This document is a Railroad Reimbursement Master Agreement dated September 15, 1998, between the State of Florida Department of Transportation and CSX Transportation, Inc., a Virginia-based corporation headquartered in Jacksonville. The agreement establishes a master framework for collaborative transportation infrastructure projects involving railroad crossings, right-of-way modifications, and related engineering work across various locations in Florida.
The specific contract detailed in this document covers Preliminary Engineering services for a project on SR 60/Brandon Boulevard in Hillsborough County, with a Change Order No. 1 issued on December 9, 2020 authorizing $20,000 for Preliminary Engineering, CEI (Construction Engineering and Inspection), and Flagging Services. The work involves paving activities within the CSX right-of-way and adjacent minor repairs. The project is funded through a Rollup Rail Safety Hazard Elimination program, is associated with state funds, and is subject to Buy America requirements. The agreement establishes that CSX will provide necessary engineering estimates, plans, and services, with the Florida Department of Transportation responsible for compensating the company for approved costs according to specified reimbursement policies.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
RAILROAD CHANGE ORDER NO. 1
725-090-04B
RAIL
OGC – 10/20
Financial Project Number Road Name or Number County Name Parcel & R/W
Number
FAP
Number
440251-1-57-01 SR 60/Brandon Blvd HILLSBOROUGH 10110-2111 N/A
A. 1. The CSX Transportation Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary Engineering, CEI & Flagging Services. This Change Order covers paving activities within
CSX ROW and all other minor repairs within and adjacent to the CSX ROW
2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original
Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated
09/15/1998 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. ATTACHED
b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
1 Preliminary Engineering 1 20,000.00 CEI & Flagging Services
Sub-Totals ………………………………………………………………… $ $20,000.00
Net Cost of Construction Changes, this order ………………………... $ $20,000.00
Cost of Construction Changes, previously ordered ………………….. $ $
Net Total Cost of Construction Changes, to date…………………………………………….. $20,000.00
Contract Amount ………………………………………………………………………………… $
Estimated Cost of Work Authorized, to date………………………………………………….. $20,000.00
Examined as to provisions and participating items of cost:
Recommended:
Approved:
Approved:
Date
District Rail Administrator Steve Love
Director of Transportation Development Richard Moss
Division Administrator N/A
Federal Highway Administration
DocuSign Envelope ID: F5E088B6-1292-4B52-851E-B05444D279BD
12/9/2020 | 3:45 PM EST 12/9/2020 | 3:52 PM EST
KNPBAGD
Text Box Exempt from FHWA Review
KNPBAGD
Text Box x
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
EXHIBIT B
The Company shall:
1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and
2. ensure that prefabricated items that contain steel must also comply with Buy America; and
3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.
EXHIBIT C
The Company understands:
1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and
2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.
To: Kenneth.Madden@dot.state.fl.us
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASJ22
8/3/2020
CONTRACT INFORMATION
Contract: ASJ22
Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)
Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT
Vendor Name: CSX TRANSPORTATION, INC.
Vendor ID: F546000720022
Beginning Date of This Agreement: 07/30/2020
Ending Date of This Agreement: 12/31/2050
Contract Total/Budgetary Ceiling:
Description: CO1 PE and flagging
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 8/3/2020
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55074010706
Expansion Option: A8
Object Code: 563000
Amount: $20,000.00
Financial Project: 44025115701
Work Activity (FCT): 127
CFDA:
Fiscal Year: 2021
Budget Entity: 55150200
Category/Category Year: 088797/21
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1PE
Enc Line (6s)/Status: 0001/04
Total Amount: $20,000.00
Page1 of 1 mailto:Kenneth.Madden@dot.state.fl.us
_____ Other
*By signing this form you are authorizing CSXT to incur costs and bill against this project. Should the project be canceled, CSXT will bill the Project Sponsor for the incurred costs. In the event the Project Sponsor is unresponsive for 90 days or more, the project will be closed;
and the Project Sponsor will be final billed for all project costs incurred.
Project Location:
Sponsor Project Ref.
Number (If applicable)
Signature of Applicant Date:
Project Description:
| Signature | of | Applicant* | ||||||||
| Please | sign, | and | e‐mail | this | form | to | the | authorized | CSX | representative. |
| Only | complete | this | section | if | this |
| project | is | associated | with | ||
| Federal | and/or | State | funds. |
CSX is subject to a state single audit as a recipient or subrecipient of funds (The only states that should apply here are FL or NC. FL must provide completed form DFS-A2-NS.)
If you selected Other, please describe below.
Name and Title of Applicant
Please describe the funding source for this project (i.e. INFRA, Section 130, State, County, Private, etc.).
Contact Name:
Phone:
E-mail:
State Suspended and Debarred (Note - All federally funded projects are already monitored against the federal sus/deb listings)
Davis-Bacon (Please only check this box if this is a construction project that may be performed by an outside party)
Project Sponsor Bill To Information
Agency - Sponsor:
Billing Address:
Project Requirements:
CSX TRANSPORTATION – NEW PROJECT INITIATION FORM
Please provide the following information so that CSXT is able to accurately and appropriately process the project setup and billing.
