This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) District Five, involving Vanasse Hangen Brustlin, Inc. (VHB) and their subconsultant IBI Group Professional Services (USA) Inc. The task work order is part of Contract BEA16 and pertains to the SunRail Data Intermediary (SDI) Development, Installation, and Integration project, with a Financial Project ID of 435445-1-82-04.

The task work order authorizes the development of a user interface for SunRail dispatchers to hide and unhide real-time train trip information, with specific functionality including date selection, trip visibility management, and database logging. The total contract amount is $11,840.00, allocated for 74 hours of programming work at a rate of $160.00 per hour. The project is anticipated to be completed by December 31, 2021, with the software installation to include a Microsoft Windows application that will be installed on dispatchers' utility workstations. The deliverable includes SDI Software version 2.2.0.0 with the specified enhancements, along with installation, integration, and burn-in testing support.

View the file

Other files

File Type Posted
CN-550000-BEA16-00100000.pdf PDF
CN-550000-CAT46.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

06/17

Consultant:

Address:

Date:

7/21/2025

*Limiting or Estimating/Budgeted Amount.

Distribution:

Consultant Acceptance:

Signature

SE Regional Manager

$11,840.00

$0.00

(name) (title)

David Mulholland

$11,840.00

Payment will be authorized based on hours submitted for each monthly progress estimate and is defined in ATTACHMENT "B".

Total authorizations to date (including this one):

Departmental Approval:

$11,840.00 Limit

SunRail Data Intermediary (SDI) Development, Installation and Integration

VANASSE HANGEN BRUSTLIN, INC.

225 E. Robinson Street

Suite 300

Orlando, FL 32801

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$11,840.00

(LS2) Lump sum paid based on % of completion

Page 1 Total

Page 2 thru 6 Subtotal

Total

Scope of Work attached

$421,740.00

(name) (title) Signature

James S. Stroz, Jr., P.E. District Traffic Operations Engineer

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Task Work Order No.:

Contract No.: Payment FM No.:

BEA16 435445-1-82-04

DocuSign Envelope ID: E1E8E938-5DD5-4BB0-9ADE-2D6CABFCC0D5

12/3/2021 | 6:22 PM EST

Total

Pay Item Quantity Unit Price Total

1 0 HR 131.00$ -$

1 0 HR 98.00$ -$

1 0 HR 95.00$ -$

1 74 HR 160.00$ 11,840.00$

1 0 HR 120.00$ -$

Total Hours = 74 Task Work Order Total = 11,840.00$

Description

BEA16 - Task Work Order 09 Details

Junior Programmer

Traffic Data Scientist

Junior Traffic Data Scientist

Junior Visualization Specialist

Programmer

ATTACHMENT A

SCOPE OF SERVICES

ITS Software Integration & Maintenance Services for the SunStore and Future Deployments

Financial Project ID No. 435445-1-82-04

Contract BEA16

District Five

SunRail Data Intermediary (SDI) Development, Installation, and Integration

A. SCOPE OF SERVICE

Vanasse Hangen Brustlin (VHB) and their subconsultant IBI Group Professional Services (USA) Inc. will provide the following services related to SunRail Data Intermediary (SDI) Development, Installation and

Integration for the Florida Department of Transportation (FDOT) District 5 (District).

PROJECT GOALS AND OBJECTIVES

The purpose of this project to provide the District with SunRail Data Intermediary (SDI) Development, Installation and Integration

B. TASKS

TASK 1: SDI Development, Installation and Integration

Hidden Trains User Interface Requirements

Key Functionality:

• A simple UI with big buttons and large font that will allow dispatchers to hide and unhide real‐time information for train trips for a given day.

• Dispatchers will select a specific day on which the trip(s) they wish to hide or unhide operate.

• Dispatchers will select one or more trips that they wish to hide or unhide for the selected day and select the appropriate ‘hide’ or ‘unhide’ checkbox in the user interface and submit those changes.

• Upon submission of trips using a ‘submit’ button, the trip status will be written into a database on SunRail SDI server, and this action will be logged on the SDI server.

• If a trip has a ‘hidden’ value associated with it, real‐time and schedule data for that trip will not be displayed to customers and train arrival announcement indications will not be sent to the SunRail PA/VMS system.

UI Installation

A Microsoft Windows application will be installed as an application, copied across the network, saved in a special folder. The application will be registered as an installed application viewable in Add/Remove

Programs. Installation will require admin privileges. The UI will exist on the dispatchers’ utility workstation which has direct access through the CFRC network to the SunRail SDI server. Database authentication will be encrypted in the compiled application.

UI Execution

An icon will be placed on the Microsoft Windows Desktop as a shortcut to the application. The application will not require administrative privileges. An initial splash image will appear to provide feedback to the dispatcher that the application is loading. The splash image will transition to the Date

Selection dropdown.

Date Selection

Following application start up, a calendar dropdown menu will show the days on which train service is scheduled to run for the current day and next six calendar days. By default, the current (or next, if there is no service today) service date will be selected. Only one date will be allowed for selection. Once selected, the UI will transition to the Trip and Visibility Selection.

Service Date

2021‐10‐15

2021‐10‐18

2021‐10‐19

2021‐10‐20

2021‐10‐21

Trip and Visibility Selection

After a user selects a specific date, the user interface will display a list of the trips scheduled to operate that day, along with information about whether they are currently hidden. This table will also include a column that will allow users to select specific trips they wish to modify. After one or more trips is selected, users will have the opportunity to select whether they want the selected trips to be hidden or unhidden. The trips displayed for a particular day and their current status will be determined by a database script on the SDI server that is called each time a date is selected from the date selector.

Upon clicking Submit, the submissions request will be logged (date, time, and the change requested and submitted) in a log file on the SDI server, and the database table on the SDI server will be updated with the relevant information. The data table showing the trips will reload for the service date previously selected, allowing users to confirm that the current visibility settings of the trips are accurate. An example of the table resulting from the selections above is shown below:

Upon clicking REFRESH, the UI will reload the data table showing the trips for the service date previously selected, allowing dispatcher to confirm the current visibility settings of the trips, should a high priority action distract them from the trip status modifications.

Upon clicking CHANGE DATE, the UI will return to the Date Selection dropdown.

Note: The above is meant to describe the required features and may be implemented differently to provide the same functionality.

DELIVERABLES:

‐ SDI Software (2.2.0.0) shall include all listed enhancements o Software Installation, Integration and Burn-in Testing Support

C. Assumptions

Users will use this UI on a machine that can access the SDI database.

Trains cancelled/hidden before the train begins its trip will not generate any data from Wi‐Tronix showing that train operating. If a train is hidden before its trip begins then makes movements that causes Wi‐Tronix to show the train operating, then the train will be output in the “trains” API used for the real‐time location map on sunrail.com until a user unhides this train then hides it again. (The reason for this is the “trains” API uses data from the LOCOMOTIVE_POSITION database table, but trains are put in this table only once they start operating. If a train is hidden before a train starts its trip, then the train cannot be hidden because it’s not in this table yet.) This same assumption does not apply to other outputs (predictions shown on sunrail.com, predictions and locations output in GTFS‐realtime, and announcements sent to the PA/VMS system).

D. Services to be Provided All required hardware, network connectivity and licensed software.

E. PROJECT SCHEDULE

The project is anticipated to be completed by December 31, 2021

F. FEE ESTIMATE

Details of the estimated man‐hours, out of pocket expenses, and fees for this task assignment are transmitted separately.

A-T-T-A-C-H-M-E-N-T "B"

GENERAL ENGINEERING CONSULTANT

Work Order No. 9

JOB CLASSIFICATION MANHOURS SALARY

TOTAL

SALARIES

Financial ID No.: 435445-1-82-04 Traffic Data Scientist 0 131.00$ -$

(Agreement) Junior Traffic Data Scientist 0 $98.00 -$

Visualization Specialist 0 $102.00 -$

Financial ID No. Junior Visualization Specialist 0 $95.00 -$

N/A Programmer 74 $160.00 11,840.00$

(Services) Junior Programmer 0 $120.00 -$

Loaded Salary Total - Office Overhead 74 11,840.00$

BRIEF DESCRIPTION

Loaded Salary Total - Field Overhead 0

Work Order No. 9

FEE ESTIMATE (Computations)

Total Loaded Salary Costs - Office Costs 11,840.00$

(a) Office Overhead @ 0.00%

NAME OF CONSULTANT (b) Operating Margin @ 0.00%

(c) FCCM @ 0.00%

(d) Expenses @ 0.00%

Subtotal Subconsultant - Office Costs 11,840.00$

Total Loaded Salary Costs - Field Costs

(a) Field Overhead @ 0.00%

(b) Operating Margin @ 0.00%

(c) FCCM @ 0.00%

(d) Expenses @ 0.00%

Subtotal Subconsultant - Field Costs

TOTAL UPSET LIMIT FEE 11,840.00$

SunRail Data Intermediary (SDI) Development, Installation, and Integration

IBI Group Professional Services (USA) Inc.

WORK ACTIVITY

Traffic Data

Scientist

Junior Traffic

Data Scientist

Visualization

Specialist

Junior

Visualization

Specialist Programmer Junior Programmer TOTAL

1 SDI Development, Installation and Integration 0 74 74

GRAND TOTAL 0 0 0 0 74 0 74

MANHOUR ESTIMATE SHEET

Financial ID No.: 435445-1-82-04

General Engineering Consultant Services

IBI Group Professional Services (USA) Inc.

Work Order No. 9

SunRail Data Intermediary (SDI) Development, Installation, and Integration

File details come from the government source that posted it. Updated .