CN-550000-AT044-00010000.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|CAM61|03f434cac8a80c3c4d24b77b2e3b2783
Contract number
CAM61
Issued by
Florida

About this file

This document is a Railroad Change Order for the Florida Department of Transportation (FDOT) and CSX Transportation, Inc., involving a preliminary engineering review for a resurfacing project on US 98 (SR 50A) in Hernando County, Florida. The change order is referenced to a Master Agreement dated 9/15/1998 and is associated with Financial Project ID 451056-1-57-01, with the railroad crossing number 624896D located at Railroad Milepost SR 797.84.

The change order authorizes a preliminary engineering review of plan sets for a resurfacing project within CSX right-of-way, with a total authorized work amount of $50,000.00. The project is funded 100% by state dedicated revenue (DDR) and will be reimbursed using the Force Account Method. The agreement covers preliminary engineering services, with CSX required to provide written estimates and plans for installing or adjusting necessary facilities. The project's beginning date is 07/15/2024, with an ending date of 12/31/2050, and involves reviewing plans for a resurfacing project on US 98 from west of Cortez Boulevard to Ponce de Leon Boulevard.

View the file

Other files

File Type Posted
CN-550000-CAM61.pdf PDF
CN-550000-CAM61-00030000.pdf PDF
CN-550000-CAM61-00040000.pdf PDF
CN-550000-CAM61-W0020000.pdf PDF
CN-550000-CAM61-00020000.pdf PDF
CN-550000-CAM61-00060000.pdf PDF
CN-550000-CAM61-W0010000.pdf PDF
CN-550000-CAM61-00020000.pdf.crdownload CRDOWNLOAD file
CN-550000-CAM61-00050000.pdf PDF
CN-550000-CAM61-00070000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

RAILROAD CHANGE ORDER NUMBER

725-090-04A

RAIL

OGC – 12/23

Financial Project ID Roadway Description County Roadway ID Contract ID 451056-1-57-01 US98 (SR 50A) E Jefferson Hernando 08050000 AT044

A. 1. The CSX Transportation Inc Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:

Preliminary Engineering Review of Plan Sets for Resurfacing Project Within CSX ROW. This Change Order includes all other work necessary to complete this project.

Crossing: 624896D RRMP: SR 797.84

2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the below referenced Railroad Agreement.

3. The items of work covered by this Change Order are referenced to the Master Agreement of record dated 9/15/1998 and no Supplemental Agreement is required.

Agreement Type: Preliminary Engineering

B. 1. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 Section .011(2) as:

a. ☐ NONREIMBURSABLE

b. ☒ REIMBURSABLE

(1) ☒ Force Account Method

(2) ☐ Lump Sum Method

(3) ☐ Third Party Contract Method

C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER

CHANGE

ORDER DESCRIPTION

PREVIOUSLY

AUTHORIZED WORK

AMOUNT(S)

NEW AUTHORIZED

WORK AMOUNT

1 PE Review $ $50,000.00

Total amount of work previously authorized………………………………………………………… $ Total amount of new work authorized by this change order…………………………………………………………………… $50,000.00 Total amount of work authorized under agreement for this Financial Project ID……………………………………… $50,000.00 PROJECT TOTAL AMOUNT OF WORK AUTHORIZED TO DATE……………………………………………………………………… $50,000.00

Examined as to provisions and participating items of cost:

Recommended: ____________________ Approved: ____________________ Date Date

Kenneth Madden District 7 Rail Administrator

Justin Hall Director of Transportation Development

Docusign Envelope ID: 6FBD1865-42BA-4B1F-9B24-9F6225010B3C

08/14/2024 | 9:57 AM EDT 08/19/2024 | 4:15 PM EDT

725-090-04A

RAIL

OGC – 12/23

EXHIBIT A

The Company shall:

1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and

2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.

