This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) District Five, involving Vanasse Hangen Brustlin, Inc. (VHB) and their subconsultant IBI Group Professional Services (USA) Inc. The task work order is part of Contract BEA16 and pertains to the SunRail Data Intermediary (SDI) Development, Installation, and Integration project, with a Financial Project ID of 435445-1-82-04.
The task work order authorizes the development of a user interface for SunRail dispatchers to hide and unhide real-time train trip information, with specific functionality including date selection, trip visibility management, and database logging. The total contract amount is $11,840.00, allocated for 74 hours of programming work at a rate of $160.00 per hour. The project is anticipated to be completed by December 31, 2021, with the software installation to include a Microsoft Windows application that will be installed on dispatchers' utility workstations. The deliverable includes SDI Software version 2.2.0.0 with the specified enhancements, along with installation, integration, and burn-in testing support.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-BEA16-00100000.pdf | ||
| CN-550000-CAT46.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
06/17
Consultant:
Address:
Date:
7/21/2025
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Signature
SE Regional Manager
$11,840.00
$0.00
(name) (title)
David Mulholland
$11,840.00
Payment will be authorized based on hours submitted for each monthly progress estimate and is defined in ATTACHMENT "B".
Total authorizations to date (including this one):
Departmental Approval:
$11,840.00 Limit
SunRail Data Intermediary (SDI) Development, Installation and Integration
VANASSE HANGEN BRUSTLIN, INC.
225 E. Robinson Street
Suite 300
Orlando, FL 32801
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$11,840.00
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
Scope of Work attached
$421,740.00
(name) (title) Signature
James S. Stroz, Jr., P.E. District Traffic Operations Engineer
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
BEA16 435445-1-82-04
DocuSign Envelope ID: E1E8E938-5DD5-4BB0-9ADE-2D6CABFCC0D5
12/3/2021 | 6:22 PM EST
Total
Pay Item Quantity Unit Price Total
1 0 HR 131.00$ -$
1 0 HR 98.00$ -$
1 0 HR 95.00$ -$
1 74 HR 160.00$ 11,840.00$
1 0 HR 120.00$ -$
Total Hours = 74 Task Work Order Total = 11,840.00$
Description
BEA16 - Task Work Order 09 Details
Junior Programmer
Traffic Data Scientist
Junior Traffic Data Scientist
Junior Visualization Specialist
Programmer
ATTACHMENT A
SCOPE OF SERVICES
ITS Software Integration & Maintenance Services for the SunStore and Future Deployments
Financial Project ID No. 435445-1-82-04
Contract BEA16
District Five
SunRail Data Intermediary (SDI) Development, Installation, and Integration
A. SCOPE OF SERVICE
Vanasse Hangen Brustlin (VHB) and their subconsultant IBI Group Professional Services (USA) Inc. will provide the following services related to SunRail Data Intermediary (SDI) Development, Installation and
Integration for the Florida Department of Transportation (FDOT) District 5 (District).
PROJECT GOALS AND OBJECTIVES
The purpose of this project to provide the District with SunRail Data Intermediary (SDI) Development, Installation and Integration
B. TASKS
TASK 1: SDI Development, Installation and Integration
Hidden Trains User Interface Requirements
Key Functionality:
• A simple UI with big buttons and large font that will allow dispatchers to hide and unhide real‐time information for train trips for a given day.
• Dispatchers will select a specific day on which the trip(s) they wish to hide or unhide operate.
• Dispatchers will select one or more trips that they wish to hide or unhide for the selected day and select the appropriate ‘hide’ or ‘unhide’ checkbox in the user interface and submit those changes.
• Upon submission of trips using a ‘submit’ button, the trip status will be written into a database on SunRail SDI server, and this action will be logged on the SDI server.
• If a trip has a ‘hidden’ value associated with it, real‐time and schedule data for that trip will not be displayed to customers and train arrival announcement indications will not be sent to the SunRail PA/VMS system.
UI Installation
A Microsoft Windows application will be installed as an application, copied across the network, saved in a special folder. The application will be registered as an installed application viewable in Add/Remove
Programs. Installation will require admin privileges. The UI will exist on the dispatchers’ utility workstation which has direct access through the CFRC network to the SunRail SDI server. Database authentication will be encrypted in the compiled application.
UI Execution
An icon will be placed on the Microsoft Windows Desktop as a shortcut to the application. The application will not require administrative privileges. An initial splash image will appear to provide feedback to the dispatcher that the application is loading. The splash image will transition to the Date
Selection dropdown.
Date Selection
Following application start up, a calendar dropdown menu will show the days on which train service is scheduled to run for the current day and next six calendar days. By default, the current (or next, if there is no service today) service date will be selected. Only one date will be allowed for selection. Once selected, the UI will transition to the Trip and Visibility Selection.
