This document is a Notice to Proceed and Railroad Change Order from the Florida Department of Transportation (FDOT) involving Florida Midland Railroad Company for a railroad crossing improvement project in Polk County, Florida. The contract is associated with Financial Project Number 44887915701 for County Road 630, and involves District One's Rail Office. The document includes a Change Order, Funds Approval form, and supporting documentation such as quotation details from Florida Midland Railroad.
The project involves installing a new PMD-4, shunt enhancers, and remote equipment at Railroad Crossing No. 627540F (RRMP AVC 855.99) in Frostproof, Florida. The total cost is $32,718.00, with FDOT agreeing to pay for materials and Florida Midland Railroad responsible for all other costs. The work will be performed under the terms of a Grade Crossing Traffic Control Devices Agreement dated 01/17/2006. The contract is set for a ten-year period from 11/09/2021 to 11/09/2031, with the procurement method classified as a Railroad/Utilities Agreement. The project aims to enhance railroad crossing safety and is part of FDOT's broader mobility and innovation initiatives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASI02.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RON DESANTIS
GOVERNOR
Florida Department of Transportation 605 Suwannee Street
Tallahassee, FL 32399-0450
KEVIN J. THIBAULT,
P.E. SECRETARY
December 2, 2021
Ms. Karen Kuivinen
Florida Midland Railroad
P.O. Box 967
Plymouth, Florida 32768
NOTICE TO PROCEED
RE: FM No: 448879-1-57-01 RRMP No.: AVC 855.99
RR Crossing No.: 627540F County: Polk Description: CR 630
Karen, We are enclosing one (1) fully approved Change Order No. 1, dated November 18, 2021, involving your company, and covering proposed work at $32,718.00. The work to be performed will consist of the following:
Install a new PMD-4, shunt enhancers and remote at Crossing No. 627540F, RRMP AVC 855.99, Polk County, Florida. Florida Department of Transportation will pay for the material only, Florida Midland will pay all other costs. To include all other Railroad work deemed necessary for this project.
The work mentioned will be installed under the terms of the Grade Crossing Traffic Control Devices Agreement dated 01/17/2006.
Should you have any questions or need additional information, please let me know.
Thanks, Barb Daugherty GEC Rail Project Manager
District One – Rail Office
Office 863/519-2437 Cell 863/368-2245 barbara.daugherty@dot.state.fl.us
BD:bd
Enc. c.c.
Central Office Rail MS-25 w/attachment Project File
Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov mailto:barbara.daugherty@dot.state.fl.us http://www.fdot.gov/
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04B
RAIL
OGC – 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W
Number
FAP
Number
44887915701 CR 630 Polk 57 16150-2104 D122003B
A. 1. The Florida Midland Railroad Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Install a new PMD-4, shunt enhancers and remote at Crossing No. 627540F, RRMP AVC 855.99, Polk County, Florida. Florida Department of Transportation will pay for the material only, Florida Midland will pay all other costs. To include all other Railroad work deemed necessary for this project.
The work mentioned will be installed under the terms of the Grade Crossing Traffic Control Devices Agreement dated 01/17/2006.
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original
Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated
01/17/2006 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. X ATTACHED
b. INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
PMD-4, shunt enhancers and 32,718.00 remote
Sub-Totals ………………………………………………………………… $ $32,718.00
Net Cost of Construction Changes, this order ………………………... $ $32,718.00
Cost of Construction Changes, previously ordered ………………….. $ $
Net Total Cost of Construction Changes, to date…………………………………………….. $32,718.00
Contract Amount ………………………………………………………………………………… $
Estimated Cost of Work Authorized, to date………………………………………………….. $32,718.00
Examined as to provisions and participating items of cost:
Recommended:
Approved:
Approved:
Date
District Rail Administrator
Modal Development Administrator
Division Administrator
N/A
Federal Highway Administration
DocuSign Envelope ID: 4483BE52-1236-4FE5-BE54-E86E546EF309
11/18/2021 | 3:26 PM EST 11/18/2021 | 4:24 PM EST
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASQ64
11/12/2021
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 11/12/2021
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55012020129
Expansion Option: A9
Object Code: 563000
Amount: $32,718.00
Financial Project: 44887915701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2022
Budget Entity: 55100100
Category/Category Year: 088808/22
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $32,718.00
Contract: ASQ64
Contract Type: AB - RR SIGNALS-MAINT (RR-SIG/MTE)
Vendor Name: FLORIDA MIDLAND RAILROAD CO, IN
Vendor ID: F581758851001
Beginning Date of This Agreement: 11/09/2021
Ending Date of This Agreement: 11/09/2031
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: 448879-1 CR 630, Polk County
Page1 of 1
To: Barbara.Daugherty@dot.state.fl.us
Frostproof
Highway Speed:
Crossing Angle:
Street Types:
Thru Lanes:
Aux Lanes:
Hazmat Route?
Emergency Services Route?
