CN-550000-ASE75.pdf
PDF 499 KB Posted
- Contract number
- ASE75
- Issued by
- Florida
About this file
This document is a Utility Work Order Change No. 1 issued by the Florida Department of Transportation (FDOT) for a utility relocation project involving Florida Power & Light (FPL) in Palm Beach County. The project is associated with the I-95 at SR-806/Atlantic Avenue Interchange and has a Financial Project ID of 434722-1-56-07 and a Federal Project ID of 0951 681 I. The work order is specifically for utility lighting work and is addressed to Ms. April Madison of FPL Distribution.
The utility relocation work is reimbursable and has a total authorized cost of $40,000.00. The cost breakdown includes $7,479.00 for Construction Engineering, $12,652.00 for Construction Labor, and $19,869.00 for Materials and Supplies. The work is to conform to utility adjustment plans and is referenced to an original agreement dated 2/28/1972. The project involves relocating lighting infrastructure at the I-95 and SR-806/Atlantic Avenue Interchange, with the work to be performed under the direction of FDOT's District Construction Engineer/Maintenance Engineer. The document was recommended on 07/19/19 and approved on 7/19/2019 by FDOT personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-550000-ASE75-00010000.pdf | ||
| CN-550000-BEB76-W0050100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .