Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
605 Suwannee Street
Tallahassee, FL 32399-0450
KEVIN J. THIBAULT, P.E.
SECRETARY
April 16, 2020
Mr. Ben Martinez South Central Florida Express, Inc.
900 South W.C. Owen Clewiston, Florida 33440
NOTICE TO PROCEED
RE: FM No.: 447029-1-57-03 RR OP No.: Various
RR Crossing No.: Various RRMP No.: Various Description: Various County: Glades, Hendry, Highlands
Ben, We are enclosing one (1) fully approved Change Order No. 1, dated April 16, 2020 involving your company in the amount of $15,000.00. The work to be performed will consist of the following:
Preliminary Engineering and flagging to install the Dynamic Envelope at (6) six crossings in Glades, Hendry, Highlands County. Please see the attached list for crossing locations.
Should you have any questions or need additional information, please let us know. I can be reached at 863/519-2437 or barbara.daugherty@dot.state.fl.us.
Sincerely, Barbara Daugherty GEC Rail – Project Manager
BDW/bdw enc.
c.c. Central Office Rail MS-25 w/attachment Project File
Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov mailto:barbara.daugherty@dot.state.fl.us
DocuSign Envelope ID: 59CEEC12-9624-4FC1-B0F6-BB4E99666638
725-090-04B
RAIL
OGC – 03/15
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION Page 1 of 2
RAILROAD CHANGE ORDER NO. 1
Financial Project Number Road Name or Number County Name Parcel & R/W Number FAP Number
447029-1-57-03 Districtwide Districtwide Districtwide N/A
A. 1. The South Central Florida Express Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:
Preliminary Engineering and Flagging services needed for the installation of the Dynamic Envelope at (6) six crossings in Glades, Hendry, Highlands County, Florida. Please see the attached list of crossings.
2. Exhibit A is attached to the Railroad Change Order and made a part of the Original Railroad Agreement.
3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated 09-15-1998 and no supplemental Agreement is required.
Master Type: Crossing Surface Signals Preliminary Engineering
B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:
a. ATTACHED
b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:
a. NONREIMBURSABLE – Section .011(2)
b. X REIMBURSABLE – Section .011(2)
(1) X Force Account Method
(2) Lump Sum Method
(3) Third Party Contract Method
C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER
ITEM
NO.
Sub-Totals …………………………………………………………………
Net Cost of Construction Changes, this order ………………………...
Cost of Construction Changes, previously ordered …………………..
Net Total Cost of Construction Changes, to date……………………………………………..
Contract Amount ………………………………………………………………………………… Estimated Cost of Work Authorized, to date…………………………………………………..
Examined as to provisions and participating items of cost:
Recommended: 4/16/2020 | 1:25 PM EDT
Date Approved: /16/2020 | 1:25 PM EDT Approved:
Date Date
District Rail Administrator Modal Development Administrator Division Administrator F e deral Highway Administration
N/A
ITEM UNIT UNIT
PRICE
WORK ELIMINATED (-)
QTY AMOUNT
ADDITIONAL WORK (+)
QTY AMOUNT
PE & Flagging 15,000.00
$ $15,000.00 $ $15,000.00 $ $0.00
$15,000.00 $0.00
$15,000.00
DocuSign Envelope ID: 59CEEC12-9624-4FC1-B0F6-BB4E99666638
725-090-04B
RAIL OFFICE
OGC – 03/15
EXHIBIT A
The Company shall:
1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and
2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
To: Barbara.Daugherty@dot.state.fl.us
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASH48
4/15/2020
CONTRACT INFORMATION
Contract: ASH48
Contract Type:
Method of Procurement:
Vendor Name:
Vendor ID:
AD - RR CROSSING-MAINT (RR-XING/MT)
R - RAILROAD/UTILITIES AGREEMENT
SOUTH CENTRAL FLORIDA EXPRESS
F650518598001
Beginning Date of This Agreement: 04/09/2020
Ending Date of This Agreement: 04/09/2025
Contract Total/Budgetary Ceiling:
Description: 447029-1-57-03 - SCFE - Dynamic Envelope - Districtwide - Multiple Counties
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 4/15/2020
Action: Task Work Order
Reviewed or Approved: APPROVED
Organization Code: 55310000933
Expansion Option: AW
Object Code: 563000
Amount: $15,000.00
Financial Project: 44702915703
Work Activity (FCT):
CFDA:
Fiscal Year: 2020
Budget Entity: 55100500
Category/Category Year: 088808/20
Amendment ID: W001
Sequence: 00
User Assigned ID: CO#1
Enc Line (6s)/Status: 0001/04
Total Amount: $15,000.00
Page1 of 1
CrossingId Local Name
RRMP
Number RailOpCom County City 627657N SR-29 AVD 919.08 SCXF Glades Moore Haven 627659C US-27 / SR-25 AVD 924.06 SCXF Glades Moore Haven 627662K SR-78 AVD 931.82 SCXF Glades Moore Haven 627695X US-27 / SR-80 / SR-25 AVD 945.88 SCXF Hendry Clewiston 627623U US 98/ SR 700 AVD 881.82 SCXF Highlands Sebring 627642Y SR 70 W AVC 898.75 SCXF Highlands Lake Placid
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
CONTRACT PLANS
3:29:48 PM T:\FDOT-GEC\District 1\STRIDE RR\CADD\KEYSP01.dgnUSER: MURP7744 4/9/2020
NO.
SHEET
YEAR
FISCAL
S-1 20 TXXXX
EXPRESSWAY
T U
R N P
IK
E
PENSACOLA FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
SARASOTA -
BRADENTON
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
CITY
LAKE
F
LO
R
ID
A 'S
BEACH LINE
ARLENE BARNES, P.L.S.
FDOT PROJECT MANAGER:
CERTIFICATE OF AUTHORIZATION NO.: 24
VENDOR NO.: F-590-896-138-001
CONTRACT NO.: C9L49
TAMPA, FLORIDA 33607
4030 WEST BOY SCOUT BLVD. STE. 700
ATKINS NORTH AMERICA, INC
WILLIAM ACEY ROBERTS, P.E. #82914
SHEET DESCRIPTIONSHEET NO.
INDEX OF SIGNING AND PAVEMENT MARKING PLANS
SIGNING AND PAVEMENT MARKING PLANS
FINANCIAL PROJECT ID 447029-1-52-02, 447029-1-52-03
T H
E
O F
F I
C I
A L
R
C O
D
O
T
I
S
E E
T
T
E C
T R
O N
C
G I
T A
L
Y
G N
A N
A L
U N
D
U
L E
G
A
C
POLK COUNTY (13030) (16090) (16110) (160119)
SR 555, SR 17, SR 60, SR 540
ENGINEER OF RECORD:
SIGNING & PAVEMENT MARKING
VARIOUS LOCATIONS IN DISTRICT 1
DYNAMIC ENVELOPE AT RAILROAD GRADE CROSSING
GLADES COUNTY (50100) (50200) (50900)
SR 25, SR 29, SR 78
HENDRY COUNTY (70300)
SR 80, SR 25
HIGHLANDS COUNTY (90600) (91100)
SR 70, SR 700
PROJECT LOCATION
CONTRACT NO.
MAINTENANCE
FDOT STANDARD INDEX #509-070
TRAFFIC CONTROL DEVICES
RAILROAD GRADE CROSSING1 TO 4
SQ-1 SUMMARY OF QUANTITIES
AND PHASING NOTES
S-14 TO S-15 TEMPORARY TRAFFIC CONTROL GENERAL
SIGINING AND PAVEMENT MARKING PLANS-4 TO S-13
GENERAL NOTES S-3
PROJECT LAYOUTS-2
KEY SHEETS-1
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
STATE OF
No 82914
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
S T
R E
BOR YECA M
AI
L
LI
W
T:\FDOT-GEC\District 1\STRIDE RR\CADD\GNNTSP01.DGNUSER: MURP7744 4/9/2020 3:30:43 PM Default
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEETSTATE OF FLORIDA
4030 WEST BOY SCOUT BLVD. STE. 700
TAMPA, FLORIDA 33607
WILLIAM ACEY ROBERTS
P.E. LICENSE NUMBER 82914
ATKINS NORTH AMERICA, INC.
447029-1-52-02
GENERAL NOTES
VARIES
13'
SIGNING AND PAVEMENT MARKING GENERAL NOTES
TYPICAL
TRAFFIC SIDE
RAIL SIDE
RAILROAD DYNAMIC ENVELOPE PAVEMENT MARKING DETAIL
VARIES
447029-1-52-03
BACK OF SHOULDER
FACE OF CURB OR
6" WHITE PREFORM THERMOPLASTIC
12" WHITE PREFORM THERMOPLASTIC
2. PRE-CONSTRUCTION MEETING - RAILROAD INSURANCE IS REQUIRED AT THE PRE-CONSTRUCTION MEETING. SUBMIT RAILROAD INSURANCE TO BARBARA DAUGHERTY AT THE FDOT RAIL OFFICE AT BARBARA.DAUGHERTY@DOT.STATE.FL.US. SHE WILL SUBMIT TO FLORIDA MIDLAND RAILROAD FOR
FMRR APPROVAL.
DEPARTMENTS ENGINEER AND DISTRICT RAIL OFFICE AT (863) 519-2437 TO REQUEST NEEDED FLAGMAN OR
ACCESS TO FMRR RIGHT-OF-WAY.
4. WORK WILL NOT BE PERFORMED WITHIN RAILROAD RIGHT-OF-WAY WITHOUT A RAILROAD FLAGMAN BEING PRESENT. TO OBTAIN A FLAGMAN, THE CONTRACTOR SHALL PROVIDE AN ESTIMATE OF START DATE, WORK DAYS, HOURS AND DURATION FOR WHICH A FMRR FLAGGER WILL BE NEEDED ON ACTIVITIES WITHIN THE FMRR RIGHT-OF-WAY. PROJECTS WITH RAILROAD INVOLVEMENT REQUIRE ADVANCE NOTIFICATION TO OBTAIN
5. CONTRACTOR SHALL NOT STORE MATERIAL OR EQUIPMENT ON RAILROAD’S PROPERTY.
THE RAILROAD. INVOICES FOR SUCH PENALTIES RECEIVED BY THE DEPARTMENT WILL BE FORWARDED TO THE CONTRACTOR FOR PAYMENT. IF THE CONTRACTOR FAILS TO PAY SUCH PENALTIES, THE DEPARTMENT
MAY DEDUCT SAID AMOUNT FROM PAYMENTS MADE TO THE CONTRACTOR.
CONTRACTOR NOTES:
ANY CONFLICT WITH PAVEMENT MARKINGS (I.E. STOP BARS, SOLID YELLOW AND WHITE LINES) AND THE
DYNAMIC ENVELOPE WILL BE ADDRESSED.
2. PRE-CONSTRUCTION MEETING - RAILROAD INSURANCE IS REQUIRED AT THE PRE-CONSTRUCTION MEETING.
SUBMIT RAILROAD INSURANCE TO BARBARA DAUGHERTY AT THE FDOT RAIL OFFICE AT
BARBARA.DAUGHERTY@DOT.STATE.FL.US. SHE WILL SUBMIT TO SOUTH CENTRAL FLORIDA EXPRESS FOR INSURANCE APPROVAL. NO WORK WILL BE ALLOWED WITHIN THE SCFE RAILROAD RIGHT OF WAY WITHOUT
SCFE APPROVAL.
ENGINEER AND DISTRICT RAIL OFFICE AT (863) 519-2437 TO REQUEST NEEDED FLAGMAN OR ACCESS TO
FMRR RIGHT-OF-WAY.
4. WORK WILL NOT BE PERFORMED WITHIN RAILROAD RIGHT-OF-WAY WITHOUT A RAILROAD FLAGMAN BEING PRESENT. TO OBTAIN A FLAGMAN, THE CONTRACTOR SHALL PROVIDE AN ESTIMATE OF START DATE, WORK DAYS, HOURS AND DURATION FOR WHICH A SCFE FLAGGER WILL BE NEEDED ON ACTIVITIES WITHIN THE SCFE RIGHT-OF-WAY. PROJECTS WITH RAILROAD INVOLVEMENT REQUIRE ADVANCE NOTIFICATION TO OBTAIN
5. CONTRACTOR SHALL NOT STORE MATERIAL OR EQUIPMENT ON RAILROAD’S PROPERTY.
THE RAILROAD. INVOICES FOR SUCH PENALTIES RECEIVED BY THE DEPARTMENT WILL BE FORWARDED TO THE CONTRACTOR FOR PAYMENT. IF THE CONTRACTOR FAILS TO PAY SUCH PENALTIES, THE DEPARTMENT MAY
DEDUCT SAID AMOUNT FROM PAYMENTS MADE TO THE CONTRACTOR.
CONTRACTOR NOTES:
1. THE SIGN LOCATIONS ARE APPROXIMATE AND MAY REQUIRE FIELD ADJUSTMENT AS DIRECTED BY THE ENGINEER.
INSURANCE APPROVAL. NO WORK WILL BE ALLOWED WITHIN THE FMRR RAILROAD RIGHT OF WAY WITHOUT
6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY "DELAY OF TRAIN" PENALTIES IMPOSED BY
6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY "DELAY OF TRAIN" PENALTIES IMPOSED BY
VARIES
LEGEND:
RAILROAD SIGNAL WITH GATE
2. NO WORK TO BE DONE WITHIN 4 FEET OF THE TRACK.
3. CONSTRUCTION FLAGGING REQUIREMENTS - THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE
3. CONSTRUCTION FLAGGING REQUIREMENTS - THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE DEPARTMENTS
A FLAGMAN. THE CONTRACTOR SHOULD PLAN TO ONLY HAVE ONE CONSTRUCTION FLAGGER PER PROJECT. .
A FLAGMAN. THE CONTRACTOR SHOULD PLAN TO ONLY HAVE ONE RAILROAD FLAGGER PER PROJECT.
THIS PROJECT IS FOR THE INSTALLATION OF THE DYNAMIC ENVELOPE AND SIGNS (R8-8) AT APPROPRIATE PLACES.
TO REMOVE ALL DEBRIS FROM RAILROAD RIGHT OF WAY
DURING AND AFTER COMPLETION OF CONSTRUCTION WITHIN RAILROAD RIGHT OF WAY, CONTRACTOR IS REQUIRED
RAILROAD CROSSING NOTES (FMRR FPID # 447029-1-52-02)
RAILROAD CROSSING NOTES (SCFE FPID # 447029-1-52-03)
THIS PROJECT IS FOR THE INSTALLATION OF THE DYNAMIC ENVELOPE AND SIGNS (R8-8) AT APPROPRIATE PLACES.
1. SEE STANDARD PLANS INDEX 509-070 FOR TYPICAL RAILROAD DYNAMIC ENVELOPE PAVEMENTS DETAILS.
1. SEE STANDARD PLANS INDEX 509-070 FOR TYPICAL RAILROAD DYNAMIC ENVELOPE PAVEMENTS DETAILS.
S-3
TO REMOVE ALL DEBRIS FROM RAILROAD RIGHT OF WAY
DURING AND AFTER COMPLETION OF CONSTRUCTION WITHIN RAILROAD RIGHT OF WAY, CONTRACTOR IS REQUIRED
ANY CONFLICT WITH PAVEMENT MARKINGS (I.E. YELLOW AND WHITE LINES) AND THE
DYNAMIC ENVELOPE WILL BE REMOVED.
T:\FDOT-GEC\District 1\STRIDE RR\CADD\TCGNSP01.DGNUSER: MURP7744 4/9/2020 3:43:23 PM Default
REVISIONS
DATE DESCRIPTION
NO.
WILLIAM ACEY ROBERTS
P.E. LICENSE NUMBER 82914
ATKINS NORTH AMERICA, INC.
447029-1-52-02 GENERAL AND PHASING NOTES
VARIES VARIES
447029-1-52-03
TRAFFIC CONTROL
TEMPORARY TRAFFIC CONTROL PLAN GENERAL NOTES
MESSAGES SHOULD READ
MESSAGE 1
AHEAD
WORK
ROAD
S-14
SIDE ROADS TO CONTROL TRAFFIC. THE INDEX 102 SERIES OF THE FDOT STANDARD. PLANS SHALL BE UTILIZED.
8. FLAGGERS SHALL BE USED WHEN CONSTRUCTION ACTIVITY OCCURS AT DRIVEWAYS, SIDE STREETS OR TWO LANE
OTHERWISE SPECIFIED
7. ACCESS TO ALL PROPERTIES, DRIVEWAYS, SIDE STREETS SHALL BE MAINTAINED AT ALL TIMES UNLESS
48 HOURS IN ADVANCE OF PERFORMING ANY LANE CLOSURES.
6. ALL LAW ENFORCEMENT, EMERGENCY/RESCUE AGENCIES LOCATED IN THE PROJECT VICINITY SHALL BE NOTIFIED
CONSTRUCTION FLAGGER(S) SHALL BE PROVIDED TO CONTROL TRAFFIC.
5. WHEN WORK, EQUIPMENT, OR MATERIAL MOVEMENT REQUIRES INTERMITTENT TRAFFIC STOPPAGE, QUALIFIED
THE ENGINEER.
CONGESTION (5 MINUTE DELAY) UNTIL TRAFFIC HAS RETURNED TO AN ACCEPTABLE FLOW AS DETERMINED BY
4. AT THE DISCRETION OF THE ENGINEER, OPEN ANY TEMPORARY LANE CLOSURE CAUSING EXTENDED TRAFFIC
3. NO LANE CLOSURES ARE ALLOWED BETWEEN THE HOURS OF 6:00 AM TO 8:00 AM AND 4:00 PM TO 6:00 PM.
2. NO ROAD CLOSURES SHALL BE ALLOWED AT ANY TIME
1. LANE CLOSURES MAY ONLY BE USED DURING ACTIVE WORK PERIODS
T:\FDOT-GEC\District 1\STRIDE RR\CADD\TCGNSP01.DGNUSER: MURP7744 4/9/2020 3:43:23 PM Default
REVISIONS
DATE DESCRIPTION
NO.
WILLIAM ACEY ROBERTS
P.E. LICENSE NUMBER 82914
ATKINS NORTH AMERICA, INC.
PHASE 1 NOTES
PHASE 2 NOTES
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
500' 500' 500'
500' 500' 500'
TAPER
540'
BUFFER
360'
BUFFER
250'
T A
P E
R
TAPER
540'
BUFFER
360'
RAILROAD TRACK
Flagger
AHEAD
ROAD
ONE LANE
AHEAD
ROAD
ONE LANE
AHEAD
ROAD
ONE LANE
AHEAD
ROAD
ONE LANE
Work Zone Sign
Channelizing Device (See Index 600)
Work Area
Lane Identification and Direction of Traffic
LEGEND
447029-1-52-02
447029-1-52-03
GENERAL AND PHASING NOTES
TRAFFIC CONTROL
VARIES VARIES
MAINTENANCE OF TRAFFIC TYPICAL APPLICATION DIAGRAM
S-15
PLACE DYNAMIC ENVELOPE AND INSTALL APPROPRIATE SIGN(S).4.
TEMPORARY TRAFFIC CONTROL PLAN GENERAL NOTES.
CLOSE THE PHASE 1 DIRECTION IN ACCORDANCE WITH STANDARD PLANS INDEX 102-000 AND 102-025 AND THE 3.
102-000.
PLACE ADVANCE WARNING TRAFFIC CONTROL DEVICE IN ACCORDANCE WITH STANDARD PLANS INDEX 102-025 AND 2.
CONTROL PLAN GENERAL NOTES.
PLACE PORTABLE CHANGEABLE (VARIABLE) MESSAGE SIGNS (PCMS) IN ACCORDANCE WITH THE TEMPORARY TRAFFIC1.
PLACE DYNAMIC ENVELOPE AND INSTALL APPROPRIATE SIGN(S)3.
CLOSE THE PHASE 2 DIRECTION IN ACCORDANCE WITH STANDARD PLANS INDEX 102-000 AND 102-025.2.
102-025.
MAINTAIN ADVANCE WARNING TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH STANDARD PLANS INDEX 102-000 AND1.
THE INTENT OF THIS PHASE IS TO PLACE RAILROAD DYNAMIC ENVELOPE AND SIGNS IN ONLY ONE DIRECTION OF TRAVEL AT THE RAIL
FROM PHASE 1, AT THE RAIL
THE INTENT OF THIS PHASE IS TO PLACE RAILROAD DYNAMIC ENVELOPE AND SIGNS IN THE OPPOSITE DIRECTION OF TRAVEL
T:\FDOT-GEC\District 1\STRIDE RR\CADD\SUMQSP01.dgnUSER: MURP7744 4/9/2020 4:30:29 PM Default
REVISIONS
DATE DESCRIPTION
NO.
WILLIAM ACEY ROBERTS
P.E. LICENSE NUMBER 82914
ATKINS NORTH AMERICA, INC.
447029-1-52-02
VARIES
SUMMARY OF QUANTITIES
SQ-1
447029-1-52-03
VARIES
TABULATION OF QUANTITIES
(447029-1-52-02)
NO.
ITEM
PAY
DESCRIPTION UNIT
S-4 S-5 S-6 S-7
TOTAL
GRAND
(623053V)
SR-555
US-17 /
(625426Y)
SR-60
(625478R)
AVE
CRYSTAL
SR-17 /
(853371R)
FOOT RD
OLD 9
SR-540 /
PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL
700-1-11 SINGLE- POST SIGN, F&I GROUND MOUNT, UP TO 12 SF AS 6 4 2 6 18
711-17 THERMOPLASTIC, REMOVE SF
* THERMOPLASTIC, WHITE, SOLID 6" SF 193 99 49 341
* THERMOPLASTIC, YELLOW, SOLID, 6" SF 48 24 72
* THERMOPLASTIC, WHITE, SKIP, 6" (10/30) SF 32 24 24 80
711-14-191 THERMOPLASTIC, PREFORMED 6" WHITE, RAILROAD LF 470 364 246 154 1234
711-14-193 THERMOPLASTIC, PREFORMED 12" WHITE, RAILROAD LF 1061 858 113 339 2371
TABULATION OF QUANTITIES
(447029-1-52-03)
NO.
ITEM
PAY
DESCRIPTION UNIT
S-8 S-9 S-10 S-11 S-12 S-13
TOTAL
GRAND
(627657N)
SR-29
(627659C)
SR-25
US-27 /
(627662K)
SR-78
(627695X)
SR-25
SR-80 /
US-27 /
(627623U)
SR-700
US-98 /
(627642Y)
SR-70 W
PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL
700-1-11 SINGLE- POST SIGN, F&I GROUND MOUNT, UP TO 12 SF AS 4 4 2 4 2 2 18
711-17 THERMOPLASTIC, REMOVE, REMOVE SF
* THERMOPLASTIC, WHITE, SOLID 6" SF 28 27 13 18 17 12 87
* THERMOPLASTIC, YELLOW, SOLID, 6" SF 29 27 13 12 17 12 81
* THERMOPLASTIC, WHITE, SKIP, 6" (10/30) SF 27 12 39
711-14-191 THERMOPLASTIC, PREFORMED 6" WHITE, RAILROAD LF 105 129 76 189 112 80 586
711-14-193 THERMOPLASTIC, PREFORMED 12" WHITE, RAILROAD LF 235 286 224 647 457 175 1789
2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as: