CN-550000-ASE53.pdf

PDF 613 KB Posted

Attached to
Master Agreement FL|ASE53|19472de4d2c5b03b1e4e36ec05e96a2d
Contract number
ASE53
Issued by
Florida

About this file

This is a Utility Work Order Change document from the Florida Department of Transportation (FDOT) involving Florida Power & Light Company (FPL) for a utility relocation project in Palm Beach County. The document includes a Notice to Proceed letter, a Utility Work Order Change No. 1, a Required Contract Provisions document, a Utility Work Estimate, and a Funds Approval form. The project is associated with Financial Project ID 436894-4-56-01 and Federal Project ID D419-053-B, specifically referencing utility relocation work on Seminole Drive at L-16 Canal.

The utility work change authorizes a total reimbursable cost of $109,209.06 for construction engineering, construction labor, and materials/supplies. The contract is a railroad/utilities agreement with a beginning date of 06/18/2019 and an ending date of 06/19/2024. The work involves relocating FPL utility infrastructure, with costs broken down into construction engineering ($21,841.81), construction labor ($54,604.53), and materials and supplies ($32,762.72). The funds were approved on 06/18/2019 by the FDOT Comptroller, with the total contract/budgetary ceiling set at the total reimbursement amount of $109,209.00.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .