This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to Terracon Consultants, Inc., located in Winter Park, Florida. The task work order is associated with Contract No. C8T51 and is dated 5/17/2013, with a specific Task Work Order No. 80.

The task involves geotechnical engineering services for a project along I-95 in Martin County, specifically performing 66 Standard Penetration Test (SPT) borings to depths of 10 feet. The purpose is to provide soil parameters and a geotechnical report to support the design of light pole foundations between CR-708 and High Meadow Road. The total compensation for these services is $27,388.01, based on loaded billing rates, with a project completion deadline of 11/17/2013. An independent assessment confirmed the staff hours and quantities as fair, reasonable, and competitive. The total authorizations to date for this contract, including this task work order, amount to $1,238,194.88.

View the file

Other files

File Type Posted
00010000-85020.pdf PDF
CN-550000-C8T51-00120000.pdf PDF
00010000-85020.pdf.crdownload CRDOWNLOAD file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 375-030-25

PROCUREMENTTASK WORK ORDER FOR PROFESSIONAL SERVICES 05105

Consultant: Terracon Consultants, Inc.

Address: 1675 Lee Road Winter Park, Florida 32789

(To be entered upon execution of T.W.O.)

Date: 5/17/2013

Task W~rk Ord.e~ No.:' 80

Contract No. C8T51 Payment FM No.: 41971646201

Brief Task Description:

Geotechnical Engineering Services: To perform 66 SPT borings to depths of 10 feet along 1·95 to provide soil parameters and geotechnical report to support the design of light pole foundations. The limits of the project is from just North of CR·708 to South of High Meadow Road in Martin County. FPID:429737·1·52·01. •

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services). All services required under this Task Work Order will be completed on or before: 11/17/2013

The total amount or the limiting amount of the compensation will be: $27,388.01

Compensation elements are as follows:

Est*Amount y$27,388.01Loaded Rates

$27,388.01

Total $27,388.01

Other Notes:

An independent assessment of the staff hours and quantities was performed and found to be fair, reasonable, and competitive.

ed at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total authorizations to date (including this one):

$1,238,194.88

Departmental Approval:

TERRENCE WALTERS FOOT Project Manager (name) (title)

Consultant Acceptance:

HUGO SOTO, P.E. Contract Project Manager (name) (title)

·Limiting or EstimatedlBudgeted Amount.

Distribution Financial Services Professional Services Terracon Consultants Inc File http:1,238,194.88 http:27,388.01 http:27,388.01

File details come from the government source that posted it. Updated .