CN-550000-AS688-W0010000.pdf

PDF 374 KB Posted

Attached to
Master Agreement FL|AS688|3f6644f02c01cfe155ed6b7014577bd6
Contract number
AS688
Issued by
Florida

About this file

This document is a Railroad Change Order No. 1 issued by the Florida Department of Transportation (FDOT), involving CSX Transportation, Inc. as the primary contractor. The change order pertains to a project on SR 710 at Nubbin Slough in Okeechobee County, Florida, and is associated with a Master Agreement dated 9/15/1998. The document includes a Funds Approval form dated 7/11/2017 and an Exhibit A detailing employment verification requirements.

The contract is for preliminary engineering work related to railroad crossing upgrades, with a total authorized cost of $15,000.00. The agreement runs from 07/10/2017 to 07/12/2027, classified as an AC-RR Crossing-PE/INSTAL (RX-XING/PE) contract procured through a Railroad/Utilities Agreement. The work involves preliminary engineering review of plans to determine drainage upgrades to SR 710 at Nubbin Slough, including adjacent CSX trestle work and Railroad Crossing No. 628070-D. The contract requires the use of the U.S. Department of Homeland Security's E-Verify system for employment eligibility verification for both the company and its subcontractors.

View the file

Other files

File Type Posted
CN-550000-C9E13-W0070000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .