CN-550000-ASN77-W0010000.pdf
PDF 726 KB Posted
- Contract number
- ASN77
- Issued by
- Florida
About this file
This document is a Railroad Change Order (No. 1) issued by the Florida Department of Transportation (FDOT) to Florida Midland Railroad Company, involving a railroad crossing improvement project in Polk County, Florida. The project is associated with Financial Project Number 44884515701 for work on F Street in Frostproof, and is referenced under a Master Agreement dated 2/22/1988. The change order involves multiple exhibits outlining requirements for employment verification, Buy America provisions, and non-discrimination assurances.
The change order authorizes preliminary engineering, materials, labor, expenses, and equipment to install a new concrete tub crossing at Crossing No. 627541M, with a total cost of $90,643.00. The work includes installation of an MBM Crossing System with 115 lb. rail, transition between rail sizes, approach tie installation, track tie replacement, ballast rock installation, surfacing, and asphalt paving. Notably, the agreement modifies the original Master Agreement to make the Railroad responsible for 100% of Crossing Maintenance. The project is fully reimbursable using the Force Account Method, and the funds were approved on 5/27/2021 with a contract period from 05/20/2021 to 05/20/2031.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-C9P28-W0010000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RON DESANTIS
GOVERNOR
Florida Department of Transportation 605 Suwannee Street
Tallahassee, FL 32399-0450
KEVIN J. THIBAULT,
P.E. SECRETARY
June 1, 2021
Ms. Karen Kuivinen Florida Midland Railroad P.O. Box 967 Plymouth, Florida 32768
NOTICE TO PROCEED
RE: FM No: 448845-1-57-01 RRMP No.: AVC 856.24
RR Crossing No.: 627541M County: Polk Description: F St.
Karen, We are enclosing one (1) fully approved Change Order No. 1, dated June 1, 2021, involving your company, and covering proposed work at $90,643.00. The work to be performed will consist of the following:
Preliminary Engineering, material, labor, expenses, and equipment to install a new concrete tub crossing at Crossing No. 627541M, RRMP AVC 856.24, Frostproof, Polk County, Florida. To include all other Railroad work deemed necessary for this project.
The work mentioned will be installed under the terms of the Grade Crossing Agreement dated 2/22/88. Item 3 of said Master Agreement will be modified to read that the Railroad will be responsible for 100% of the Crossing Maintenance.
Should you have any questions or need additional information, please let me know.
Thanks, Barb Daugherty GEC Rail Project Manager District One – Rail Office Office 863/519-2437 Cell 863/368-2245 barbara.daugherty@dot.state.fl.us
BD:bd Enc. c.c.
Central Office Rail MS-25 w/attachment Project File
Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov mailto:barbara.daugherty@dot.state.fl.us http://www.fdot.gov/
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04B
RAIL
OGC – 1/21
Financial Project Number Road Name or Number County Name Parcel & R/W
Number
FAP
Number
44884515701 F St. Polk 57 (16150-6504) D120070B
A. 1. The Florida Midland Railroad Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary Engineering, material, labor, expenses, and equipment to install a new concrete tub crossing at Crossing No. 627541M, RRMP AVC 856.24, Frostproof, Polk County, Florida. To include all other Railroad work deemed necessary for this project.
The work mentioned will be installed under the terms of the Grade Crossing Agreement dated 2/22/88.
Item 3 of said Master Agreement will be modified to read that the Railroad will be responsible for 100% of the Crossing Maintenance.
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original
Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated
02/22/1988 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. X ATTACHED
b. INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
PE, material, labor, expenses, 90,643.00 equipment to install a new tub
Sub-Totals ………………………………………………………………… $ $90,643.00
Net Cost of Construction Changes, this order ………………………... $ $90,643.00
Cost of Construction Changes, previously ordered ………………….. $ $0.00
Net Total Cost of Construction Changes, to date…………………………………………….. $90,643.00
Contract Amount ………………………………………………………………………………… $0.00
Estimated Cost of Work Authorized, to date………………………………………………….. $90,643.00
Examined as to provisions and participating items of cost:
Recommended:
Approved:
Approved:
Date
District Rail Administrator
Modal Deverlopment Administrator
Division Administrator
N/A
Federal Highway Administration
DocuSign Envelope ID: 99F068C7-414E-4F0D-BDBD-EFF747E0C5F8
5/28/2021 | 11:32 AM EDT 6/1/2021 | 8:11 AM EDT
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASN77
5/27/2021
CONTRACT INFORMATION
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 5/27/2021
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55012020129
Expansion Option: A9
Object Code: 563000
Amount: $90,643.00
Financial Project: 44884515701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2021
Budget Entity: 55100100
Category/Category Year: 088808/21
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $90,643.00
Contract: ASN77
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Vendor Name: FLORIDA MIDLAND RAILROAD CO, IN
Vendor ID: F581758851001
Beginning Date of This Agreement: 05/20/2021
Ending Date of This Agreement: 05/20/2031
Contract Total/Budgetary Ceiling:
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Description: 448845-1 F St., Polk County
Page1 of 1
To: Barbara.Daugherty@dot.state.fl.us
Frostproof
Highway Speed:
Crossing Angle:
Street Types:
Thru Lanes:
Aux Lanes:
Hazmat Route?
Emergency Services Route?
Emergency Notification Signs:
Crossbuck(4x4 post):
Stop Sign:
Yield Sign:
Low Ground Clearance Signs:
Exempt Signs:
Trespass Signs:
W10-1
W10-2
W10-3
W10-4
W10-11
W10-12
R3-1a
R3-2a
R8-8
R8-9
R8-10
R8-10a
R10-6
R10-6a
R11-2
R15-2P
R15-6
R15-6a
R15-7
R15-7a
R15-8
Pvt Crossing
Look Out
R8-8 w/Beacon
W3-1
W3-3
W8-1
W10-8
W10-9
W10-9P
W10-11a
W10-11b
W10-13P
W10-14P
W10-14aP
W10-15P
Slow
W10-1w/Beacon
LED Signs
Surface Installment Date:
Surface Type:
Surface Condition:
Approach:
Vehicle Reaction:
Driver Reaction:
Rail/Pad Movement:
Maintenance Responsibility:
Roadway Paved:
Tracks run down street?
Sidewalks on Crossing Approach?
Sidewalks Thru Crossing?
Crossing illuminated?
Commerical Power?
Alternative Power?
Number of Bells:
Post Mounted Flashing Lights:
Roadway Gate Count:
Pedestrian Gate Count:
Gates:
Cantilevered Flashing Over Traffic:
Cantilevered Flashing Not Over Traffic:
Intersecting Roadway?
Signalized?
Interconnection:
Preemption:
Traffic Pre-Signals?
8" Count:
12" Count:
LED Count:
Train Speed Range:
Max Time Table Speed:
Day Thru/Switch:
Night Thru/Switch:
Train Service:
Passenger Count/Day:
Train Count Date:
Main Tracks:
Train Signals?
Train Signal Proximity:
Train Detection:
Rank 2018:
Rank 2017:
Rank 2016:
SR No.:
CR No.:
US No.:
Latitude:
Longitude:
RR Company:
Division Name:
Subdivision Name:
Branch Name:
RR Milepost:
Recommended Warning Device:
Incident History:
IN CITY
PUBLIC AT GRADE Residental
60-90 DEG
Two-Way Street
NO
YES
YES
NO
LOS C = Shaking
LOS B = Some drivers slow down
LOS A = Smooth
LOS C = Minor erosion
ASPHALT
EXCELLENT
AVC 821
856.24
LAKE WALES
JACKSONVILLE
FMID
5-20
2/
0/
NO
NO
None
Not Interconnected
NO
NO
YES
NO
YES
NO
CITY
YES
YES
YES
NO
05/12/2012
District: 1RR Street: Roadway: E F STCrossing No: 627541M County: Polk
Crossbuck Sign: 2
Install - Upgrade: -- Pvmt Mrk: STOP LINES
367 (2011)AADT:
Percent Trucks:
School Buses:
0 (2009)
2 (2020)
27.752100
-81.530000
XBUCKS
Other Tracks:
City: OPEN--TRACK ACTIVE
Event Recorder?
Traffic Signals Controlling?
