CN-370000-WQ008-T10.pdf
PDF 193 KB Posted
- Contract number
- WQ008
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form for Task 10 under Florida Department of Environmental Protection (FDEP) Contract No. WQ008. The task is assigned to Locher Environmental Technology, LLC, with Kevin Locher as the contractor representative and Richard Hicks as the FDEP Contract Manager. The assignment, dated September 16, 2014, pertains to the construction and operation of a real-time water quality monitoring station at Convict Springs, which will be operated by the Suwannee River Water Management District.
Task 10 encompasses three primary components: instrumentation ($19,803.53), in-house integration services ($8,280.00), and field installation services ($23,674.50), totaling $51,758.03. The scope includes procuring water quality monitoring equipment such as Campbell Scientific dataloggers, wireless modems, sensors, and telemetry systems; integrating these components for 15-minute measurement intervals with data transmission to a VDV Web Server; and installing the complete system on-site with operational testing. The system will collect and transmit water quality data on-site at 15-minute intervals from Convict Springs. Performance measures require deliverables review by the FDEP Contract Manager, with no payment issued for unsatisfactory work. The period of performance extends through February 13, 2015. Funding is allocated from budget entity 300100, Fund 000286, Fiscal Year 12, with a total task assignment value of $51,758.03.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .