This document is a Railroad Change Order Number 1 issued by the State of Florida Department of Transportation (FDOT) for work on State Route 700 (US 98) in Polk County. The change order authorizes CSX Transportation, Inc. to perform preliminary engineering and construction services for an emergency preemption repair at CSX Crossing 624171B, located at RRMP AX 852.43. The underlying agreement references a Master Agreement dated August 7, 1972, and is classified as a Signals-type railroad agreement under Contract ID AT943. The agreement has a beginning date of September 21, 2026, and extends through December 31, 2050.
The authorized work under this change order has an estimated cost of $30,000.00, representing the total amount of work authorized to date under Financial Project ID 441026-1-57-01. Reimbursement is structured using the Force Account Method in accordance with Florida Administrative Rule Chapter 14-57 Section .011(2), making the work reimbursable. The funding is classified as state funds with sources including Suspended and Debarred (SA, DS, DDR) designations. The contractor must comply with E-Verify employment eligibility verification requirements, Buy America provisions for steel and iron manufacturing, and Title VI nondiscrimination assurances. The project includes supplemental technical standards for railroad grade crossing traffic control devices, classified as Type IV (2-Quadrant Flashing Lights and Gates with Multiple Tracks) with an annual maintenance cost of $6,157.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-AT943.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
725-090-04
RAIL
OGC – 04/26
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NUMBER 1
Financial Project ID Roadway Description County Roadway ID Contract ID
441026-1-57-01 SR 700 (US 98) Polk 16331000 AT943
A. 1. The CSX Transportation, Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary engineering and construction services for the emergency preeemption repair at CSX Crossing 624171B, RRMP AX 852.43. This change order includes any other work deemed necessary to complete the project.
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the below referenced Railroad Agreement.
3. The items of work covered by this Change Order are referenced to the Master Agreement of record dated 8/7/1972 and no Supplemental Agreement is required.
Agreement Type: Signals
B. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 Section .011(2) as:
a. ☐ NONREIMBURSABLE
b. ☒ REIMBURSABLE
(1) ☒ Force Account Method
(2) ☐ Lump Sum Method
(3) ☐ Third Party Contract Method
C. Estimated cost of authorized work under this Financial Project ID:
CHANGE ORDER(S)
AGREEMENT(S)
DESCRIPTION
PREVIOUSLY
AUTHORIZED
AMOUNT(S)
NEW
AUTHORIZED
AMOUNT(S)
1 Preliminary engineering and construction services $0.00 $30,000.00
PROJECT TOTAL AMOUNT OF WORK AUTHORIZED TO DATE $30,000.00
Examined as to provisions and participating items of cost:
Recommended: ____________________ Approved: ____________________ Date Date
Wendy Sands Wendy Sands
District Rail Administrator for the Modal Development Administrator
Docusign Envelope ID: 4FD4C9A5-7E70-8BBC-82E5-8B9EE256489D
09/24/2026 | 4:09 PM EDT09/24/2026 | 4:09 PM EDT
OGC – 04/26
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC – 04/26
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
OGC – 04/26
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
Florida Department of Transportation
RON DESANTIS
GOVERNOR
801 N Broadway Ave
Bartow, FL 33830
JARED W. PERDUE, P.E.
SECRETARY
www.fdot.gov | www.swflroads.com
MEMORANDUM
Date: June 30, 2026
To: Michelle Peronto, Transit Programs Administrator
Wendy Sands, Rail Administrator
Dave Newell, Freight and Seaport Coordinator
Dawn Gallon, Senior Aviation/Intermodal Project Manager
From: Paul Simmons, Modal Development Administrator
Copies: Legal Office, Human Resources Office, Financial Services, Procurement, D1-LForum
Subject: Delegation of Authority for Paul Simmons (7/1/26 – 6/30/27)
You are delegated signature and approval authority anytime during my absence from the office. Signature should be made “in your name for the “Modal Development
Administrator”.
This delegation will remain in effect from July 1, 2026 – June 30, 2027.
Paul Simmons Modal Development Administrator
PS/cc
Docusign Envelope ID: EB0C3F44-4D66-8FF5-81FE-15DABF4C1043Docusign Envelope ID: 4FD4C9A5-7E70-8BBC-82E5-8B9EE256489D
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD GRADE CROSSING TRAFFIC CONTROL DEVICES
ANNUAL MAINTENANCE COSTS
725-090-41
RAIL
04/26
FINANCIAL PROJECT NO. ROAD NAME OR NUMBER COUNTY NAME PARCEL & R/W NUMBER FAP NUMBER
441026-1-57-01 SR 700 (US 98) Polk 125 (16331-2501) N/A
COMPANY NAME: CSX Transportation, Inc.
A. FDOT/AAR XING NO.: 624171B RR MILE POST TIE: AX 852.43
B. TYPE SIGNALS PROPOSED: IV CLASS: III DOT INDEX: 509-070
SCHEDULE OF ANNUAL COST OF AUTOMATIC
HIGHWAY GRADE CROSSING TRAFFIC CONTROL DEVICES
Annual Maintenance Cost Exclusive of Installation
CLASS DESCRIPTION COST*
I 2-Quadrant Flashing Lights with One Track $3,251.00
II 2-Quadrant Flashing Lights with Multiple Tracks $4,302.00
III 2-Quadrant Flashing Lights and Gates with One Track $4,903.00
IV 2-Quadrant Flashing Lights and Gates with Multiple Tracks $6,157.00
V 3 or 4-Quadrant Flashing Lights and Gates with One Track $9,694.00
VI 3 or 4-Quadrant Flashing Lights and Gates with Multiple Tracks $12,164.00
AUTHORITY: FLORIDA ADMINISTRATIVE RULE 14-57.011
Public Railroad-Highway Grade Crossing Costs
EFFECTIVE DATE: July 22, 1982
GENERAL AUTHORITY: 334.044, F.S.
SPECIFIC LAW IMPLEMENTED: 335.141, F.S.
*This schedule will become effective July 1, 2026 and will be reviewed every 5 years and revised as appropriate based on the Consumer Price Index for all Urban Consumers published by the U.S. Department of Labor.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
AT943
9/22/2026
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 9/22/2026
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55014010106
Expansion Option: A5
Object Code: 563000
Amount: $30,000.00
Financial Project: 44102615701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2027
Budget Entity: 55150200
Category/Category Year: 088716/27
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $30,000.00
Contract: AT943
Contract Type: AA - RR SIGNALS-PE/INSTAL (RR-SIG/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 09/21/2026
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Preliminary Engineering and Construction Services for Emergency Preemption Repair at Crossing 624171B
Page1 of 1
To: JJ.Wren@dot.state.fl.us
CSX TRANSPORTATION – NEW PROJECT INITIATION FORM
Please provide the following information so that CSXT is able to accurately and appropriately process the project setup and billing.
Is this project associated with
Federal funds?
Is this project associated with
State funds?
Please describe the funding source for this project (i.e. INFRA, Section 130, State, County, Private, etc.).
Project Requirements:
Buy America
Additional procurement restrictions (Please describe below)
State Suspended and Debarred (Note - All federally funded projects are already monitored against the federal sus/deb listings)
Davis-Bacon (Please only check this box if this is a construction project that may be performed by an outside party)
CSX is subject to a state single audit as a recipient or subrecipient of funds (The only states that should apply here are FL or NC. FL must provide completed form DFS-A2-NS.)
Other If you selected Other, please describe below. Only complete this section if this project is associated with
Federal and/or State funds.
Project Sponsor - "Bill To" Information
Agency - Sponsor:
Billing Address:
Contact Name:
Phone:
E-mail:
Invoice Delivery Method:
Project Location:
Project Description:
Sponsor Project Ref.
Number (If applicable)
Signature of Applicant* Please sign, and e‐mail this form to the authorized CSX representative.
Name and Title of
Applicant
Signature of Applicant Date:
*By signing this form you are authorizing CSXT to incur costs and bill against this project. Should the project be canceled, CSXT will bill the Project Sponsor for the incurred costs. In the event the Project Sponsor is unresponsive for 90 days or more, the project will be closed;
and the Project Sponsor will be final billed for all project costs incurred.
Form Revision 7/18/23
If Email or Mail & Email is selected, please enter Email address(es) here:
Note: this is the agency that will be paying the invoice.
Note: this is the address to send the invoice for payment.
SA, DS, DDR
E-Verify
Florida Department of Transportation 801 N Broadway Avenue, Bartow, FL 33830
J.J. Wren 863-519-2437 jj.wren@dot.state.fl.us jj.wren@dot.state.fl.us
Crossing 624171B, RRMP AX 852.43 Emergency Preemption Repair
441026-1-57-01 (AT943)
J.J. Wren, Rail Project Manager
No
Yes
09/24/2026 | 3:57 PM EDT
/2
/2
:1
:5
P M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2026-27 SHEETINDEX
C R
O S S
IN
G
R O
A D
R A
IL
TRACKS
C R
O S S
IN
G
R O
A D
R A
IL
TRACKS
C R
O S S
IN
G
R O
A D
R A
IL
C R
O S S
IN
G
R A
IL
R O
A D
4'-0" Max.
1'-0" Std.
4'-0" Max.
1'-0" Std.
4'-0" Max.
1'-0" Std.
31509-070
RAILROAD GRADE CROSSING
TRAFFIC CONTROL DEVICES11/01/23
M in
M in
Are Used.
Automatic Gates
Agency When
Installing
Option Of The
Signs Is The
Number Of Track
Crossing)
(1 Minimum Per
Crossing Bell
Highway
Gong Type
Approach Width2
Flasher Units
Back-To-Back
4" Max.Paved Shoulder
Both Sides
Sheeting, White
Red And
Reflectorized
16" Alternate
Are Used.
Automatic Gates
Agency When
Installing
Option Of The
Signs Is The
Number Of Track
Signal Unit
Of Overhead
Lowest Point
Flasher Units
Back-To-Back
(1 Min. Per Crossing)
Highway Crossing Bell
Gong Type
Flasher Units
Back-To-Back
Roadway
Crown Of
Travelway
4" Max.Paved Shoulder
Highway
Or Part Nearest
Edge Of Background
4" Max.Paved Shoulder
Roadway
Crown Of
Travelway
Approach Width2
Signal Unit
Of Overhead
Lowest Point
Flasher Units
Back-To-Back
2' Min. 4" Max.
Shoulder
Paved
Flasher Units
Back-To-Back
Crossing)
Bell (1 Min. Per
Highway Crossing
Gong Type
(Travelway)
Pavement Edge
Signal And Gate
Railroad Gate Or
Gate
Or Signal And
Railroad Gate
Line
Shoulder
(Travelway)
Pavement Edge
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
Or Curb
Pavement Edge
Travelway
Of
Centerline
Travelway
Of
Centerline
(See Note 2)
10' Min.
(See Note 2)
10' Min.
(See Note 2)
10' Min.
(See Note 2)
10' Min.
ONE-WAY
M e d ia n
See Index 830-T01
Crossing Shoulder Pavement
M in
¡ Median
SIGNAL PLACEMENT AT RAILROAD CROSSING
(4 - LANE DESIGN)
Varies
M a x
M in
M a x
" 51" Max.
27" Std.
15"
Roadway
Crown Of
Travelway
See FIGURE 1
L
M in
M in
15"
27" Std.
51" Max.
15"
27" Std.
TYPE II
M a x
M in
Varies
M in
15"
27" Std.
Travelway
Roadway
Crown Of
M a x
SIGNAL PLACEMENT AT RAILROAD CROSSING
(2 - LANE DESIGN)
See Index 830-T01
Crossing Shoulder Pavement
M in
M in
(Mountable Curb)
Divided Multilane
2 Or 4 Lanes
Undivided
FIGURE 1
TWO-WAY TWO-WAY
Median
Or Shoulder)
(Mountable Curb
M a x
M a x
M a x
M in
M in in
VI
V
IV
III
II
I
V
IV
III
II
I
TYPE I TYPE III TYPE IV
GENERAL NOTES:
TRAFFIC CONTROL DEVICES FOR FLUSH SHOULDER ROADWAY
3-4 Quadrant flashing warning devices and gates-multiple tracks
3-4 Quadrant flashing warning devices and gates-one track
2 Quadrant flashing warning devices and gates-multiple tracks
2 Quadrant flashing warning devices and gates-one track
2 Quadrant flashing warning devices-multiple tracks
2 Quadrant flashing warning devices-one track
Class of traffic control devices (Not Shown)5.
Gate
Flashing warning devices with cantilever and gate
Flashing warning devices with gate
Flashing warning devices with cantilever
Flashing warning devices
Type of traffic control device4.
than 4" above finished shoulder grade.
Top of foundation shall be no higher 3.
if called for in Plans or Specifications.
Advance flasher to be installed when and 2.
certain locations.
attenuation device may be specified for however, some form of impact
No guardrail is proposed for signals; 1.
Arrows denote direction of travel not pavement markings.NOTE:
(See Note 2)
10' Min.
(See Note 2)
10' Min.
(See Note 2)
10' Min.
10' Min.
(See Note 2) but not less than 6' from the edge of the near traffic lane.
located as close as 2' from the edge of a paved shoulder
2. When 10' is deemed impractical the control device can be one for gate), depending on type of equipment used.
1. Two separate foundations may be required (one for signals, NOTE:
/2
:1
:5
P M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2026-27 SHEETINDEX
C R
O S S
IN
G
R O
A D
R A
IL
Sidewalk
TRACKS
C R
O S S
IN
G
R O
A D
R A
IL
C R
O S S
IN
G
R O
A D
R A
IL
TRACKS
Than 2 Approach Lanes).
Unit If There Are More
(More Than One Flasher
Lane Separation Lines
One Flasher Unit Over
As A Minimum, Position
Sides
Sheeting, Both
Red And White
Reflectorized
16" Alternate
Per Crossing)
Crossing Bell (1 Min.
Gong Type Highway
NOTES:
32509-070
RAILROAD GRADE CROSSING
TRAFFIC CONTROL DEVICES11/01/23
4" Max.
Sidewalk
Travelway
Highway
Nearest
Part
Edge Of
Are Used.
Automatic Gates
Agency When
The Installing
The Option Of
Tracks Signs Is
Number Of
Crossing
Bell (1 Minimum) Per
Highway Crossing
Gong Type
Sidewalk
4" Max.4" Max.4" Max.4" Max.Sidewalk Sidewalk
Are Used.
Automatic Gates
Agency When
The Installing
The Option Of
Tracks Signs Is
Number Of
Flasher Units
Back-To-Back
Signal Unit
Of Overhead
Lowest Point
Flasher Units
Back-To-Back
Per Crossing
(1 Minimum)
Highway Crossing Bell
Gong Type
Back-To-Back
Flasher Units
Part Nearest Roadway
Edge Of Background Or
Both Sides
And White Sheeting, Reflectorized Red
16" Alternate
Roadway
Crown Of
Travelway
Width
Approach 2
Signal Unit
Of Overhead
Lowest Point
Flasher Units
Back-To-Back
Travelway
Roadway
Crown Of
Flasher Units
Back-To-Back
Travelway
Roadway
Crown Of
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
Signal And Gate
Railroad Gate Or
C R
O S S
IN
G
R A
IL
R O
A D
6' Min.
51" Max.
Varies
27" Std.
24"
15"
Varies
M a x
M in
Varies
5' Min.
15"
M in . 4'
Sidewalk
10'
Sidewalk
10'
Sidewalk
M in . 4
(2 LANES, CURB & GUTTER)
SIGNAL PLACEMENT AT RAILROAD CROSSING
(2 LANES, CURB & GUTTER)
SIGNAL PLACEMENT AT RAILROAD CROSSING
ACUTE ANGLE (AND RIGHT ANGLE) OBTUSE ANGLE
M a x
M in
51" Max
2'-6"
See FIGURE 1
L
15"
27" Std.
M in a x a x
M in
M a x
See FIGURE 1
L
2'-6"
6' Min.
Width Min.
Approach2
51" Max
27" Std.
15"
M in
M a x
M in
M a x
Travelway
Roadway
Crown Of
Varies
16"
M in
M in
TYPE VTYPE IVTYPE IIITYPE IITYPE I
Min.
2'-6" 24"
M in
M a x
M in of Roadway to the Lowest Point of the Overhead Signal Unit.
minimum vertical clearance shall be 17'-6" from above the Crown
When a cantilevered-arm flashing warning device is used, the 5.
from nearest rail; or 8' from and parallel to gate when present.
Stop line to be perpendicular to edge of roadway, approx. 15' 4.
face of curb and sidewalk.
Locate device outside sidewalk. Over 6' - Locate device between distance available between face of curb & sidewalk. 0' to 6' -
Location of railroad traffic control device is based on the 3.
12'-6".
installed in curbed medians, the minimum median width shall be
Where plans call for railroad traffic control devices to be 2.
appropriate track clearances.
established based on future (or present) installation of gate with
The location of flashing warning devices and stop lines shall be 1.
TRAFFIC CONTROL DEVICES FOR CURBED ROADWAY
/2
:1
:0
P M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2026-27 SHEETINDEX
R O
A
DC
R O S S
IN
G
R A
IL
33509-070
RAILROAD GRADE CROSSING
TRAFFIC CONTROL DEVICES11/01/23
White
Red
Red Flashing LightsRed Steady Burn
Crown Of Roadway Travel Way
6" Min. Height
Type F Curb
18"18"
With Gates
Flashing Signal
Gate or
(If Not with Gate)
Flashing Signal
As Required
Stop Line
6" White
Edge of Traveled Way
S id e w a lk
Min)
(2'-6"
Varies
(Std.)
27"
Min.
57"
M in .1 M in
12'-6" Min.
1'
1'
S id e w a lk
Specified Length Of Gate Arm
M a x
M in . 16" 16"
90°
"C""B""A"
5'
5'
5'
5'
5'
5'
6'
7'
9'
10'10'
9'
7'
6'
5'
4'
41"
36"
36"
36"6"
18"
24"
28"
28"
28"
36"
36"
36"
36"38 And Over
35-37 Ft.
32-34 Ft.
29-31 Ft.
24-28 Ft.
20-23 Ft.
18-19 Ft.
16-17 Ft.
15 Ft.
14 Ft.
"C"
Dimension
"B"
Dimension
"A"
Dimension
Of Gate Arm
Specified Length
RAILROAD GATE ARM LIGHT SPACING
PLAN
MEDIAN SECTION AT SIGNAL GATES
(Three or More Driving Lanes in one Direction, 45 mph or less)
8'
6'
TRAFFIC CONTROL DEVICES
RELATIVE LOCATION OF CROSSING
NOTE:
"A Policy On Geometric Design Of Streets And Highways".
Devices", Part 8; The "Traffic Control Handbook" , Part VIII; and AASHTO
For additional information see the "Manual On Uniform Traffic Control
MEDIAN SIGNAL GATES FOR MULTILANE UNDIVIDED URBAN SECTIONS
GATE ARM DETAIL
| change order |
| Delegation of Authority - Paul Simmons 7.01.26-6.30.27.docx |
| MEMORANDUM |
| Maintenance form |
| _KNAKNJJ-AT943-W001-DIST-01-20260922-101626-KNAKNJJ@dot.state.fl.us-J.J.-Wren |
| CSXT New Project Initiation Form Updated 20230718 |
| RHCI Inventory |
| Map |
| 509-070 |
| Incidental Construction |
| 509-070-Railroad Grade Crossing Traffic Control Devices |
| 509-070-1of3 |
| 509-070-2of3 |
| 509-070-3of3 |
File details come from the government source that posted it. Updated .