Team Members: Steve
Justice, Rob Stapleton, Laura
Miller, Jordan Eady, Lisa
Revell- Petro, Arlene Barnes, Barbara Daugherty
Date: 04/22/2019
Team Recommendations: New Tub - look at putting tub thru sidewalk on the North side
Field Review Comments:
Freight
HWY
NODoes traffic queue across the tracks?
FLORIDA CENTRAL RAILROAD CO INC
FLORIDA MIDLAND RAILROAD CO INC
FLORIDA NORTHERN RAILROAD INC
3001 W Orange Ave Apopka Fl 32703 · PO Box 967 Plymouth Fl 32768 · 407-880-8500
FDOT District Rail Administration January 11, 2021 Barbara Daugherty
Dear Barb, Florida Midland Railroad is please to submit the following quotation to install concrete tub crossings at the below locations in Frostproof, Polk County, Florida.
To Include:
• Maintenance of traffic
• Furnish all materials
• Mobilization
• Cutting of asphalt
• Removal of existing crossing surface and track
• Preparation of grade and installation of base rock
• Installation of MBM Crossing System™ with 115 lb. rail
• Transition from 115 lb. rail to 100 lb. rail to 85 lb. rail
• Installation of 10 each 10' approach ties at each end of crossing
• Replacement of 25 each Size 5 ties in track on each side of crossing
• Installation of ballast rock on 10' approach ties
• Surfacing and tamping of 10' approach ties
• Installation of road base
• Asphalt paving
• Disposal of debris
5. F Street, Frostproof: Sidewalk included Furnish and install 31' of MBM Crossing System™. ……………………………………………….. $78,820.00
6. B Street, Frostproof: Awaiting updated quote Furnish and install 31' of MBM Crossing System™. ……………………………………………….. $78,820.00 Mill level and overlay asphalt attempting to smooth elevated Railroad crossing.
Match existing asphalt approximately 50 feet west and 75 feet east of Railroad.
Price includes adjustment of manhole on east side of Railroad and temporary pavement markings. ….............................................................................................. $16,434.00
1. Wall Street, Frostproof:
Furnish and install 60' of MBM Crossing System™. ………………………………………………… $102,169.00
4. East 3rd Street, Frostproof:
Furnish and install 31' of MBM Crossing System™. …………………………………………………… $78,820.00
2. 9th Street, Frostproof:
Furnish and install 35.5' of MBM Crossing System™. ………………………………………………. $81,145.00
3. 11th Street, Frostproof:
Furnish and install 31' of MBM Crossing System™. ………………………………………………….. $78,820.00
When funded please add 10% as Railroad administration and oversight costs.
:1
:0
A M
R E
V I S I O
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2021-22 SHEETINDEX
11/01/17 830-T01 1 2
RAILROAD (GRADE) CROSSING
GENERAL NOTES
CROSSING SURFACES
STOP ZONE FOR RUBBER CROSSING
Type Definition
C
R
RA
Concrete
Rubber
Rubber/Asphalt
TA Timber/Asphalt
(mph)
Design Speed
(Distance From Stop)
Zone Length
250'
50 - 55
60 - 65
350'
500'
600'
45 Or Less considerations dictate otherwise.
chart may be used unless engineering or safety
Single track Type R Crossings within the zones on the 2.
future vehicular stop. Zone lengths are charted above.
crossings within zones for an existing or scheduled
Type R Crossings are NOT to be used for multiple track 1.
Notes: the edge of the travel way.
The Department will participate in crossing work, that requires adjustments to rail outside of the crossing, no more than 50 feet from 7.
Install pavement in accordance with the Specifications. 6.
appropriate material to allow unobstructed travel through the crossing in accordance with ADA requirements.
Sidewalks shall be constructed through the crossing between approach sidewalks of the crossing. Sidewalks shall be constructed with 5.
the crossing surface type shall be made a part of the installation agreement.
and/or the District Rail Office for concurrence along with the List of Railroad Crossing Products. The approved engineering drawings of
The Railroad Company shall submit engineering drawings for the proposed crossing surface type to the Construction Project Engineer 4.
the District Offices as the list is updated.
The Central Rail Office will maintain a list of currently used Railroad Crossing Products and will periodically distribute the current list to 3.
surface is constructed.
protect the crossing from low clearance vehicles and vehicular impacts until the construction project is completed and the final highway the approaches of the crossing to reduce vehicular impacts to the crossing. The transition pavement will be maintained as appropriate to
When a railroad grade crossing is located within the limits of a highway construction project, a transition pavement will be maintained at 2.
negotiated otherwise.
All pavement material, including that through the crossing, will be furnished and installed by the Department or its Contractor, unless
The Railroad Company will furnish and install all track bed (ballast), crossties, rails, crossing surface panels and accessory components. 1.
:1
:0
A M
R E
V I S I O
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2021-22 SHEETINDEX
11/01/19 830-T01 2 2
RAILROAD (GRADE) CROSSING
¡ Pavement
Beveled Edge (1:4 Slope)
Shoulder Pavement
Edge Of Travel Way
Shoulder Line*
Pavement' Above
See 'Crossing Shoulder
Varies (2' Min.)
Or Signal And Gate
Railroad Signal, Gate
R
A I L R
O A
D
With RR Company)
Filter Fabric (Optional
Exist. Rdwy. Pavt.
Friction Course
Ballast Ballast
Crosstie
By Crossing Type)
Material (When Required
Cap Or Expansion
Friction Course
Exist. Rdwy. Pavt.
With RR Company)
Filter Fabric (Optional
Level
Crosstie
Grade
¡ Rail¡ Rail
¡ Track
¡ Railroad
¡ Pavement
2' Setback
Utility Strip
3' Curb Transition 3' Curb Transition
Concrete Curb And Gutter
Utility Strip
Beveled Edge (1:4 Slope)
Type SP Asphalt (500 Lb/SY)
Overbuild Overbuild
Type SP Asphalt (500 Lb/SY)
Grade Level
Asphalt
Concrete Curb And Gutter
Drop Curb Drop Curb
Extend Beyond Lip Of Gutter
Crossing Materials Do Not
Shoulder Pavement When
Match Adjacent Surface
Asphalt or Concrete to
Sidewalk or Trail
HALF PLAN
CURBED ROADWAYS
ROADWAYS WITH FLUSH SHOULDERS
HALF PLAN
SECTION VIEW
TYPICAL CROSSING MATERIAL REPLACEMENT AT RR CROSSINGS VERTICAL ROADWAY ALIGNMENT THROUGH A RAILROAD CROSSING
4' For Median Shoulders.c.
(Regardless Of Approach Shoulder Pavement Width).
To 8' Maximum Width For Outside Shoulders 8' Or Wider b.
To Shoulder Line For Outside Shoulders Less Than 8' Wide.a.
(Except Area Occupied By Crossing Surfacing Material):
Crossing Shoulder Pavement
Flexible Pavement
Gate Or Signal And Gate
With Or Without Signal, 50' Min.
Crossing Materials
(W idth Varies)
(S e e
G e n e r a l
N o te
D e p a r tm e n t
P a r ti c ip a ti o n
M a x
12' Min.
50' Min.
(Full Depth Asphalt/Rubber Shown)
RR Crossing Varies
(1' To 4.5')
Varies
(1' To 4.5')
Varies is not level, will necessitate a site specific analysis for rail clearances.
grade to a level plane at the elevation of the rails. Rails that are superelevated, or a roadway approach section that superelevation makes a different level appropriate. Vertical curves should be used to traverse from the highway be more than 3 inches higher or lower than the top of the nearest rail at a point 30 feet from the rail unless track plane as the top of the rails for a distance of 2 feet outside the rails. The surface of the highway should also not
To prevent low-clearance vehicles from becoming caught on the tracks, the crossing surface should be at the same
30' 30'
2'2'
Varies (8' Min.)Varies (8' Min.)
Crossing Materials
(Width Varies)
(S e
G n e r a l
N o t e
D e p a r t m e n t
P a r t ic ip a t io n
M a x
V a rie s
V ar ie s crossing shoulder pavement.
be widened to accommodate type, the shoulder width is to is substandard for the facility
* Where the existing shoulder
S e e
I n d x
V a r ie s
Index 509-070 gates or signals and gates see
For location of railroad signals, Note:
| 2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as: |
| Signing, Pavement Markings and Lighting |
| 830-T01-Railroad (Grade) Crossing |
| 830-T01-1of2 |
| 830-T01-2of2 |