CN-550000-C9099-00130000.pdf

PDF 186 KB Posted

Attached to
Master Agreement FL|C8Y05|b53d1351a16f885a8199e7217f75b8df
Contract number
C8Y05
Issued by
Florida

About this file

This document is a Task Work Order Amendment from the Florida Department of Transportation (FDOT), specifically FDOT District 6 Intermodal Systems Development Office, involving Kittelson & Associates, Inc. as the consultant and Marlin Engineering as a supporting firm. The amendment (Amendment No. 1) is to Task Work Order No. 6 under Contract No. C9099, with a Financial Management Number of 421053-3-12-03, dated 1/10/2017.

The amendment covers a conceptual analysis and feasibility study for two non-motorized bridges/overpasses at US-1 near 27th Avenue and Bird Road. The scope includes preparing a PowerPoint presentation, meeting with leadership, developing elevator concept plans, reviewing design alternatives, creating cost estimates, and producing deliverables such as concept typical sections, conceptual plan and profile sheets, and engineering cost estimates. The total compensation for this amendment is $11,217.21, which will be provided on a lump sum basis. The project requires incorporating 2-3% grades on the superstructure to service pedestrians and bicyclists, and the deliverables are to be completed by February 20, 2017. The total contract authorization to date, including this amendment, is $374,097.83.

View the file

Other files

File Type Posted
CN-550000-C8Y05-00010000.pdf PDF
CN-550000-C8Y05-00060000.pdf PDF
CN-550000-C8Y05-00030000.pdf PDF
CN-550000-C8Y05-00040000.pdf PDF
CN-550000-C8Y05-00050000.pdf PDF
CN-550000-C8Y05-00020000.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .