This is a Railroad Change Order document from the Florida Department of Transportation (FDOT) involving CSX Transportation, Inc. for a railroad crossing reconstruction project in Hillsborough County, specifically on CR 580 (Sam Allen Road) from west of SR 39 (Paul Buchman Highway) to east of Park Road in Plant City. The project is federally funded by the Federal Highway Administration (FHWA) and involves coordination between FDOT, CSX Transportation, and potentially other local and state agencies.

The change order authorizes crossing reconstruction and upgrades with a total estimated cost of $508,902.00, to be fully funded by the agency. The project includes reconstructing a 112' double track concrete surface with new flagging and CEI elements, replacement of existing crossing surfaces, and associated roadway work. The contract (ASA14) is set to begin on 05/03/2018 and has an end date of 12/31/2050. The work will involve track panel replacement, surfacing, ballast installation, and other railroad infrastructure improvements. The project requires compliance with E-Verify employment eligibility verification and will be conducted with full crossing closure during work by Railroad Forces.

View the file

Other files

File Type Posted
CN-550000-ASA14-W0010000.pdf PDF
CN-550000-C9L13-00120000.pdf PDF
CN-550000-ASA14-W0020000.pdf PDF
CN-550000-ASA14-W0030000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .