CN-370000-WM998-T18CO1.pdf
PDF 4 MB Posted
- Contract number
- 12007
- Issued by
- Florida
About this file
This document is a Task Assignment Change Order for Task Assignment 18 under DEP Contract No. WM998, issued by the Florida Department of Environmental Protection (DEP) and executed by Wildwood Consulting, Inc. The contract pertains to Statewide Facilitation Services, specifically focusing on providing technical support for the Middle St. Johns River Total Maximum Daily Loads (TMDLs) and Basin Management Action Plans (BMAPs).
The scope of work involves basin-specific meeting facilitation, stakeholder engagement, and support for the TMDL and BMAP Programs across several water basins including Lake Jesup-Crane Strand-Long Branch Basins, Lakes Harney, Monroe, Middle St. Johns, Smith Canal, Wekiva River and Wekiva Springs, and Volusia Blue Springs. Wildwood Consulting will provide services such as meeting management, stakeholder coordination, development of basin-specific plans, preparation of meeting materials, and tracking of pollutant load reduction strategies. The maximum budget for Task 1 is $249,536.55, with a personnel cost of $231,043.00, and the contract period runs through October 31, 2016, with the option to extend time without changing funding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-WQ012-TA2.pdf | ||
| CN-370000-WM998-T19CO1.pdf | ||
| CN-370000-WQ012.pdf | ||
| CN-430000-D2164.pdf | ||
| CN-370000-WQ012-TA3.pdf | ||
| CN-370000-WQ012-TA4.pdf | ||
| CN-370000-WM998.pdf | ||
| CN-370000-WQ012-TA1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .