This document is a Railroad Change Order No. 2 issued by the State of Florida Department of Transportation (FDOT) involving CSX Transportation Inc. for a railroad crossing replacement project on State Road 674/College Avenue in Hillsborough County. The change order references a master agreement dated 8/7/1972 and is related to Financial Project Number 436734-2-57-01.

The change order authorizes additional funds of $23,000 for replacing a timber and asphalt crossing with concrete panels at Crossing 624767N, AZA 897.31. The work is reimbursable using the Force Account Method under Administrative Rule Chapter 14-57. The total estimated cost of construction changes is $383,037.00, with the project involving railroad crossing surface modifications. The change order includes three exhibits outlining requirements for E-Verify usage, Buy America compliance, and Title VI nondiscrimination assurances. The project's beginning date is 09/13/2019, with an ending date of 12/31/2050, and is classified under the contract type "RR CROSSING-PE/INSTAL".

View the file

Other files

File Type Posted
CN-550000-ASK42-00010000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

RAILROAD CHANGE ORDER NO. 2

725-090-04B

RAIL

OGC – 1/21

Financial Project Number Road Name or Number County Name Parcel & R/W

Number

FAP

Number

436734-2-57-01 SR 674/College Ave Hillsborough 73 (10120-2150) N/A

A. 1. The CSX Transportation Inc. Company is hereby authorized to observe the following changes in the plans and or specifications to the subject Railroad Agreement, and to perform such work accordingly, further described as:

Additional Funds needed due to credit memo error. Work is for replacement of timber and asphalt crossing with concrete panels and any other work deemed necessary for the completion of this project.

Crossing 624767N, AZA 897.31

2. Exhibit A, Exhibit B, and Exhibit C are attached to the Railroad Change Order and made part of the Original

Railroad Agreement.

3. The items of work covered by this Change Order are referenced to an Master Agreement of record dated 8/7/1972 and no supplemental Agreement is required.

Master Type: Crossing Surface Signals Preliminary Engineering

B. 1. The Railroad Relocation Work is to conform to that shown by the railroad adjustment plans as:

a. ATTACHED

b. X INCLUDED IN THE HIGHWAY CONTRACT PLANS

2. Reimbursement for the cost of this Railroad Work is to be in accord with the provisions set forth in Administrative Rule Chapter 14-57 as:

a. NONREIMBURSABLE – Section .011(2)

b. X REIMBURSABLE – Section .011(2)

(1) X Force Account Method

(2) Lump Sum Method

(3) Third Party Contract Method

C. ESTIMATED COST OF WORK DUE TO THIS CHANGE ORDER

ITEM

NO.

ITEM UNIT UNIT

PRICE

WORK ELIMINATED (-)

QTY AMOUNT

ADDITIONAL WORK (+)

QTY AMOUNT

Replace Crossing with Concrete 360,037.00 383,037.00 panels

Sub-Totals ………………………………………………………………… $360,037.00 $383,037.00 Net Cost of Construction Changes, this order ………………………... $ $23,000.00 Cost of Construction Changes, previously ordered ………………….. $ $360,037.00 Net Total Cost of Construction Changes, to date…………………………………………….. $383,037.00 Contract Amount ………………………………………………………………………………… $0.00 Estimated Cost of Work Authorized, to date………………………………………………….. $383,037.00

Examined as to provisions and participating items of cost:

Recommended: Approved: Approved: N/A Date Date Date

Exempt From FHWA Review Kenneth Madden

District Rail Coordinator Richard Moss PE

Director of Transportation Development

Division Administrator N/A

Federal Highway Administration

DocuSign Envelope ID: BF6C2F3B-B2C2-4FF2-AD6A-5C13B5327831

4/22/2021 | 8:35 AM EDT 4/22/2021 | 1:30 PM EDT

725-090-04B

RAIL

OGC – 1/21

EXHIBIT A

The Company shall:

1. utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the Company during the term of the contract; and

2. include an express requirement in any subcontract that subcontractors performing work or providing services pursuant to the state contract utilize the U.S. Department of Homeland Security’s E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.

EXHIBIT B

The Company shall:

1. adhere to all Buy America requirements (23 CFR 635.410) to ensure that all manufacturing processes of steel and iron occur in the United States; and

2. ensure that prefabricated items that contain steel must also comply with Buy America; and

3. provide Buy America certifications that include correct language, project information, and the material’s delivery date.

EXHIBIT C

The Company understands:

1. that while FHWA1273 does not apply to force account work performed by rail companies, FHWA-assistance is subject to Title VI (42 U.S.C. § 2000d et seq); and

2. requires appropriate assurances by providing an executed Title VI / Nondiscrimination Assurance, including Appendices A and E.

FLORIDA DEPARTMENT OF TRANSPORTATION

FUNDS APPROVAL

ASF50

4/15/2021

CONTRACT INFORMATION

FUNDS APPROVAL INFORMATION

FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 4/15/2021

Action: Task Work Order

Reviewed or Approved: APPROVED

Organization Code: 55074010706

Expansion Option: A5

Object Code: 563000

Amount: $23,000.00

Financial Project: 43673425701

Work Activity (FCT): 127

CFDA:

Fiscal Year: 2021

Budget Entity: 55150200

Category/Category Year: 088716/21

Amendment ID: W002

Sequence: 00

User Assigned ID: CO#2

Enc Line (6s)/Status: 0002/04

Total Amount: $23,000.00

Contract: ASF50

Contract Type: AC - RR CROSSING-PE/INSTAL (RR-XING/PE)

Vendor Name: CSX TRANSPORTATION, INC.

Vendor ID: F546000720022

Beginning Date of This Agreement: 09/13/2019

Ending Date of This Agreement: 12/31/2050

Contract Total/Budgetary Ceiling:

Method of Procurement: R - RAILROAD/UTILITIES AGREEMENT

Description: RR crossing replacement