Is this project associated with Federal funds?
Is this project associated with State funds?
Additional procurement restrictions (Please describe below)
Buy America
Form Revision 9/6/19
NO
YES
Rollup Rail Safety Hazard Elimination - RHH
Florida Department of Transportation District 7
11201 N. NcKinley Drive MS 7-500, Tampa, Fl 32612-6456
Steve C. Love, District Rail Administrator
813-975-6402
Steve.Love@dot.state.fl.us
SR 60/Brandon Blvd from Valrico Rd to Turkey Creek Rd
Preliminary Engineering Review, CEI & Flagging Services. This Project Covers paving within CSX ROW and all other minor repairs within and adjacent to CSX ROW.
440251-1-57-01
Steve C. Love, District Rail Administrator
12/9/2020 | 3:45 PM EST
VALRICO
Highway Speed:
Crossing Angle:
Street Types:
Thru Lanes:
Aux Lanes:
Hazmat Route?
Emergency Services Route?
Emergency Notification Signs:
Crossbuck(4x4 post):
Stop Sign:
Yield Sign:
Low Ground Clearance Signs:
Exempt Signs:
Trespass Signs:
W10-1
W10-2
W10-3
W10-4
W10-11
W10-12
R3-1a
R3-2a
R8-8
R8-9
R8-10
R8-10a
R10-6
R10-6a
R11-2
R15-2P
R15-6
R15-6a
R15-7
R15-7a
R15-8
Pvt Crossing
Look Out
R8-8 w/Beacon
W3-1
W3-3
W8-1
W10-8
W10-9
W10-9P
W10-11a
W10-11b
W10-13P
W10-14P
W10-14aP
W10-15P
Slow
W10-1w/Beacon
LED Signs
Surface Installment Date:
Surface Type:
Surface Condition:
Approach:
Vehicle Reaction:
Driver Reaction:
Rail/Pad Movement:
Maintenance Responsibility:
Roadway Paved:
Tracks run down street?
Sidewalks on Crossing Approach?
Sidewalks Thru Crossing?
Crossing illuminated?
Commerical Power?
Alternative Power?
Number of Bells:
Post Mounted Flashing Lights:
Roadway Gate Count:
Pedestrian Gate Count:
Gates:
Cantilevered Flashing Over Traffic:
Cantilevered Flashing Not Over Traffic:
Intersecting Roadway?
Signalized?
Interconnection:
Preemption:
Traffic Pre-Signals?
8" Count:
12" Count:
LED Count:
Train Speed Range:
Max Time Table Speed:
Day Thru/Switch:
Night Thru/Switch:
Train Service:
Passenger Count/Day:
Train Count Date:
Main Tracks:
Train Signals?
Train Signal Proximity:
Train Detection:
Rank 2018:
Rank 2017:
Rank 2016:
SR No.:
CR No.:
US No.:
Latitude:
Longitude:
RR Company:
Division Name:
Subdivision Name:
Branch Name:
RR Milepost:
Recommended Warning Device:
Incident History: 04/2018
IN CITY
PUBLIC AT GRADE Residental
30-59 DEG
NO
YES
YES
NO
LOS B = Vibrating
LOS A = No reaction
LOS A = Smooth
LOS A = Smooth
CONCRETE
GOOD
SR-60
SZ 802
1.48
VALRICO
JACKSONVILLE
CSX
35-40
0/3
0/2
NO
NO
None
Not Interconnected
NO
NO
YES
YES
YES
NO
STATE
YES
YES
YES
NO
05/01/2012
District: 7RR Street: Roadway: SR-60Crossing No: 624551H County: Hillsborough
Crossbuck Sign: 4
Install - Upgrade: -- 01/28/1992 Pvmt Mrk: STOPLINES AND XING SYMBOLS
33000 (2017)AADT:
Percent Trucks:
School Buses:
7 (2012)
0 (2019)
27.937800
-82.230000
CFL & G
Other Tracks:
2 Quad, Full Entrance, Median Gates
City: OPEN--TRACK ACTIVE
Event Recorder?
Traffic Signals Controlling?
Backlights, Incandescent
Incandescent
Team Members: Brian Hunter
Roberto Gonzalez
Dale Hanson
Kevin Dunn
James Andrews
Charles Rollins
Henry Parrish
Chris Wilson
Date: 05/23/2013
Team Recommendations: Keydown
Field Review Comments:
Freight
HWY
NODoes traffic queue across the tracks?
| 440251-1 - Change Order #1 Complete 12-9-2020 |
| 440251-1 - Change Order #1 12-8-2020 (PE MA).doc |
| 2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as: |
| 440251-1 ASJ22 Funds Approval |
| 440251-1 - CSX New Project Form |
| 440251 - Post Diagnostic Report |
| 440251-1 - Project Location Map |
| 440251-1 - Change Order #1 Complete 12-9-2020 |
| Master Agreement for CSX_PE 09 15 1998 |
File details come from the government source that posted it. Updated .