This document is a Railroad Change Order No. 1 issued by the State of Florida Department of Transportation (FDOT) for a project involving CSX Transportation Inc. The change order relates to a railroad agreement for Financial Project Number 437825-1-57-01, located on State Road 685/N Florida Avenue in Hillsborough County. The original agreement dates back to August 7, 1972, and this change order covers work for the Downtown Tampa Rail Project.
The change order authorizes the installation of a Concrete Tub Crossing, pavement upgrade, preliminary engineering, construction engineering and inspection (CEI), and flagging services. The total estimated cost of the work is $575,091.00, with a net cost increase of $22,450.00 from the previous order. The project is primarily funded by state sources, specifically 80% from District Dedicated Revenue and 20% from State Primary Highways & PTO. The work includes surface replacement, asphalt paving, maintenance of traffic, and thermoplastic striping at the N. Florida Avenue railroad crossing. The project is set to be completed by December 31, 2050, with CSX Transportation Inc. responsible for executing the specified improvements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASW61-00040000.pdf | ||
| CN-550000-ASW61-00010000.pdf | ||
| CN-550000-ASW61-00030000.pdf | ||
| CN-550000-C9Z56-00100000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04A
RAIL
OGC – 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W Number FAP Number
437825-1-57-01 SR 685/N FLORIDA
AVE HILLSBOROUGH 10020-6515 N/A
A. 1. The CSX Transportation Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Installation of Concrete Tub, Pavement Upgrade, PE, CEI & Flagging Services for DowntownTampa Rail Project. This Change Order covers all work deemed necessary for the completion of this project.
Crossing # 626298W - RRMP: A 882.49
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Original Agreement of record dated 8/7/1972 and no supplemental Agreement is required.
Original Type: Crossing Surface Signals Flagging
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. X ATTACHED
b. INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
1 Concrete Tub Crossing Replacemen 1 552,641.00 1 575,091.00
Sub-Totals ………………………………………………………………… $552,641.00 $575,091.00 Net Cost of Construction Changes, this order ………………………... $ $22,450.00 Cost of Construction Changes, previously ordered ………………….. $ $552,641.00 Net Total Cost of Construction Changes, to date…………………………………………….. $575,091.00 Contract Amount ………………………………………………………………………………… $ Estimated Cost of Work Authorized, to date………………………………………………….. $575,091.00
Examined as to provisions and participating items of cost:
Recommended: Approved: Approved:
Date Date Date
Kenneth Madden District 7 Rail Administrator
Justin Hall PE Director of Transportation
Development Division Administrator N/A
Federal Highway Administration t
DocuSign Envelope ID: DC03C73C-CE09-4D01-A364-CBBBF28C69A8
12/06/2023 | 12:50 PM EST 12/11/2023 | 9:29 AM EST
725-090-04A
RAIL
OGC – 1/21
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
OGC – 1/21
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
OGC – 1/21
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASW61
12/4/2023
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 12/4/2023