OGC – 12/23

EXHIBIT B

The Company shall:

1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and

2. ensure that prefabricated items that contain steel must also comply with Buy America; and

3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.

OGC – 12/23

EXHIBIT C

The Company understands:

1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and

2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.

FLORIDA DEPARTMENT OF TRANSPORTATION

FUNDS APPROVAL

AT044

7/18/2024

CONTRACT INFORMATION

FUNDS APPROVAL INFORMATION

FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 7/18/2024

Action: Task Work Order

Reviewed or Approved: APPROVED

Organization Code: 55074010706

Expansion Option: A8

Object Code: 563000

Amount: $50,000.00

Financial Project: 45105615701

Work Activity (FCT): 127

CFDA:

Fiscal Year: 2025

Budget Entity: 55150200

Category/Category Year: 088797/25

Amendment ID: W001

Sequence: 00

User Assigned ID: CO#1

Enc Line (6s)/Status: 0001/04

Total Amount: $50,000.00

Contract: AT044

Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)

Vendor Name: CSX TRANSPORTATION, INC.

Vendor ID: F546000720022

Beginning Date of This Agreement: 07/15/2024

Ending Date of This Agreement: 12/31/2050

Contract Total/Budgetary Ceiling:

Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT

Description: CO#1 PE Review / Flagging Resurfacing Project Over CSX

Page1 of 1

To: Michael.Pokers@dot.state.fl.us

Go gle Maps

Imagery ©2024 Google, Imagery ©2024 Airbus, Maxar Technologies, Map data ©2024 Google 200 ft

Project Location Map 451056-1

624896D / RRMP:

SR797.84

CSX TRANSPORTATION – NEW PROJECT INITIATION FORM

Please provide the following information so that CSXT is able to accurately and appropriately process the project setup and billing.

Is this project associated with

Federal funds?

Is this project associated with

State funds?

Please describe the funding source for this project (i.e. INFRA, Section 130, State, County, Private, etc.).

Project Requirements:

Buy America

Additional procurement restrictions (Please describe below)

State Suspended and Debarred (Note - All federally funded projects are already monitored against the federal sus/deb listings)

Davis-Bacon (Please only check this box if this is a construction project that may be performed by an outside party)

CSX is subject to a state single audit as a recipient or subrecipient of funds (The only states that should apply here are FL or NC. FL must provide completed form DFS-A2-NS.)

Other If you selected Other, please describe below. Only complete this section if this project is associated with

Federal and/or State funds.

Project Sponsor - "Bill To" Information

Agency - Sponsor:

Billing Address:

Contact Name:

Phone:

E-mail:

Invoice Delivery Method:

Project Location:

Project Description:

Sponsor Project Ref.

Number (If applicable)

Signature of Applicant* Please sign, and e‐mail this form to the authorized CSX representative.

Name and Title of

Applicant

Signature of Applicant Date:

*By signing this form you are authorizing CSXT to incur costs and bill against this project. Should the project be canceled, CSXT will bill the Project Sponsor for the incurred costs. In the event the Project Sponsor is unresponsive for 90 days or more, the project will be closed;

and the Project Sponsor will be final billed for all project costs incurred.

Form Revision 7/18/23

If Email or Mail & Email is selected, please enter Email address(es) here:

Note: this is the agency that will be paying the invoice.

Note: this is the address to send the invoice for payment.

DDR - District Dedicated Revenue - State Funds 100%

Florida Department of Transportation

11201 N. McKinley Drive; MS 7-501, Tampa, Florida 33612

Kenneth Madden

813-975-6407

Kenneth.Madden@dot.state.fl.us

D7RailInvoices@dot.state.fl.us

US 98/SR 50A/E JEFFERSON ST FM W OF CORTEZ BLVD TO PONCE DE LEON BLVD

Resurfacing

451056-1

Kenneth Madden - Rail Administrator

No

Yes

Email

08/14/2024 | 9:57 AM EDT

File details come from the government source that posted it. Updated .