Emergency Notification Signs:
Crossbuck(4x4 post):
Stop Sign:
Yield Sign:
Low Ground Clearance Signs:
Exempt Signs:
Trespass Signs:
W10-1
W10-2
W10-3
W10-4
W10-11
W10-12
R3-1a
R3-2a
R8-8
R8-9
R8-10
R8-10a
R10-6
R10-6a
R11-2
R15-2P
R15-6
R15-6a
R15-7
R15-7a
R15-8
Pvt Crossing
Look Out
R8-8 w/Beacon
W3-1
W3-3
W8-1
W10-8
W10-9
W10-9P
W10-11a
W10-11b
W10-13P
W10-14P
W10-14aP
W10-15P
Slow
W10-1w/Beacon
LED Signs
Surface Installment Date:
Surface Type:
Surface Condition:
Approach:
Vehicle Reaction:
Driver Reaction:
Rail/Pad Movement:
Maintenance Responsibility:
Roadway Paved:
Tracks run down street?
Sidewalks on Crossing Approach?
Sidewalks Thru Crossing?
Crossing illuminated?
Commerical Power?
Alternative Power?
Number of Bells:
Post Mounted Flashing Lights:
Roadway Gate Count:
Pedestrian Gate Count:
Gates:
Cantilevered Flashing Over Traffic:
Cantilevered Flashing Not Over Traffic:
Intersecting Roadway?
Signalized?
Interconnection:
Preemption:
Traffic Pre-Signals?
8" Count:
12" Count:
LED Count:
Train Speed Range:
Max Time Table Speed:
Day Thru/Switch:
Night Thru/Switch:
Train Service:
Passenger Count/Day:
Train Count Date:
Main Tracks:
Train Signals?
Train Signal Proximity:
Train Detection:
Rank 2018:
Rank 2017:
Rank 2016:
SR No.:
CR No.:
US No.:
Latitude:
Longitude:
RR Company:
Division Name:
Subdivision Name:
Branch Name:
RR Milepost:
Recommended Warning Device:
Incident History:
IN CITY
PUBLIC AT GRADE Commercial
60-90 DEG
Two-Way Street
NO
YES
YES
NO
LOS D = Bouncing
LOS B = Some drivers slow down
LOS A = Smooth
LOS D = Severe erosion
ASPHALT
EXCELLENT
CR-630
MAIN
855.99
W. LAKE WALES
FMID
FMID
5-10
0/1
0/1
NO
NO
Other
Not Interconnected
NO
YES
YES
NO
YES
NO
COUNTY
YES
YES
YES
NO
05/12/2012
District: 1RR Street: Roadway: CR-630Crossing No: 627540F County: Polk
Crossbuck Sign: 4
Install - Upgrade: -- 01/01/1978 Pvmt Mrk:
1100 (2020)AADT:
Percent Trucks:
School Buses:
23 (2020)
12 (2020)
27.755800
-81.530000
FL & G & P
Other Tracks:
2 Quad
City: OPEN--TRACK ACTIVE
Event Recorder?
Traffic Signals Controlling?
Backlights, LED
LED
Team Members: Steve
Justice, Rob Stapleton, Laura
Miller, Jordan Eady, Lisa
Revell- Petro, Arlene Barnes, Barbara Daugherty
Date: 04/22/2019
Team Recommendations: Lost cost upgrade - Train Detection, shunt enhancers, remote
FDOT will pay for material RR will pay for all other costs
Field Review Comments:
Freight
HWY
NODoes traffic queue across the tracks?
DIAGNOSTIC FIELD REVIEW SUPPLEMENTAL FORM
Crossing Number/Mile Post: Street/Road Name: Date:
OBSERVATIONS
RECOMMENDATIONS
1:
2:
3:
6-12-20 Page 1 of 1FREIGHT@dot.state.fl.us
DIAGNOSTIC FIELD REVIEW SIGN-IN SHEET
Date:
NAME ORGANIZATION EMAIL ADDRESS PHONE NUMBER
6-12-20 Page 1 of 1FREIGHT@dot.state.fl.us
FLORIDA CENTRAL RAILROAD CO INC
FLORIDA MIDLAND RAILROAD CO INC
FLORIDA NORTHERN RAILROAD INC
3001 W Orange Ave Apopka Fl 32703 · PO Box 967 Plymouth Fl 32768 · 407-880-8500
FDOT District Rail Administration January 7, 2021 Barbara Daugherty
Dear Barb, Florida Midland Railroad is please to submit the following quotation to install PMD-4 NON Redundant Motion at the railroad signalized locations below at a cost of $32,718.00 each.
To Include:
ITEM DESCRIPTION QTY U/M
PMD-4, NON Redundant Motion 1 EA Surge Arrestor. MDSA-1XS 1 EA DC Shunting Enhancer 1 EA Shunt, NBS-1 (210-979 Hz) 2 EA #10 TC Blue Flex Wire 200 FT #10/12 AMP Eyelets 50 EA Tags, Slip On 0.25 Roll ST-1 Relay Socket w/Test Posts, (22) 10-14 Flag 4 EA Terminal Flag #10-#14 30 EA Relay, ST-1, 4FB-2F-1B, 500ohm 4 EA DTMF Controller 1 EA DTMF Antenna Kit 1 EA
• CR17B /627527S AVC 846.25/ Lake Wales Fl
• Golfview Cutoff Rd. /627532N AVC 849.58 / Lake Wales Fl
• CR630/627540F AVC 855.99/ Frostproof Fl
Best Regards, Manager of RE/Contracts
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
File details come from the government source that posted it. Updated .