CN-550000-AT302-00010000.pdf
PDF 488 KB Posted
- Contract number
- AT302
- Issued by
- Florida
About this file
This document is a Railroad Change Order Number 1 issued by the State of Florida Department of Transportation for a project involving South Central Florida Express, Inc. The change order is associated with Financial Project ID 455407-1-57-01, located in Palm Beach County, covering the SR-700/SR-15/US-98/US-441/Conners Highway corridor. The document references a Master Agreement dated 9/14/1998 and is classified as a Signals agreement type.
The change order authorizes the installation of a new pre-wired crossing control shelter with prediction type circuitry and flashing light cantilevers, along with preliminary engineering (PE), flagging, and construction engineering and inspection (CEI) services. The total authorized amount is $467,018.00, which is to be reimbursed using the Force Account Method. The project is focused on signal crossing shelter safety upgrades at Crossing 272277W, located at Railroad Milepost K 42.74. The contract is effective from 04/11/2025 to 12/31/2035, with funding approved for fiscal year 2025 under contract AT302.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
725-090-04
RAIL
OGC – 3/24
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NUMBER 1
Financial Project ID Roadway Description County Roadway ID Contract ID
455407-1-57-01 SR-700/SR-15/US-98/US-
441/Conners Highway
Palm Beach 93140000 AT302
A. 1. The South Central Florida Express, Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Installation of a new pre-wired crossing control shelter with prediction type circuitry, Flashing Light Cantilevers and Furnish Preliminary Engineering (PE), Flagging and Construction Engineering and Inspection (CEI), services Crossing: 272277W Mile Post: K 42.74
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the below referenced Railroad Agreement.
3. The items of work covered by this Change Order are referenced to the Master Agreement of record dated 9/14/1998 and no Supplemental Agreement is required.
Agreement Type: Signals
B. 1. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 Section .011(2) as:
a. ☐ NONREIMBURSABLE
b. ☒ REIMBURSABLE
(1) ☒ Force Account Method
(2) ☐ Lump Sum Method
(3) ☐ Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
CHANGE
ORDER
DESCRIPTION
PREVIOUSLY
AUTHORIZED WORK
AMOUNT(S)
NEW AUTHORIZED
WORK AMOUNT
1 Installation of a new pre-wired crossing control shelter with prediction type circuitry, Flashing Light Cantilevers and Furnish Preliminary Engineering (PE), Flagging and Construction Engineering and Inspection (CEI), services
$0.00 $467,018.00
Total amount of work previously authorized………………………………………………………… $0.00
Total amount of new work authorized by this change order…………………………………………………………………… $467,018.00
Total amount of work authorized under agreement for this Financial Project ID……………………………………… $0.00
PROJECT TOTAL AMOUNT OF WORK AUTHORIZED TO DATE……………………………………………………………………… $467,018.00
Examined as to provisions and participating items of cost:
Recommended: ____________________ Approved: ____________________ Date Date
Docusign Envelope ID: BBEE9200-726F-4D5D-AA24-1C7617324738
04/29/2025 | 9:58 AM EDT
Yanique Kelly, P.E. John P. Krane, P.E.
Director of Transportation Development
05/11/2025 | 3:53 PM EDT
OGC – 3/24
Left Blank
OGC – 3/24
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC – 3/24
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
OGC – 3/24
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
OFFICE OF MODAL DEVELOPMENT
DISTRICT 4 RAIL OFFICE
PROJECT SCOPE AND COST ESTIMATE
PROJECT INFORMATION
Financial Project No.: 455407-1-57-01
FAP Number: D425-051-B
Location: SR-700/SR-15/US-98/US-441/Conners Highway
County: Palm Beach
Crossing No.: 272277W
RR. MP.: K 42.74
Company: South Central Florida Express, Inc.
This project scope and cost estimate was prepared by: District 4 Railroad
Coordinator’s Office
Scope: Installation of a new pre-wired crossing control shelter with prediction type circuitry, Flashing Light Cantilevers and Furnish
Preliminary Engineering (PE), Flagging and Construction
Engineering and Inspection (CEI), services
Change Order # 1 ……………………………………………………$ 467,018.00
TOTAL ESTIMATED COSTS………….…………...……………$ 467,018.00
LOCATION MAP
South Central Florida Express, Inc.
LOCATION: SR-700/SR-15/US-98/US-441/Conners Hwy
COUNTY.: Palm Beach
FINANCIAL PROJECT NO.: 455407-1-57-01
CROSSING NO.: 272277W
RAILROAD MILEPOST: K 42.74
N
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
AT302
4/14/2025
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 4/14/2025
Action: Original
Reviewed or Approved: APPROVED
Organization Code: 55042010429
Expansion Option: AR
Object Code: 563000
Amount: $467,018.00
Financial Project: 45540715701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2025
Budget Entity: 55100100
Category/Category Year: 088808/25
Amendment ID: O001
Sequence: 00
User Assigned ID:
Enc Line (6s)/Status: 0001/04
Total Amount: $467,018.00
Contract: AT302
Contract Type: AB - RR SIGNALS-MAINT (RR-SIG/MTE)
Vendor Name: SOUTH CENTRAL FLORIDA EXPRESS
Vendor ID: F650518598001
Beginning Date of This Agreement: 04/11/2025
Ending Date of This Agreement: 12/31/2035
Contract Total/Budgetary Ceiling: ct = $467,018.00
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: SIGNAL CROSSING SHELTER SAFETY UPGRADES
Page1 of 1
To: Yanique.Kelly@dot.state.fl.us
| 455407-1-57-01 Contract AT302 CO #1 |
| FM# 455407-1-57-01 272277W Scope |
| FM#455407-1-57-01 272277W Location Map |
| Encumbrance Approval AT302 CO #1 |
File details come from the government source that posted it. Updated .