Service Date
2021‐10‐15
2021‐10‐18
2021‐10‐19
2021‐10‐20
2021‐10‐21
Trip and Visibility Selection
After a user selects a specific date, the user interface will display a list of the trips scheduled to operate that day, along with information about whether they are currently hidden. This table will also include a column that will allow users to select specific trips they wish to modify. After one or more trips is selected, users will have the opportunity to select whether they want the selected trips to be hidden or unhidden. The trips displayed for a particular day and their current status will be determined by a database script on the SDI server that is called each time a date is selected from the date selector.
Upon clicking Submit, the submissions request will be logged (date, time, and the change requested and submitted) in a log file on the SDI server, and the database table on the SDI server will be updated with the relevant information. The data table showing the trips will reload for the service date previously selected, allowing users to confirm that the current visibility settings of the trips are accurate. An example of the table resulting from the selections above is shown below:
Upon clicking REFRESH, the UI will reload the data table showing the trips for the service date previously selected, allowing dispatcher to confirm the current visibility settings of the trips, should a high priority action distract them from the trip status modifications.
Upon clicking CHANGE DATE, the UI will return to the Date Selection dropdown.
Note: The above is meant to describe the required features and may be implemented differently to provide the same functionality.
DELIVERABLES:
‐ SDI Software (2.2.0.0) shall include all listed enhancements o Software Installation, Integration and Burn-in Testing Support
C. Assumptions
Users will use this UI on a machine that can access the SDI database.
Trains cancelled/hidden before the train begins its trip will not generate any data from Wi‐Tronix showing that train operating. If a train is hidden before its trip begins then makes movements that causes Wi‐Tronix to show the train operating, then the train will be output in the “trains” API used for the real‐time location map on sunrail.com until a user unhides this train then hides it again. (The reason for this is the “trains” API uses data from the LOCOMOTIVE_POSITION database table, but trains are put in this table only once they start operating. If a train is hidden before a train starts its trip, then the train cannot be hidden because it’s not in this table yet.) This same assumption does not apply to other outputs (predictions shown on sunrail.com, predictions and locations output in GTFS‐realtime, and announcements sent to the PA/VMS system).
D. Services to be Provided All required hardware, network connectivity and licensed software.
E. PROJECT SCHEDULE
The project is anticipated to be completed by December 31, 2021
F. FEE ESTIMATE
Details of the estimated man‐hours, out of pocket expenses, and fees for this task assignment are transmitted separately.
A-T-T-A-C-H-M-E-N-T "B"
GENERAL ENGINEERING CONSULTANT
Work Order No. 9
JOB CLASSIFICATION MANHOURS SALARY
TOTAL
SALARIES
Financial ID No.: 435445-1-82-04 Traffic Data Scientist 0 131.00$ -$
(Agreement) Junior Traffic Data Scientist 0 $98.00 -$
Visualization Specialist 0 $102.00 -$
Financial ID No. Junior Visualization Specialist 0 $95.00 -$
N/A Programmer 74 $160.00 11,840.00$
(Services) Junior Programmer 0 $120.00 -$
Loaded Salary Total - Office Overhead 74 11,840.00$
BRIEF DESCRIPTION
Loaded Salary Total - Field Overhead 0
Work Order No. 9
FEE ESTIMATE (Computations)
Total Loaded Salary Costs - Office Costs 11,840.00$
(a) Office Overhead @ 0.00%
NAME OF CONSULTANT (b) Operating Margin @ 0.00%
(c) FCCM @ 0.00%
(d) Expenses @ 0.00%
Subtotal Subconsultant - Office Costs 11,840.00$
Total Loaded Salary Costs - Field Costs
(a) Field Overhead @ 0.00%
(b) Operating Margin @ 0.00%
(c) FCCM @ 0.00%
(d) Expenses @ 0.00%
Subtotal Subconsultant - Field Costs
TOTAL UPSET LIMIT FEE 11,840.00$
SunRail Data Intermediary (SDI) Development, Installation, and Integration
IBI Group Professional Services (USA) Inc.
WORK ACTIVITY
Traffic Data
Scientist
Junior Traffic
Data Scientist
Visualization
Specialist
Junior
Visualization
Specialist Programmer Junior Programmer TOTAL
1 SDI Development, Installation and Integration 0 74 74
GRAND TOTAL 0 0 0 0 74 0 74
MANHOUR ESTIMATE SHEET
Financial ID No.: 435445-1-82-04
General Engineering Consultant Services
IBI Group Professional Services (USA) Inc.
Work Order No. 9
SunRail Data Intermediary (SDI) Development, Installation, and Integration