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A5
Object Code: 563000
Amount: $12,000.00
Financial Project: 43782515701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2024
Budget Entity: 55150200
Category/Category Year: 088716/24
Amendment ID: W002
Sequence: 00
User Assigned ID: CO#2
Enc Line (6s)/Status: 0002/04
Total Amount: $12,000.00
Contract: ASW61
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 05/08/2023
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Concrete Tub, Surface Upgrade, PE, CEI & Flagging
Page1 of 1
To: Michael.Pokers@dot.state.fl.us
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASW61
12/6/2023
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR JASON ADANK, CPA, COMPTROLLER ON 12/6/2023
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A5
Object Code: 563000
Amount: $10,450.00
Financial Project: 43782515701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2024
Budget Entity: 55150200
Category/Category Year: 088716/24
Amendment ID: W003
Sequence: 00
User Assigned ID: CO#2
Enc Line (6s)/Status: 0003/04
Total Amount: $10,450.00
Contract: ASW61
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 05/08/2023
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: Concrete Tub, Surface Upgrade, PE, CEI & Flagging
Page1 of 1
To: Michael.Pokers@dot.state.fl.us
ACCT. CODE : 709 - FL2827 Form Revision 12/22/21
BUY AMERICA
ESTIMATE SUBJECT TO REVISION AFTER: 3/21/2024 DOT NO.: 626298W
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Tampa Terminal MILE POST: A 882.49
AGENCY PROJECT NUMBER: FDOT 437825-1-57-01 (ASP44)
PRELIMINARY ENGINEERING:
212 Contracted & Administrative Engineering Services 16,500$
Subtotal 16,500$
CONSTRUCTION ENGINEERING/INSPECTION:
212 Contracted & Administrative Engineering Services 18,500$
Subtotal 18,500$
FLAGGING SERVICE: (Contract Labor) 70 Labor (Conductor-Flagman) 0 Days @ 350.00$ -$ 50 Labor (Foreman/Inspector) 5 Days @ 504.00$ 2,520$ 70 Additive 137.00% (Transportation Department) -$
50 Additive 160.00% (Engineering Department) 4,032$
Subtotal 6,552$
SIGNAL & COMMUNICATIONS WORK: 5,000$
TRACK WORK: 478,576$
PROJECT SUBTOTAL: 525,128$
900 CONTINGENCIES: 10.00% 52,513$
PROJECT TOTAL: ***************************************************** 577,641$
CURRENT AUTHORIZED BUDGET: ***************************************************** 25,000$
TOTAL SUPPLEMENT REQUESTED: ***************************************************** 552,641$
DIVISION OF COST:
Agency 100.00% 552,641$
Railroad 0.00% -$
NOTE: Estimate is based on FULL CROSSING CLOSURE during work by Railroad Forces.
Office of Chief Engineer Public Projects--Jacksonville, Florida
Benesch - CDS Approved by: KSW CSXT Public Project Group
DATE: 11/15/21 REVISED: 03/22/23 DATE: 04/26/23
Estimated prepared by:
This estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor rates, manpower and resource availability, and other factors known as of the date prepared. The actual cost for CSXT work may differ based upon the agency's requirements, their contractor's work procedures, and/or other conditions that become apparent once construction commences or during the progress of the work
Tampa DESCRIPTION: REVISED: N. Florida Avenue - Tub surface upgrade with asphalt, striping, MOT and LEOs. Includes
PE, CE&I, and flagging coordination services.
ACCT. CODE : 709 - FL2827 Form Revision
Pub EB - FL EB3 (FL) 10/04/21
BUY AMERICA
ESTIMATE SUBJECT TO REVISION AFTER: 12/30/1900 DOT NO.: 626298W
CITY: COUNTY: Hillsborough STATE: FL
ZONE: Florida SUB-DIV: Tampa Terminal MILEPOST: A 882.49
DRAWING NO.: __ DRAWING DATE: __
AGENCY PROJECT NUMBER:FDOT# 437825-1-57-01 (ASP44)
TRACK: MATERIAL BUY AMERICA
220 Cross Ties, Main Line 0 EA 44.00$ -$
220 Cross tie - pre-platedNot to be used for Public Projects 0 EA -$ -$
220 Cross-tie - Borate (Bundles of 16) 128 EA 56.00$ 7,168$
220 Crossties, 10' Length (Bundles of 12) 24 EA 55.00$ 1,320$
220 Pandrol Victor Plates w clips (136RE) 194 EA 34.00$ 6,596$
220 Tie plates 110 EA 10.51$ 1,156$
220 Rail, 136RE, New 360 LF 21.00$ 7,560$
220 Buffer Rail, 115RE, New 120 LF 21.00$ 2,520$
220 Misc. OTM 1 LOT 2,000.00$ 2,000$
210 Geo-Textile Fabric 0 RL 930.00$ -$
210 Sub-Drains 0 LF 6.00$ -$
220 Ballast - Car load 0 NT 12.00$ -$
220 Ballast - Trucked in 252 NT 45.00$ 11,340$
220 Field Welds 4 EA 100.00$ 400$
220 Insulated Joint Premium 136RE 4 EA 1,482.98$ 5,932$
220 Flash Butt Welds 16 EA 200.00$ 3,200$
220 Joint Bars (136RE x 16; 115RE x 16) 32 EA 50.00$ 1,600$
220 Compromise Joint Bar 115RE/100RE 8 EA 230.00$ 1,840$
220 Compromise Rail (136RE/115RE) 4 EA 900.00$ 3,600$
210 Concrete Full Width 0 TF 250.00$ -$
210 Concrete/Rubber Xing (CSX) 0 TF 200.00$ -$
210 Rubber Crossing, Full Depth 0 TF 325.00$ -$
210 Timber/Asphalt Crossing (CSX Standard) 0 TF 42.00$ -$
210 Bituminous Material 0 NT -$
210 Sales Tax on Material 7.00% 3,936$
210 Material Handling 15.00% 8,435$
Subtotal 68,603$
CONTRACT:
215 TUB-Platform (Provided by RW Summers) 1 LS 117,000.00$ 117,000$
215 Asphalt Paving (Provided by RW Summers) 1 LS 65,500.00$ 65,500$
241 Disposal of Waste Materials 340 TF 15.00$ 5,100$
215 MOT / Law Enforcement (Provided by RW Summers) 1 LS 37,740.00$ 37,740$
215 Thermo Striping (Provided by RW Summers) 1 LS 21,715.00$ 21,715$
Subtotal 247,055$
Tampa
DESCRIPTION: Construction estimate to install new 91' concrete TUB surface at N. Florida Avenue, with asphalt, MOT and LEO's.
TAMPA
Highway Speed:
Crossing Angle:
Street Types:
Thru Lanes:
Aux Lanes:
Hazmat Route?
Emergency Services Route?
Emergency Notification Signs:
Crossbuck(4x4 post):
Stop Sign:
Yield Sign:
Low Ground Clearance Signs:
Exempt Signs:
Trespass Signs:
W10-1
W10-2
W10-3
W10-4
W10-11
W10-12
R3-1a
R3-2a
R8-8
R8-9
R8-10
R8-10a
R10-6
R10-6a
R11-2
R15-2P
R15-6
R15-6a
R15-7
R15-7a
R15-8
Pvt Crossing
Look Out
R8-8 w/Beacon
W3-1
W3-3
W8-1
W10-8
W10-9
W10-9P
W10-11a
W10-11b
W10-13P
W10-14P
W10-14aP
W10-15P
Slow
W10-1w/Beacon
LED Signs
Surface Installment Date:
Surface Type:
Surface Condition:
Approach:
Vehicle Reaction:
Driver Reaction:
Rail/Pad Movement:
Maintenance Responsibility:
Roadway Paved:
Tracks run down street?
Sidewalks on Crossing Approach?
Sidewalks Thru Crossing?
Crossing illuminated?
Commerical Power?
Alternative Power?
Number of Bells:
Post Mounted Flashing Lights:
Roadway Gate Count:
Pedestrian Gate Count:
Gates:
Cantilevered Flashing Over Traffic:
Cantilevered Flashing Not Over Traffic:
Intersecting Roadway?
Signalized?
Interconnection:
Preemption:
Traffic Pre-Signals?
8" Count:
12" Count:
LED Count:
Train Speed Range:
Max Time Table Speed:
Day Thru/Switch:
Night Thru/Switch:
Train Service:
Passenger Count/Day:
Train Count Date:
Main Tracks:
Train Signals?
Train Signal Proximity:
Train Detection:
Rank 2018:
Rank 2017:
Rank 2016:
SR No.:
CR No.:
US No.:
Latitude:
Longitude:
RR Company:
Division Name:
Subdivision Name:
Branch Name:
RR Milepost:
Recommended Warning Device:
Incident History:
IN CITY
PUBLIC AT GRADE Commercial
60-90 DEG
NO
YES
YES
NO
A = No reaction
A = No reaction
A = Smooth
A = Smooth
ASPHALT
EXCELLENT
SR-685
US-41B
A 301
882.49
TAMPA TERMINAL
JACKSONVILLE
CSX
10-10
1/1
NO
NO
DC
For Traffic Signals
SIMULTANEOUS PREEMPTION
NO
YES
YES
YES
YES
NO
STATE
YES
YES
YES
YES
03/31/2011
District: 7RR Street: Roadway: N FLORIDA AVECrossing No: 626298W County: Hillsborough
Crossbuck Sign: 0
Install - Upgrade: -- 01/01/1952 Pvmt Mrk:
8000 (2021)AADT:
Percent Trucks:
School Buses:
3 (2021)
13 (2021)
27.951000
-82.460000
CFL&G&P
Other Tracks:
City: OPEN--TRACK ACTIVE
Event Recorder? N
Traffic Signals Controlling?
LED
(1) Spur/Lead
Team Members: David Grillo -
FDOT District Rail
Mike Brown - FDOT
Scott Willis - CSX
Jordan Eady - FDOT Central
Office
3 Others CSX
Date: 05/05/2021
Team Recommendations: Key Downs
Cable
Crossbucks
Field Review Comments: Tree Blocking Motorists View of Crossing & Signs
Freight
HWY
NODoes traffic queue across the tracks?
DocuSign Envelope ID: F93BA06B-6920-4935-909B-5DBA63035CED
CSX TRANSPORTATION - GOVERNMENT BILLING DEPT
NEW PROJECT FORM
To ensure compliance with Federal requirements, please provide the following information so that CSXT may accurately and appropriately setup and handle the necessary accounting associated with the proposed project.
437825-1 - SR 685 North Florida Avenue at RR Crossing 626298W
* 1) Is the project Federally Funded?
*2) Funding Source: If the project is funded by multiple sources please provide the approximate anticipated percentage of the total project cost to be paid by each source.
*3) Project Requirements
No
If multiple or other please describe here:
DOR - District Dedicated Revenue - State Funds - 80%
DS - State Primary HiQhwavs & PTO - State Funds - 20%
[Z] Procurement Restrictions (e.g. Buy America(n), Buy State, US Steel) D Procurement Restrictions Waiver
D Suspended / Debarred
D Davis-Bacon Act DE-Verify D Other, please descibe here
*4) Single Audit Type: Please advise if the project is subject to single audit requirements by completing the appropriate box below
(complete only one box).
Not Applicable ! ./ I CSX is not subject to the Single Audit.
Note: This audit is not related to the project specific audit performed by your agency.
Federal Audit D Please Specify D 0MB Circular A-133
D Uniform Guidance
Single Audit Status 1 2 :
D Vendor (CFDA # Not Required)
D Recipient (CFDA # ... I ___ __.b
D Sub-Recipient (CFDA # ! b
Florida Single Audit D (Florida Statute 215.97)
CSFA# 3 -I _______ �
Recipient. The Federal Sub-Recipient and Vendor Determination Checklist is enclosed for reference.
2 CFDA Number: IfCSX is subject to the Federal Single Audit, please provide the Catalog of Federal Domestic Assistance (CFDA) number.
3 CSFA Number: IfCSX is subject to the Florida Single Audit, please provide the Catalog of State Financial Assistance (CSFA) number.
*Please Note: Per 2 CFR 200.425(a), CSXT can recover Federal Audit costs directly through this project.
For Audit related questions, contact GBCompliance@csx.com.
5) Agency Bill To Information
*Name:
*Legal
Address (1):
*Phone:
Federal Florida Department of Transportation
Award#:
11201 N. McKinley Drive; MS 7-501, Tampa, Florida 33612 Date of
Award:
813-975-6407 ken neth. madden@dot. state. fl. us
N/A
N/A
05/11/2023
| 437825-1 - Change Order #1 Construction.pdf |
| 2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as: |
| 437825-1 - Change Order #1 Construction 2.pdf |
| 2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as: |