CN-550000-C8Z52-S0030000.pdf

PDF 585 KB Posted

Attached to
Master Agreement FL|C8Z52|5b9f260be4b99e81026da22ea29e46bd
Contract number
C8Z52
Issued by
Florida

About this file

This document is a Fourth Amendment to a Professional Services Agreement between the State of Florida Department of Transportation and Moffatt & Nichol, Inc., with Protean Design Group, Inc. as a subconsultant. The contract is specifically for Intersection Improvements along SR 5 (US 1) at Dunlawton Ave. and Herbert St. in Volusia County, Florida, with the original contract executed on September 22, 2010, and this amendment dated June 18, 2013.

The amendment authorizes Post Design Services with a Total Maximum Limiting Amount of $11,409.00, which increases the original contract total to $384,245.00. The services include attending construction meetings, preparing design and plan changes, providing engineering assistance, and reviewing shop drawings and product cut sheets. Compensation is structured with lump sum and limiting amounts for Moffatt & Nichol (prime contractor) and Protean Design Group (subconsultant), covering salary-related costs, fixed fee/operating margin, and other direct expenses. The contract extends the project completion date to June 27, 2014, and outlines detailed invoicing and payment procedures based on specific contractual rates for different job classifications.

View the file

Other files

File Type Posted
CN-550000-C8Z52-S0010000.pdf PDF
CN-550000-C8Z52.pdf PDF
CN-550000-C8X61-00120000.pdf PDF
CN-550000-C8Z52-S0020000.pdf PDF
ContractBudgetExport.csv CSV file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .