This document is a Railroad Change Order No. 1 issued by the Florida Department of Transportation (FDOT) for a railroad crossing improvement project involving Florida Midland Railroad Company in Polk County, Florida. The change order is associated with Financial Project Number 44887815701 for work on B Street in Frostproof, and is referenced under a Master Grade Crossing Agreement originally dated February 22, 1988.
The change order authorizes Florida Midland Railroad to install a new concrete tub crossing at Crossing No. 627542U, with a total approved cost of $109,543.00. The scope of work includes preliminary engineering, materials, labor, and equipment to install the crossing, with specific details such as installing 31 feet of MBM Crossing SystemTM, 115 lb. rail, approach ties, tie replacement, ballast rock installation, and asphalt paving. The railroad will be responsible for 100% of the crossing maintenance, and the funding is approved through the FDOT for the fiscal year 2022. The project also includes additional work such as milling and overlaying asphalt to smooth the railroad crossing and making temporary pavement markings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9S22-00110000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RON DESANTIS
GOVERNOR
Florida Department of Transportation 605 Suwannee Street
Tallahassee, FL 32399-0450
KEVIN J. THIBAULT,
P.E. SECRETARY
December 2, 2021
Ms. Karen Kuivinen Florida Midland Railroad P.O. Box 967 Plymouth, Florida 32768
NOTICE TO PROCEED
RE: FM No: 448878-1-57-01 RRMP No.: AVC 856.50
RR Crossing No.: 627542U County: Polk Description: B St.
Karen, We are enclosing one (1) fully approved Change Order No. 1, dated November 18, 2021, involving your company, and covering proposed work at $109,543.00. The work to be performed will consist of the following:
Preliminary Engineering, material, labor, expenses, and equipment to install a new concrete tub crossing at Crossing No. 627542U, RRMP AVC 856.50, Frostproof, Polk County, Florida. To include all other Railroad work deemed necessary for this project.
The work mentioned will be installed under the terms of the Master Grade Crossing Agreement dated 2/22/88.
Item 3 of said Master Agreement will be modified to read that the Railroad will be responsible for 100% of the Crossing Maintenance. Use of this agreement is for funding purposes only and in no way changes the maintenance agreement between Florida Midland and the City.
Should you have any questions or need additional information, please let me know.
Thanks, Barb Daugherty GEC Rail Project Manager
District One – Rail Office Office 863/519-2437 Cell 863/368-2245 barbara.daugherty@dot.state.fl.us
BD:bd Enc. c.c.
Central Office Rail MS-25 w/attachment Project File
Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov mailto:barbara.daugherty@dot.state.fl.us http://www.fdot.gov/
DocuSign Envelope ID: 5F5A8980-5D23-4F19-996A-F48B2F8788D6
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
7 2 5 - 0 9 0 - 0 4 B R A I L O G C – 1 / 2 1 P a g e 1 o f 4
Financial Project Number Road Name or Number County Name Parcel & R/W
Number
FAP
Number
44887815701 B St. Polk 57 16150-XNGB D122003B
A. 1. The Florida Midland Railroad Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work, accordingly, further described as:
Preliminary Engineering, material, labor, expenses, and equipment to install a new concrete tub crossing at Crossing No. 627542U, RRMP AVC 856.50, Frostproof, Polk County, Florida. To include all other Railroad work deemed necessary for this project.
The work mentioned will be installed under the terms of the Master Grade Crossing Agreement dated 2/22/88. Item 3 of said Master Agreement will be modified to read that the Railroad will be responsible for 100% of the Crossing Maintenance. Use of this agreement is for funding purposes only and in no way changes the maintenance agreement between Florida Midland and the City.
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original
Railroad Agreement.
0. The items of work covered by this Change Order are referenced to an Master Agreement of record dated
02/22/1988 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. X ATTACHED
. INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(0) Lump Sum Method
(1) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY
PE, material, labor, equipment 109,543.00
Sub-Totals Net Cost of Construction Changes, this order
Cost of Construction Changes, previously ordered
Net Total Cost of Construction Changes, to date
Contract Amount
Estimated Cost of Work Authorized, to date
$ $109,543.00
$ $109,543.00
$109,543.00
$109,543.00
Examined as to provisions and participating items of cost:
11/18/2021 | 1:59 PM EST 11/18/2021 | 2:20 PM EST
Recommended: __________________________ Approved: _________________________ Approved:
Date Date Date
District Rail Administrator Modal Development Administrator Division Administrator N/A
Federal Highway Administration
725-090-04B
RAIL OGC –
1/21 Page 2 of 4
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
RAIL OGC –
1/21 Page 3 of 4
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
RAIL OGC –
1/21 Page 4 of 4
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
To: Barbara.Daugherty@dot.state.fl.us
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASQ65
11/12/2021
CONTRACT INFORMATION
Contract: ASQ65
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Vendor Name: FLORIDA MIDLAND RAILROAD CO, IN
Vendor ID: F581758851001
Beginning Date of This Agreement: 11/09/2021
Ending Date of This Agreement: 11/09/2031
Contract Total/Budgetary Ceiling:
Description: 448878-1 B Street, Polk County
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 11/12/2021
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55012020129
Expansion Option: A9
Object Code: 563000
Amount: $109,543.00
Financial Project: 44887815701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2022
Budget Entity: 55100100
Category/Category Year: 088808/22
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $109,543.00
Page1 of 1 mailto:Barbara.Daugherty@dot.state.fl.us
Crossing No: 627542U Roadway: B ST RR Street: District: 1 County: Polk
PUBLIC HWY AT GRADE Commercial City: Frostproof IN CITY OPEN--TRACK ACTIVE
Rank 2018:
Rank 2017:
Rank 2016:
Field Review Comments:
SR No.:
CR No.:
US No.:
Latitude:
Longitude:
27.748500
-81.530000
RR Company:
Division Name:
Subdivision Name:
Branch Name: RR
Milepost:
AVC 821
856.50
TAMPA
MIAMI
FMID Date: 04/22/2019
Team Members: Steve
Justice, Rob Stapleton, Laura
Miller, Jordan Eady, Lisa
Revell- Petro, Arlene Barnes, Barbara Daugherty
Team Recommendations: New Tub
AADT: 728 (2008)
Percent Trucks:
School Buses:
Highway Speed:
Crossing Angle:
60-90 DEG
0 (2009)
0 (2020) Train Service:
Train Speed Range:
Max Time Table Speed:
Day Thru/Switch: Night
Thru/Switch:
Freight
5-10
0/2
0/0
Street Types:
Thru Lanes:
Aux Lanes:
Hazmat Route?
Emergency Services Route?
T w o -
W a y
S t r e e t 2
0 N O
YES
Passenger Count/Day:
Train Count Date:
Main Tracks:
Other Tracks:
05/12/2012
Crossbuck Sign: 2
Emergency Notification Signs:
Crossbuck(4x4 post):
NO
Train Signals?
Train Signal Proximity:
Train Detection:
N O N O
N o n e
Surface Condition:
Approach:
Vehicle Reaction:
Driver Reaction:
Rail/Pad Movement:
Stop Sign:
Yield Sign:
Low Ground Clearance Signs:
Exempt Signs:
Trespass Signs:
W10-1
W10-2
W10-3
W10-4
W10-11
W10-12
R3-1a
R3-2a
R8-8
R8-9
R8-10
R8-10a
R10-6
Surface Installment Date:
Surface Type:
Pvmt Mrk: DYNAMIC ENVELOPE
Incident History:
R 1 0 - 6 a
R 1 1 - 2
R 1 5 - 2 P
R 1 5 - 6
R 1 5 - 6 a
R 1 5 - 7
R 1 5 - 7 a
R 1 5 - 8 P v t
C r o s s i n g
L o o k O u t
R 8 - 8 w / B e a c o n
W 3 - 1 W 3 - 3
LOS B = Vibrating
LOS B = Some drivers slow down
LOS A = Smooth
LOS B = Uneven
EXCELLENT
ASPHALT
W 8 - 1
W 1 0 - 8
W 1 0 - 9
W 1 0 - 9 P
W 1 0 - 1 1 a
W 1 0 - 1 1 b
W 1 0 - 1 3 P
W 1 0 - 1 4 P
W 1 0 - 1 4 a P
W 1 0 - 1 5 P
S l o w W 1 0 -
1 w / B e a c o n
L E D S i g n s
NO
Maintenance Responsibility:
Roadway Paved: Tracks run down street? Sidewalks on
Crossing Approach?
Sidewalks Thru Crossing?
Crossing illuminated?
Commerical Power?
Alternative Power?
Roadway Gate Count:
Pedestrian Gate Count:
Gates:
Cantilevered Flashing Over Traffic:
Cantilevered Flashing Not Over Traffic:
Intersecting Roadway?
Signalized?
Interconnection:
Traffic Signals Controlling?
Traffic Pre-Signals?
8" Count:
12" Count:
LED Count:
Does traffic queue across the tracks? NO
Number of Bells:
Post Mounted Flashing Lights:
Preemption:
Install - Upgrade: --
Event Recorder?
Not Interconnected
C I T Y
Y E S
N O
Y E S
N O
YES
NO
NO
NO
NO
NO
Recommended Warning Device: FL & G
DIAGNOSTIC FIELD REVIEW SUPPLEMENTAL FORM
Crossing Number/Mile Post: Street/Road Name: Date:
OBSERVATIONS
RECOMMENDATIONS
1:
2:
3:
FREIGHT@dot.state.fl.us 6-12-20 Page 1 of 1 mailto:FREIGHT@dot.state.fl.us
DIAGNOSTIC FIELD REVIEW SIGN-IN SHEET
Date:
NAME ORGANIZATION EMAIL ADDRESS PHONE NUMBER
FREIGHT@dot.state.fl.us 6-12-20 Page 1 of 1 mailto:FREIGHT@dot.state.fl.us
FLORIDA CENTRAL RAILROAD CO INC
FLORIDA MIDLAND RAILROAD CO INC
FLORIDA NORTHERN RAILROAD INC
3001 W Orange Ave Apopka Fl 32703 · PO Box 967 Plymouth Fl 32768 · 407-880-8500
FDOT District Rail Administration January 11, 2021
Barbara Daugherty
Dear Barb, Florida Midland Railroad is please to submit the following quotation to install concrete tub crossings at the below locations in Frostproof, Polk County, Florida.
To Include:
Maintenance of traffic
Furnish all materials
Mobilization
Cutting of asphalt
Removal of existing crossing surface and track
Preparation of grade and installation of base rock
Installation of MBM Crossing SystemTM with 115 lb. rail
Transition from 115 lb. rail to 100 lb. rail to 85 lb. rail
Installation of 10 each 10' approach ties at each end of crossing
Replacement of 25 each Size 5 ties in track on each side of crossing
Installation of ballast rock on 10' approach ties
Surfacing and tamping of 10' approach ties
Installation of road base
Asphalt paving
Disposal of debris
5. F Street, Frostproof: Sidewalk included
Furnish and install 31' of MBM Crossing SystemTM. ........................................................... $78,820.00
6. B Street, Frostproof: Awaiting updated quote
Furnish and install 31' of MBM Crossing SystemTM. ........................................................... $78,820.00
Mill level and overlay asphalt attempting to smooth elevated Railroad crossing.
Match existing asphalt approximately 50 feet west and 75 feet east of Railroad.
Price includes adjustment of manhole on east side of Railroad and temporary pavement markings. ............................................................................................................ $16,434.00
1. Wall Street, Frostproof:
Furnish and install 60' of MBM Crossing SystemTM. ........................................................... $102,169.00
4. East 3rd Street, Frostproof:
Furnish and install 31' of MBM Crossing SystemTM. $78,820.00
2. 9th Street, Frostproof:
Furnish and install 35.5' of MBM Crossing SystemTM. ....................................................... $81,145.00
3. 11th Street, Frostproof:
Furnish and install 31' of MBM Crossing SystemTM. ........................................................... $78,820.00
When funded please add 10% as Railroad administration and oversight costs.
CROSSING SURFACES
Type Definition
C Concrete
R Rubber
RA Rubber/Asphalt
TA Timber/Asphalt
STOP ZONE FOR RUBBER CROSSING
Design Speed
(mph)
Zone Leng th
(D i s tance F rom S top )
45 Or Less 250'
50 - 55 350'
60 - 65 500'
70 600'
N o t e s :
1. Type R Crossings are NOT to be used for mul t ip le t rack crossings wi thin zones for an ex is t ing or scheduled future vehicular s top. Zone lengths are char ted above.
2. S ingle t rack Type R Crossings wi thin the zones on the chart may be used unless engineering or safety
GENERAL NOTES
I . The Rai l road Company wi l l furnish and instal l a l l t rack bed (ba l last) , crosst ies, ra i ls , crossing surface panels and accessory components.
A l l pavement mater ia l , inc luding that through the crossing, wi l l be furnished and instal led by the Department or i ts Contractor, un less negot iated otherwise.
2 . When a ra i l road grade c ross ing i s located wi th in the l im i ts o f a h ighway cons t ruc t ion pro jec t , a t rans i t ion pavement w i l l be main ta ined a t the approaches o f the c ross ing to reduce veh icu lar impacts to the c ross ing . The t rans i t ion pavement w i l l be main ta ined as appropr ia te to pro tec t the c ross ing f rom low clearance veh ic les and veh icu lar impacts unt i l the cons t ruc t ion pro jec t i s comple ted and the f ina l h ighway sur face i s cons t ruc ted.
3 . The C ent ra l Ra i l Of f i ce w i l l ma in ta i n a l i s t o f cur rent l y used R ai l road Cros s ing Produc t s and w i l l pe r i od ica l l y d is t r i bu te t he cur rent l i s t t o the D is t r i c t O f f i ces as the l i s t i s updated.
4 . The Rai l road Company sha l l submi t eng ineer ing drawings for the proposed c ross ing sur face type to the Const ruc t ion Pro ject Eng ineer and/or the D is t r i c t Rai l Of f i ce fo r concur rence a long w i th the L is t o f Ra i l road Cross ing Products . The approved eng ineer ing d raw ings o f the c ross ing sur face type sha l l be made a par t o f the ins ta l la t ion agreement .
5 . S idewalks shal l be cons truc ted through the crossing between approach s idewalks o f the c rossing. S idewalks sha l l be cons t ruc ted wi th appropr iate mater ia l to al low unobst ruc ted t rave l th rough the crossing in accordance wi th ADA requi rements .
6 . Instal l pavement in accordance wi th the Speci f icat ions.
7 . The D epar tmen t w i l l par t i c ipa te in c ross ing w ork , t ha t requ i res ad jus tmen ts to ra i l ou ts i de o f the c ross ing, no more than 50 feet f rom the edge o f the t rave l way .
9:
:0
A M
O
LAST
REVISION
11/01/17
DESCRIPTION:
FY 2021-22
STANDARD PLANS
I N D E X
830-T01
R E
V
IS
IO
N S H E E T
FDOT RAILROAD (GRADE ) CROSSING
3' Curb Transition Min.) _
Drop Curb
, , , , — 7 - - C o n c re t e C u r b A nd Gu t te r
Varies (8' M n.) Varies (8'
(Width Varies)
3' Curb Transi t ion —\
Drop Curb
Concrete Curb And Gutter
Utility Strip
Asphalt
N
2' Setback
Note : For locat ion o f ra i l road s igna ls , ga tes or s igna ls and gates see Index 509-070
Ut i l i ty St r ip
Sidewalk or Trai l
Asphalt or Concrete to Match Adjacent Surface
Shoulder Pavement When
Crossing Mater ials Do Not
Extend Beyond Lip Of Gutter
Beveled Edge (1:4 Slope)
In
Railroad Signal, Gate Or Signal And Gate
Varies (2' Min.)
Beveled Edge (1:4 Slope)
Shoulder Line* vi
* Where the exist ing shoulder is substandard for the faci l i ty type, the shoulder width is to be widened to accommodate crossing shoulder pavement.
/— See 'Crossing Shoulder Pavement' Above
50' Min.
With Or Without Signal, Gate Or Signal And Gate
Flexible Pavement
HALF PLAN
ROADWAYS WITH FLUSH SHOULDERS
C Pavement
Shoulder Pavement
Edge Of Travel Way
HALF PLAN
CURBED ROADWAYS
C Track
C RailC Rail
30'
30' r
Level
Varies
(1' To 4.5')
RR Crossing Varies
(Full Depth Asphalt/Rubber Shown)
Cap Or Expansion Mater ia l
(When Required
Varies
(1' To 4.5')
Crossing Shoulder Pavement
(Except Area Occupied By Crossing Surfacing Material ) :
a. To Shoulder Line For Outside Shoulders Less Than 8' Wide.
b. To 8' Maximum Width For Outside Shoulders 8' Or Wider
(Regardless Of Approach Shoulder Pavement Width).
c . 4' For Median Shoulders.
QO
Cw
0 TYPICAL CROSSING MATERIAL REPLACEMENT AT RR
CROSSINGS
C Railroad
C Pavement iL ______
Cro sing Mater ials
SECTION VIEW
Type SP Asphalt (500 Lb/SY)
Filter Fabric (Optional
With RR Company)
By Crossing Type)Frict ion Course
Overbuild
Exist. Rdwy. Pavt.
Frict ion Course
Overbuild
Exist. Rdwy. Pavt.
Type SP Asphalt (500 Lb/SY)
Filter Fabric (Optional
With RR Company)9 :1
:0
A
M
LAST
REVISION
11/01/19
DESCRIPTION:
FY 2021-22
STANDARD PLANS RAILROAD (GRADE ) CROSSING
R E
V
IS
IO
N
FDOT
INDEX SHEET
830-T01 2 of 2
To p reven t l ow-c learance veh ic les f rom becomi ng caught on t he t r acks , t he c ross ing s ur f ace shou l d be a t the same p l ane as the t op o f the ra i l s fo r a d i s tance o f 2 f ee t outs i de the ra i l s . The su r face o f the h ighway shou ld a l so no t be more t han 3 i nches h i gher or l ow er than the top o f the neares t ra i l a t a po i n t 30 feet f r om the ra i l un l ess t rack supere levat ion makes a d i f f e rent lev e l appropr i a te . V er t i ca l cu rves shou ld be used t o t rave rse f rom the h i ghw ay g rade to a l eve l p lane a t t he e l eva t ion o f t he ra i l s . Ra i l s t ha t a re supe re levated, o r a roadw ay approach sec t i on that i s not l eve l , w i l l necess i ta te a s i te spec i f i c ana lys is fo r ra i l c l ea rances .
VERTICAL ROADWAY ALIGNMENT THROUGH A RAILROAD CROSSING
File details come from the government source that posted it. Updated .