)
Each $120.10
3.15 Corrosion Series
Each $158.36
3.16 Standard Water Quality (EPA 8260/8270)
Each $350.00
B-9
LOADED BILLING RATES
Industries, Inc. (continued)
3.17 Standard Proctor Compaction Test (FM5-525)
Each $99.96
3.18 Modified Proctor Compaction Test (FM5-521)
Each $99.96
3.19 Relative Density Maximum (ASTM D-4253)
Each $245.71
3.20 Relative Density Minimum (ASTM D-4254)
Each $245.71
3.21 Analysis of Extracted Aggregate (FM 1-T030)
Each $55.33
3.22 Extraction of Bitumen (FM5-T164)
Each $107.06
3.23 Permeability Test – Granular Soil
Each $290.76
3.24 Permeability Test – Clay (Back Pressure)
Each $398.35