CN-550000-C8O75-W0020000.pdf

PDF 25 KB Posted

Attached to
Master Agreement FL|C8O75|7f3d125c0a7533fda9e3fd27efb91a01
Contract number
C8O75
Issued by
Florida

About this file

This document is a Letter of Authorization (LOA) issued by the Florida Department of Transportation (FDOT) to HDR Engineering, Inc., located in Tampa, Florida. The letter references a specific contract (Contract #C8075) with a Federal ID number of 421907-1-52-01, addressed to Larry D. Low at HDR Engineering.

The LOA authorizes an encumbrance of $300,000 against a total contract ceiling amount of $1,500,000, bringing the cumulative dollar amount to $900,000. The effective date of the authorization is July 6, 2009; however, the funds cannot be utilized until a Task Work Order is issued by the Project Manager. The document suggests this is part of an ongoing contractual relationship for professional services, with Don Cashdollar identified as the Project Manager and Ramona Domberly signing as the Senior Consultant Services Coordinator.

View the file

Other files

File Type Posted
CN-550000-C8O75-W0030000.pdf PDF
CN-550000-C8O75-W0040000.pdf PDF
CN-550000-C9457-S0020000.pdf PDF
CN-550000-C8O75-W0010000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .