CN-550000-C8Z18-00030000.pdf
PDF 99 KB Posted
- Contract number
- C8Z18
- Issued by
- Florida
About this file
This document is a Memorandum of Agreement between the Florida Department of Transportation (FDOT) and AIM Engineering & Surveying, Inc., dated March 10, 2014. The agreement relates to Contract No. C-8Z18 for USB 41 (SR 685) project from East Violet Street to East Sligh Avenue in Tampa, Florida. The document involves the state of Florida, specifically FDOT, and the consulting firm AIM Engineering & Surveying, Inc.
The agreement establishes the compensation terms for the consulting services, detailing unloaded direct labor rates for various job classifications. These rates range from $16.74 for Secretarial/Clerical positions to $64.90 for Senior Surveyor & Mapper roles. The consultant will invoice at current unloaded direct labor rates without escalation through the end of services, with additional overhead, operating margin, FCCM, and expenses to be added in accordance with Section 2.2 of the contract. The document specifies that these rates are for invoicing purposes and are part of the method of compensation for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C8Z18-00070000.pdf | ||
| CN-550000-C8Z18-S0010000.pdf | ||
| CN-550000-C8Z18.pdf | ||
| CN-550000-C8Z18-S0010100.pdf | ||
| CN-550000-C8Z18-00020000.pdf | ||
| CN-550000-C9894-00110000.pdf | ||
| CN-550000-C8Z18-00010000.pdf | ||
| CN-550000-C8Z18-00040000.pdf | ||
| CN-550000-C8Z18-00050000.pdf | ||
| ContractBudgetExport.csv | CSV file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .